Environmental Protection Agency September 18, 2019 – Federal Register Recent Federal Regulation Documents
Results 1 - 5 of 5
Ocean Disposal; Designation of an Ocean Dredged Material Disposal Site for the Southern Maine, New Hampshire, and Northern Massachusetts Coastal Region
The Environmental Protection Agency (EPA) today proposes to designate one ocean dredged material disposal site (ODMDS), the Isles of Shoals North Disposal Site (IOSN), located approximately 10.8 nautical miles (nmi) east of Portsmouth, New Hampshire, pursuant to the Marine Protection, Research and Sanctuaries Act, as amended (MPRSA). This action is necessary to serve the long-term need for an ODMDS for the possible future disposal of suitable dredged material from harbors and navigation channels in southern Maine, New Hampshire, and northern Massachusetts. The proposed action is described in a Draft Environmental Assessment and Evaluation Study (DEA) also being released today for public comment. The DEA recommends designation of the proposed IOSN pursuant to the MPRSA as the preferred alternative from the range of options considered. The draft Site Management and Monitoring Plan (SMMP) is provided as Appendix G of the DEA.
Approval and Promulgation of Air Quality Implementation Plans; Maryland; Infrastructure Requirements for the 2015 Ozone National Ambient Air Quality Standard
The Environmental Protection Agency (EPA) is approving a state implementation plan (SIP) revision submitted by the State of Maryland for the 2015 ozone national ambient air quality standard (NAAQS or standard). Whenever EPA promulgates a new or revised NAAQS, states are required to make a SIP submission showing how the existing approved SIP has all the provisions necessary to meet certain SIP requirements for the new or revised NAAQS, or to add any needed provisions necessary to meet these requirements. The SIP revision is required to address basic program elements, including, but not limited to, regulatory structure, monitoring, modeling, legal authority, and adequate resources necessary to assure attainment and maintenance of the standards. These elements are referred to as infrastructure requirements. Maryland has made a submittal addressing the infrastructure requirements for the 2015 ozone NAAQS. EPA is approving Maryland's SIP revision addressing the infrastructure requirements for the 2015 ozone NAAQS in accordance with the requirements of section 110(a) of the Clean Air Act (CAA).
Significant New Use Rules on Certain Chemical Substances
EPA is issuing significant new use rules (SNURs) under the Toxic Substances Control Act (TSCA) for 26 chemical substances which are the subject of premanufacture notices (PMNs) and deferring action on one chemical substance. The chemical substances are subject to Orders issued by EPA pursuant to section 5(e) of TSCA. This action requires persons who intend to manufacture (defined by statute to include import) or process any of these 26 chemical substances for an activity that is designated as a significant new use by this rule to notify EPA at least 90 days before commencing that activity. The required notification initiates EPA's evaluation of the use, under the conditions of use for that chemical substance, within the applicable review period. Persons may not commence manufacture or processing for the significant new use until EPA has conducted a review of the notice, made an appropriate determination on the notice, and has taken such actions as are required by that determination.
Significant New Use Rules on Certain Chemical Substances (17-3)
EPA is issuing significant new use rules (SNURs) under the Toxic Substances Control Act (TSCA) for 19 chemical substances which are the subject of premanufacture notices (PMNs). The chemical substances are subject to Orders issued by EPA pursuant to TSCA section 5(e). This action requires persons who intend to manufacture (defined by statute to include import) or process any of these 19 chemical substances for an activity that is designated as a significant new use by this rule to notify EPA at least 90 days before commencing that activity. The required notification initiates EPA's evaluation of the use, under the conditions of use for that chemical substance, within the applicable review period. Persons may not commence manufacture or processing for the significant new use until EPA has conducted a review of the notice, made an appropriate determination on the notice, and has taken such actions as are required by that determination.
Air Plan Approval; New Mexico; Infrastructure for the 2015 Ozone National Ambient Air Quality Standards and Repeal of State Regulations for Total Suspended Particulate
Pursuant to the Federal Clean Air Act (CAA or the Act), the Environmental Protection Agency (EPA) is approving State Implementation Plan (SIP) infrastructure certifications from the State of New Mexico and Albuquerque-Bernalillo County to address CAA section 110(a)(1) and (2) requirements for the 2015 ozone (O3) National Ambient Air Quality Standards (NAAQS). The submittals address how the existing SIP provides for the implementation, maintenance, and enforcement of the 2015 O3 NAAQS (infrastructure SIP or i-SIP). The i-SIP ensures that the New Mexico SIP is adequate to meet the state's responsibilities under the CAA for this NAAQS. The EPA is also approving a SIP revision for the repeal of the New Mexico Ambient Air Quality Standards (NMAAQS) for total suspended particulate (TSP) in the New Mexico regulations incorporated into the SIP.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.