Federal Railroad Administration April 2023 – Federal Register Recent Federal Regulation Documents

Regulations Governing Certain Positive Train Control System Outages
Document Number: 2023-08839
Type: Notice
Date: 2023-04-27
Agency: Federal Railroad Administration, Department of Transportation
The purpose of this notice is to inform the public about FRA's regulations that currently govern certain outages of positive train control (PTC) systems during, for example, infrastructure upgrades and capital projects. This notice also contains information about the process a railroad must follow to obtain FRA's approval before temporarily disabling its PTC system for such purposes.
Massachusetts Bay Transportation Authority's Request for Approval To Begin Field Testing on Its Positive Train Control Network
Document Number: 2023-08746
Type: Notice
Date: 2023-04-26
Agency: Federal Railroad Administration, Department of Transportation
This document provides the public with notice that, on April 11, 2023, the Massachusetts Bay Transportation Authority (MBTA) submitted a request to field test its trains that have been equipped with MBTA's Advanced Civil Speed Enforcement System II (ACSES II) technology on its South Coast Rail commuter rail lines. MBTA states that the tests will be performed and operation verified for all ACSES II PTC functions. FRA is publishing this notice and inviting public comment on MBTA's request to test its PTC system.
Request for Information Regarding Uses for Used Creosote-Treated Railroad Ties
Document Number: 2023-08689
Type: Notice
Date: 2023-04-25
Agency: Federal Railroad Administration, Department of Transportation
The Federal Railroad Administration is seeking information on potential uses and options for disposal or repurposing used creosote- treated railroad ties (CTRTs), which are the wooden rail crossties that support the rail track. Every year, approximately 23 million CTRTs are replaced along the nation's rail network. Because a number of FRA's grant programs fund rail infrastructure projects, which may include the replacement of worn CTRTs, understanding the options to dispose of CTRTs will assist FRA and its grantees from the implementation of FRA's grant programs and assessing the impacts of such disposition (e.g., life-cycle maintenance impacts). Depending on the responses, FRA may develop a best practices document for rail tie disposal.
Massachusetts Bay Transportation Authority's Request To Amend Its Positive Train Control System
Document Number: 2023-08456
Type: Notice
Date: 2023-04-21
Agency: Federal Railroad Administration, Department of Transportation
This document provides the public with notice that, on April 7, 2023, the Massachusetts Bay Transportation Authority (MBTA) submitted a request for amendment (RFA) to its FRA-certified positive train control (PTC) system in order to support the implementation of PTC on its commuter rail network. On MBTA's North Side, the PTC System in the area is being reconfigured and must be taken out of service during the recommissioning of Automatic Train Control (ATC) and the subsequent recommissioning of MBTA's Advanced Civil Speed Enforcement System II (ACSES II). FRA is publishing this notice and inviting public comment on the railroad's RFA to its PTC system.
Proposed Agency Information Collection Activities; Comment Request
Document Number: 2023-08413
Type: Notice
Date: 2023-04-21
Agency: Federal Railroad Administration, Department of Transportation
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, FRA seeks approval of the Information Collection Request (ICR) abstracted below. Before submitting this ICR to the Office of Management and Budget (OMB) for approval, FRA is soliciting public comment on specific aspects of the activities identified in the ICR.
Petition for Modification of Waiver of Compliance
Document Number: 2023-08497
Type: Notice
Date: 2023-04-21
Agency: Federal Railroad Administration, Department of Transportation
Petition for Extension of Waiver of Compliance
Document Number: 2023-08496
Type: Notice
Date: 2023-04-21
Agency: Federal Railroad Administration, Department of Transportation
Metro-North Railroad's Request To Amend Its Positive Train Control Safety Plan and Positive Train Control System
Document Number: 2023-08282
Type: Notice
Date: 2023-04-19
Agency: Federal Railroad Administration, Department of Transportation
This document provides the public with notice that, on April 11, 2023, Metro-North Railroad (MNR) submitted a request for amendment (RFA) to its FRA-approved Positive Train Control Safety Plan (PTCSP). As this RFA involves a request for FRA's approval of proposed material modifications to an FRA-certified positive train control (PTC) system, FRA is publishing this notice and inviting public comment on the railroad's RFA to its PTCSP. MNR state that this RFA is for an update to MNR's PTC Onboard Software, release OBC 5.04.000, correcting existing defects. With the successful completion of Factory and Field Testing and Supplier Safety Certification, MNR confirms the changes meet all technical requirements, provide an equivalent or greater level of safety than the existing PTC System in service, and does not adversely impact interoperability with tenant railroads.
Proposed Agency Information Collection Activities; Comment Request
Document Number: 2023-07718
Type: Notice
Date: 2023-04-12
Agency: Federal Railroad Administration, Department of Transportation
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, this notice announces that FRA is forwarding the Information Collection Request (ICR) abstracted below to the Office of Management and Budget (OMB) for review and comment. The ICR describes the information collection and its expected burden. On January 20, 2023, FRA published a notice providing a 60-day period for public comment on the ICR.
Proposed Agency Information Collection Activities; Comment Request
Document Number: 2023-07717
Type: Notice
Date: 2023-04-12
Agency: Federal Railroad Administration, Department of Transportation
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, this notice announces that FRA is forwarding the Information Collection Request (ICR) abstracted below to the Office of Management and Budget (OMB) for review and comment. The ICR describes the information collection and its expected burden. On January 20, 2023, FRA published a notice providing a 60-day period for public comment on the ICR.
Massachusetts Bay Transportation Authority's Request To Amend Its Positive Train Control System
Document Number: 2023-07559
Type: Notice
Date: 2023-04-11
Agency: Federal Railroad Administration, Department of Transportation
This document provides the public with notice that, on March 23, 2023, the Massachusetts Bay Transportation Authority (MBTA) submitted a request for amendment (RFA) to its FRA-certified positive train control (PTC) system in order to support the reconfiguration of its underlying Automatic Train Control (ATC) system on its commuter rail network. On MBTA's South Side, the ATC System in the area is being reconfigured requiring the PTC system to be taken out of service during the reconfiguration as well as during the recommissioning of the ATC system and MBTA's Advanced Civil Speed Enforcement System II (ACSES II). FRA is publishing this notice and inviting public comment on MBTA's RFA to its PTC system.
Railroads' Joint Request To Amend Their Positive Train Control Safety Plans and Positive Train Control Systems
Document Number: 2023-07558
Type: Notice
Date: 2023-04-11
Agency: Federal Railroad Administration, Department of Transportation
This document provides the public with notice that on March 22, 2023, twenty host railroads submitted a joint request for amendment (RFA) to their FRA-approved Positive Train Control Safety Plans (PTCSP) reflecting the updated PTC onboard software, I-ETMS On-Board 6.5.0 and On-Board 6.5.1. This RFA includes modifications to the associated PTC Concept of Operations and PTC System Description documents, change or addition of system safety-critical functionality, modification to target safety levels and changes to the human-machine interface which requires amendments to PTC training for train crews. The functionality changes include: updates to Train Restriction Types to address the Pipeline and Hazardous Materials Safety Administration (PHMSA) final rule which restricts operating speeds of High-Hazard Flammable Train; the addition of a new system safety critical function, PTC Suspension, that prevents the generation and enforcement of targets within the limits of a PTC Suspension area with the exception of navigation failure and synchronization errors; and updates to the onboard display to show prompting to the train crew whenever a system fault related to braking prediction calculation exits. As this joint RFA involves requests for FRA's approval of the proposed material modifications to FRA-certified positive train control (PTC) systems, FRA is publishing this notice and inviting public comment on railroads' joint RFA to their PTCSPs.
Safety Advisory 2023-02; Train Makeup and Operational Safety Concerns
Document Number: 2023-07579
Type: Notice
Date: 2023-04-11
Agency: Federal Railroad Administration, Department of Transportation
FRA is issuing Safety Advisory 2023-02 to emphasize significant concerns related to train makeup and to ensure that all railroads exercise due diligence and recognize the importance of taking proactive measures to address potential safety risks related to operating train builds with varying configurations, load and empty placement, distributed power arrangements, and other factors. FRA has noticed a rising trend in recent incidents where train build and makeup have been identified as a potential cause or contributing factor. In response, FRA incorporates train simulations into its investigative process when it is suspected that high in-train forces may have contributed to train accidents. To address these concerns, FRA is providing recommendations for freight railroads to improve the safety of their train build processes and practices.
Petition for Extension of Waiver of Compliance
Document Number: 2023-07575
Type: Notice
Date: 2023-04-11
Agency: Federal Railroad Administration, Department of Transportation
Railroads' Joint Request To Amend Their Positive Train Control Safety Plans and Positive Train Control Systems
Document Number: 2023-07400
Type: Notice
Date: 2023-04-10
Agency: Federal Railroad Administration, Department of Transportation
This document provides the public with notice that, on March 15, 2023, three host railroads submitted a joint request for amendment (RFA) to their FRA-approved Positive Train Control Safety Plans (PTCSP). As this joint RFA involves requests for FRA's approval of updated onboard software that will materially modify their FRA- certified positive train control (PTC) systems, FRA is publishing this notice and inviting public comment on railroads' joint RFA to their PTCSPs.
Review of Quiet Zone in Deerfield Beach, Pompano Beach, Fort Lauderdale, Oakland Park, Wilton Manors, Dania Beach, Hollywood, and Hallandale Beach, Florida
Document Number: 2023-07293
Type: Notice
Date: 2023-04-07
Agency: Federal Railroad Administration, Department of Transportation
FRA is providing notice of its intent to review a quiet zone located in Deerfield Beach, Pompano Beach, Fort Lauderdale, Oakland Park, Wilton Manors, Dania Beach, Hollywood, and Hallandale Beach, Florida (Cities). Based on a high rate of reported accidents/incidents and related injuries and fatalities that occurred between January and December 2022, FRA has made a preliminary determination that the safety systems and measures implemented within the quiet zone do not fully compensate for the absence of routine sounding of locomotive horns due to a substantial increase in risk. In addition, FRA has made a preliminary determination of significant risk with respect to loss of life or serious personal injury within the quiet zone. Therefore, FRA intends to review existing conditions within the quiet zone to determine whether the quiet zone should be terminated or whether additional safety measures may be necessary to ensure motorist and pedestrian safety.
Petition for Extension of Waiver of Compliance
Document Number: 2023-07325
Type: Notice
Date: 2023-04-07
Agency: Federal Railroad Administration, Department of Transportation
Petition for Extension of Waiver of Compliance
Document Number: 2023-07324
Type: Notice
Date: 2023-04-07
Agency: Federal Railroad Administration, Department of Transportation
Petition for Expansion of Waiver of Compliance
Document Number: 2023-07323
Type: Notice
Date: 2023-04-07
Agency: Federal Railroad Administration, Department of Transportation
Petition for Extension of Waiver of Compliance
Document Number: 2023-07322
Type: Notice
Date: 2023-04-07
Agency: Federal Railroad Administration, Department of Transportation
Metro-North Railroad's Request To Amend Its Positive Train Control System
Document Number: 2023-07124
Type: Notice
Date: 2023-04-06
Agency: Federal Railroad Administration, Department of Transportation
This document provides the public with notice that, on March 3 and 15, 2023, Metro-North Railroad (MNR) submitted a request for amendment (RFA) to its FRA-certified positive train control (PTC) system, the Advanced Civil Speed Enforcement System II (ACSES II), in order to support the construction of a new interlocking at Control Point 243 and associated adjacent signal system changes on MNR's New Haven Line in the vicinity of Norwalk, CT. The RFA proposes to establish an ACSES II Construction Zone (CZ) through the installation of transponders during the interlocking construction. This RFA does not propose any changes to safety critical elements of the ACSES II PTC system.
Petition for Waiver of Compliance
Document Number: 2023-06993
Type: Notice
Date: 2023-04-04
Agency: Federal Railroad Administration, Department of Transportation
Petition for Extension of Waiver of Compliance
Document Number: 2023-06992
Type: Notice
Date: 2023-04-04
Agency: Federal Railroad Administration, Department of Transportation
Petition for Extension of Waiver of Compliance
Document Number: 2023-06991
Type: Notice
Date: 2023-04-04
Agency: Federal Railroad Administration, Department of Transportation
Petition for Extension of Waiver of Compliance
Document Number: 2023-06990
Type: Notice
Date: 2023-04-04
Agency: Federal Railroad Administration, Department of Transportation
Passenger Equipment Safety Standards; Standards for High-Speed Trainsets
Document Number: 2023-05576
Type: Proposed Rule
Date: 2023-04-03
Agency: Federal Railroad Administration, Department of Transportation
FRA is proposing to amend its Passenger Equipment Safety Standards to modernize Tier I and Tier III safety appliance requirements; update the pre-revenue compliance documentation and testing requirements; establish crashworthiness requirements for individual Tier I-compliant vehicles equipped with crash energy management (CEM); establish standards for Tier III inspection, testing, and maintenance (ITM) and movement of defective equipment (MODE); incorporate general safety requirements from FRA's Railroad Locomotive Safety Standards for Tier III trainsets; and provide for periodic inspection of emergency lighting to ensure proper functioning.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.