Federal Railroad Administration May 28, 2015 – Federal Register Recent Federal Regulation Documents

Agency Request for Emergency Processing of Collection of Information by the Office of Management and Budget
Document Number: 2015-12776
Type: Notice
Date: 2015-05-28
Agency: Federal Railroad Administration, Department of Transportation
FRA hereby gives notice that it is submitting the following Information Collection request (ICR) to the Office of Management and Budget (OMB) for emergency processing under the Paperwork Reduction Act of 1995. FRA requests that OMB authorize the collection of information identified below by May 26, 2015, for a period of 180 days.
Systems for Telephonic Notification of Unsafe Conditions at Highway-Rail and Pathway Grade Crossings
Document Number: 2015-12775
Type: Rule
Date: 2015-05-28
Agency: Federal Railroad Administration, Department of Transportation
The purpose of this document is to update the current schedule of civil penalties for violations of FRA's grade crossing safety regulations by adding recommended civil penalty amounts for violations of specific requirements contained in a recently added subpart. That subpart prescribes requirements that certain railroads establish emergency notification systems (ENS) for receiving toll-free telephone calls reporting various unsafe conditions at highway-rail grade crossings and pathway grade crossings, and for taking certain actions in response to those calls.
Emergency Order Under 49 U.S.C. 20104 Establishing Requirements for the National Railroad Passenger Corporation To Control Passenger Train Speeds at Certain Locations Along the Northeast Corridor
Document Number: 2015-12774
Type: Notice
Date: 2015-05-28
Agency: Federal Railroad Administration, Department of Transportation
FRA is issuing this emergency order (EO or Order) to require that the National Railroad Passenger Corporation (Amtrak) take actions to control passenger train speed at certain locations on main line track in the Northeast Corridor (as described by 49 U.S.C. 24905(c)(1)(A)). Amtrak must immediately implement code changes to its Automatic Train Control (ATC) System to enforce the passenger train speed limit ahead of the curve at Frankford Junction in Philadelphia, Pennsylvania, where a fatal accident occurred on May 12, 2015. Amtrak must also identify each main track curve on the Northeast Corridor where there is a significant reduction (more than 20 miles per hour (mph)) from the maximum authorized approach speed to those curves for passenger trains. Amtrak must then develop and comply with an FRA- approved action plan to modify its existing ATC System or other signal systems (or take alternative operational actions) to enable enforcement of passenger train speed limits at the identified curves. Amtrak must also install additional wayside passenger train speed limit signage at appropriate locations on its Northeast Corridor right-of-way.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.