Air Plan Approval; Wisconsin; Title V Operation Permit Program
Document Number: 2019-16336
Type: Rule
Date: 2019-07-31
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is approving updates and revisions to the Wisconsin title V Operation Permit Program, submitted by Wisconsin pursuant to subchapter V of the Clean Air Act (Act), which requires states to develop, and to submit to EPA for approval, programs for issuing operation permits to all major stationary sources. The revision was submitted to update the title V program since the final approval of the program in 2001 and to change the permit fee schedule for subject facilities. The revision consists of amendments to Chapter Natural Resources (NR) 407 Wisconsin Administrative Code, operation permits, Chapter NR 410 Wisconsin Administrative Code, permit fees, and Wisconsin statute 285.69, fee structure. This approval action will help ensure that Wisconsin properly implements the requirements of title V of the Act.
Air Plan Approval; Wisconsin; Title V Operation Permit Program
Document Number: 2019-16335
Type: Proposed Rule
Date: 2019-07-31
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve updates and revisions to the Wisconsin title V Operation Permit Program, submitted by Wisconsin pursuant to subchapter V of the Clean Air Act (Act), which requires states to develop, and to submit to EPA for approval, programs for issuing operation permits to all major stationary sources. The revision was submitted to update the title V program since the final approval of the program in 2001 and to change the permit fee schedule for subject facilities. The revision consists of amendments to Chapter Natural Resources (NR) 407 Wisconsin Administrative Code, operation permits, Chapter NR 410 Administrative code, permit fees, and Wisconsin statute 285.69, fee structure. This approval action will help ensure that Wisconsin properly implements the requirements of title V of the Act.
Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Reasonably Available Control Technology (RACT) Determinations for Case-by-Case Sources Under the 1997 and 2008 8-Hour Ozone National Ambient Air Quality Standards; Part 1
Document Number: 2019-16330
Type: Proposed Rule
Date: 2019-07-31
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve multiple state implementation plan (SIP) revisions submitted by the Commonwealth of Pennsylvania. These revisions were submitted by the Pennsylvania Department of Environmental Protection (PADEP) to establish and require reasonably available control technology (RACT) for 26 major sources of volatile organic compounds (VOCs) and nitrogen oxides (NOX) pursuant to the Commonwealth of Pennsylvania's conditionally approved RACT regulations. In this rulemaking action, EPA is only proposing to approve source-specific (also referred to as ``case-by-case'') RACT determinations for 21 of the 26 major sources submitted by PADEP. These RACT evaluations were submitted to meet RACT requirements for the 1997 and 2008 ozone national ambient air quality standards (NAAQS). This action is being taken under the Clean Air Act (CAA).
Reclassification of Major Sources as Area Sources Under Section 112 of the Clean Air Act
Document Number: 2019-16321
Type: Proposed Rule
Date: 2019-07-31
Agency: Environmental Protection Agency
On June 25, 2019, the Administrator of the U.S. Environmental Protection Agency (EPA) signed the proposed rulemaking ``Reclassification of Major Sources as Area Sources Under Section 112 of the Clean Air Act.'' The EPA also requested public comment on the proposed action. The EPA is announcing that it will hold a public hearing to provide interested parties the opportunity to present data, views, or arguments concerning the proposed action.
National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Intel Corp. (Santa Clara III) Superfund Site
Document Number: 2019-16320
Type: Proposed Rule
Date: 2019-07-31
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) Region 9 is issuing a Notice of Intent to Delete the Intel Corp. (Santa Clara III) Superfund Site (Site) located in Santa Clara, California, from the National Priorities List (NPL) and requests public comments on this proposed action. The NPL, promulgated pursuant to section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). EPA and the State of California, through the San Francisco Regional Water Quality Control Board (RWQCB), have determined that all appropriate response actions under CERCLA have been completed. However, this deletion does not preclude future actions under Superfund.
Proposed Determinations of Light-Duty Vehicle Alternative Greenhouse Gas Emissions Standards for Small Volume Manufacturers
Document Number: 2019-16319
Type: Notice
Date: 2019-07-31
Agency: Environmental Protection Agency
EPA is requesting comment on proposed determinations of alternative light-duty vehicle greenhouse gas emissions standards for small volume manufacturers. The alternative standards are proposed pursuant to small volume manufacturer provisions in EPA's light-duty vehicle greenhouse gas regulations. Four small volume manufacturers have applied for alternative standards: Aston Martin, Ferrari, Lotus and McLaren. The alternative standards in these determinations cover model years 2017-2021.
Registration Review Proposed Interim Decisions for Several Pesticides; Notice of Availability
Document Number: 2019-16315
Type: Notice
Date: 2019-07-31
Agency: Environmental Protection Agency
This notice announces the availability of EPA's proposed interim registration review decisions and opens a 60-day public comment period on the proposed interim decisions for the following pesticides: 2,4-DB, 3-Methyl-2-cyclohexen-1-one, alkyl imidazolines, bromoxynil, dikegulac sodium, fluthiacet-methyl, imazalil, inorganic polysulfides (also known as lime sulfur), IR3535, linuron, octenol, o-benzyl-p- chlorophenol, p-Menthane-3,8-diol (PMD), pyridaben, starlicide, uniconazole-P, tri-n butyl tetradecyl phosphonium chloride, zinc and zinc salts, and zoxamide. This notice also announces the availability of EPA's human health and ecological risk assessments for the pesticides alkyl imidazolines, uniconazole-P, dikegulac sodium (ecological risk assessment only), and zoxamide, and opens a 60-day public comment period on the risk assessments.
Air Plan Approval and Air Quality Designation; New Hampshire; Redesignation of the Central New Hampshire Sulfur Dioxide Nonattainment Area
Document Number: 2019-16271
Type: Proposed Rule
Date: 2019-07-31
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve the maintenance plan and redesignation request submitted by the State of New Hampshire for the Central New Hampshire nonattainment area for the 2010 1-hour sulfur dioxide (SO2) national ambient air quality standard (NAAQS). This nonattainment area consists of portions of Hillsborough County, Merrimack County, and Rockingham County, New Hampshire. The primary emission source in the nonattainment area is now subject to federally-enforceable emission control standards, and air quality in the area now meets the 2010 SO2 NAAQS. This action is being taken under the Clean Air Act.
Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Mineral Wool Production (Renewal)
Document Number: 2019-16228
Type: Notice
Date: 2019-07-31
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), NESHAP for Mineral Wool Production (EPA ICR Number 1799.10, OMB Control Number 2060-0362), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through September 30, 2019. Public comments were previously requested, via the Federal Register, on May 30, 2018 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Magnetic Tape Manufacturing Operations (Renewal)
Document Number: 2019-16227
Type: Notice
Date: 2019-07-31
Agency: Environmental Protection Agency
The Environmental Protection Agency has submitted an information collection request (ICR), NESHAP for Magnetic Tape Manufacturing Operations (EPA ICR Number 1678.10, OMB Control Number 2060-0326), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through September 30, 2019. Public comments were previously requested, via the Federal Register, on May 30, 2018 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Oil and Natural Gas Production (Renewal)
Document Number: 2019-16226
Type: Notice
Date: 2019-07-31
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), NESHAP for Oil and Natural Gas Production (EPA ICR Number 1788.12, OMB Control Number 2060-0417), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through September 30, 2019. Public comments were previously requested, via the Federal Register, on May 30, 2018 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Halogenated Solvent Cleaners/Halogenated Hazardous Air Pollutants (Renewal)
Document Number: 2019-16225
Type: Notice
Date: 2019-07-31
Agency: Environmental Protection Agency
The Environmental Protection Agency has submitted an information collection request (ICR), NESHAP for Halogenated Solvent Cleaners/Halogenated Hazardous Air Pollutants (EPA ICR Number 1652.10, OMB Control Number 2060-0273), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through September 30, 2019. Public comments were previously requested, via the Federal Register, on May 30, 2018 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Duell & Gardner Landfill Superfund Site
Document Number: 2019-16200
Type: Proposed Rule
Date: 2019-07-31
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) Region 5 is issuing a Notice of Intent to Delete the Duell & Gardner Landfill Superfund Site (Duell & Gardner Site) located in Dalton Township, Muskegon County, Michigan, from the National Priorities List (NPL) and requests public comments on this proposed action. The NPL, promulgated pursuant to Section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Michigan, through the Michigan Department of Environment, Great Lakes and Energy (MDEGLE), have determined that all appropriate response actions under CERCLA, other than operation and maintenance, monitoring and five-year reviews, have been completed. However, this deletion does not preclude future actions under Superfund.
National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Duell & Gardner Landfill Superfund Site
Document Number: 2019-16199
Type: Rule
Date: 2019-07-31
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) Region 5 is publishing a direct final Notice of Deletion of the Duell & Gardner Landfill Superfund Site (Duell & Gardner Site), located in Dalton Township, Muskegon County, Michigan, from the National Priorities List (NPL). The NPL, promulgated pursuant to Section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). This direct final deletion is being published by EPA with the concurrence of the State of Michigan, through the Michigan Department of Environment, Great Lakes and Energy (MDEGLE) because EPA has determined that all appropriate response actions under CERCLA, other than operation and maintenance, monitoring and five-year reviews, have been completed. However, this deletion does not preclude future actions under Superfund.
National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Buckeye Reclamation Landfill Superfund Site
Document Number: 2019-16198
Type: Proposed Rule
Date: 2019-07-31
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) Region 5 is issuing a Notice of Intent to Delete the Buckeye Reclamation Landfill Superfund Site (Buckeye Site) located in St. Clairsville, Ohio, from the National Priorities List (NPL) and requests public comments on this proposed action. The NPL, promulgated pursuant to Section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). EPA and the State of Ohio (Ohio), through the Ohio Environmental Protection Agency (OEPA), have determined that all appropriate response actions under CERCLA, other than operation and maintenance, monitoring and five-year reviews, have been completed. However, this deletion does not preclude future actions under Superfund.
National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Buckeye Reclamation Landfill Superfund Site
Document Number: 2019-16197
Type: Rule
Date: 2019-07-31
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) Region 5 is publishing a direct final Notice of Deletion of the Buckeye Reclamation Landfill Superfund Site (Buckeye Site), located in St. Clairsville, Ohio from the National Priorities List (NPL). The NPL, promulgated pursuant to Section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). This direct final deletion is being published by EPA with the concurrence of the State of Ohio (Ohio), through the Ohio Environmental Protection Agency (OEPA), because EPA has determined that all appropriate response actions under CERCLA, other than operation and maintenance, monitoring and five-year reviews, have been completed. However, this deletion does not preclude future actions under Superfund.
Air Plan Approval; Kentucky; Interstate Transport (Prongs 1 and 2) for the 2010 1-Hour NO2
Document Number: 2019-16195
Type: Rule
Date: 2019-07-31
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is approving a State Implementation Plan (SIP) revision submitted by the Commonwealth of Kentucky, through the Kentucky Energy and Environment Cabinet by a letter dated November 16, 2018, for the purpose of addressing the Clean Air Act (CAA or Act) ``good neighbor'' interstate transport (prongs 1 and 2) infrastructure SIP requirements for the 2010 1-hour Nitrogen Dioxide (NO2) National Ambient Air Quality Standard (NAAQS). The CAA requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each NAAQS promulgated by EPA, commonly referred to as an ``infrastructure SIP.'' Specifically, EPA is finalizing approval of Kentucky's November 16, 2018, SIP revision addressing prongs 1 and 2 to ensure that air emissions in Kentucky do not significantly contribute to nonattainment or interfere with maintenance of the 2010 1-hour NO2 NAAQS in any other state.
Air Plan Approval; TN; Updates to the National Ambient Air Quality Standards for Chattanooga
Document Number: 2019-16194
Type: Rule
Date: 2019-07-31
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA or Agency) is taking final action to approve a revision to the Chattanooga portion of the Tennessee State Implementation Plan (SIP), provided by the State of Tennessee, through the Tennessee Department of Environment and Conservation from Chattanooga/Hamilton County Air Pollution Control Bureau by a letter dated September 12, 2018. The revision updates the National Ambient Air Quality Standards (NAAQS) in the Chattanooga portion of the Tennessee SIP. The amendments in the Tennessee SIP reflect recent revisions made to the federal NAAQS. EPA is approving the changes because they are consistent with the Clean Air Act (CAA or Act).
National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the South Minneapolis Residential Soil Contamination Superfund Site
Document Number: 2019-16192
Type: Rule
Date: 2019-07-31
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) Region 5 is publishing a direct final Notice of Partial Deletion of all but nine of approximately 3,632 properties located within the South Minneapolis Residential Soil Contamination Superfund Site in Minnesota from the National Priorities List (NPL). The NPL, promulgated pursuant to Section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan. This direct final partial deletion is being published by EPA with the concurrence of the State of Minnesota, through the Minnesota Department of Agriculture, because all appropriate response actions for these 3,623 properties under CERCLA have been completed. However, this partial deletion does not preclude future actions under Superfund. The nine properties not included in this partial deletion will remain on the NPL.
National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the South Minneapolis Residential Soil Contamination Superfund Site
Document Number: 2019-16191
Type: Proposed Rule
Date: 2019-07-31
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) Region 5 is issuing a Notice of Intent to Delete all but nine of approximately 3,632 properties located within the South Minneapolis Residential Soil Contamination Superfund Site (South Minn. Site) in Minneapolis, Minnesota from the National Priorities List (NPL) and requests public comments on this proposed action. The NPL, promulgated pursuant to Section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Minnesota, through the Minnesota Department of Agriculture (MDA), have determined that all appropriate response actions identified for these properties have been completed. However, this deletion does not preclude future actions under Superfund.
Air Plan Approval and Designation of Areas; FL; Redesignation of the Hillsborough County 2010 1-Hour Sulfur Dioxide Nonattainment Area to Attainment
Document Number: 2019-16070
Type: Proposed Rule
Date: 2019-07-31
Agency: Environmental Protection Agency
In a letter dated June 7, 2018, the State of Florida, through the Florida Department of Environmental Protection (FDEP), submitted a request for the Environmental Protection Agency (EPA) to redesignate the Hillsborough County sulfur dioxide (SO2) nonattainment area (hereinafter referred to as the ``Hillsborough County Area'' or ``Area'') to attainment for the 2010 1-hour SO2 primary national ambient air quality standard (NAAQS or standard) and to approve an accompanying State Implementation Plan (SIP) revision containing a maintenance plan for the Area. The submittal was received by EPA on June 12, 2018. Through a letter dated April 16, 2019, FDEP submitted a revision to the June 7, 2018, redesignation request and SIP revision asking EPA to incorporate certain conditions into the SIP from a recent permit revision applicable to the Tampa Electric CompanyBig Bend Station (Big Bend) power plant. The submission was received by EPA on April 25, 2019. EPA is proposing to determine that the Hillsborough County Area attained the 2010 1-hour SO2 NAAQS by its applicable attainment date of October 4, 2018; to approve the SIP revision containing the State's plan for maintaining attainment of the 2010 1-hour SO2 standard and to incorporate the maintenance plan into the SIP; to redesignate the Hillsborough County Area to attainment for the 2010 1-hour SO2 NAAQS; and to incorporate into the SIP certain permitting conditions applicable to Big Bend, including a condition that lowers the SO2 emissions cap and a condition that restricts fuel use at two electric generating units to natural gas.
Revisions to the California State Implementation Plan, Feather River Air Quality Management District; Correction
Document Number: 2019-16050
Type: Rule
Date: 2019-07-31
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) published a direct final rule in the Federal Register on July 8, 2015, that approved revisions to the Feather River Air Quality Management District portion of the California State Implementation Plan (SIP) but did not include all the necessary amendatory language to list all the SIP revisions that were being approved. This document corrects this error.
Significant New Use Rules on Certain Chemical Substances (19-1.F)
Document Number: 2019-13989
Type: Proposed Rule
Date: 2019-07-31
Agency: Environmental Protection Agency
EPA is proposing significant new use rules (SNURs) under the Toxic Substances Control Act (TSCA) for 31 chemical substances, 30 of which were the subject of premanufacture notices (PMNs) and 1 (a microorganism) that was the subject of a Microbial Commercial Activity Notice (MCAN). 17 of these chemical substances are subject to Orders issued by EPA pursuant to the TSCA. This action would require persons who intend to manufacture (defined by statute to include import) or process any of these 31 chemical substances for an activity that is proposed as a significant new use to notify EPA at least 90 days before commencing that activity. The required notification initiates EPA's evaluation of the use, under the conditions of use for that chemical substance, within the applicable review period. Persons may not commence manufacture or processing for the significant new use until EPA has conducted a review of the notice, made an appropriate determination on the notice, and has taken such actions as are required by that determination.