Environmental Protection Agency September 25, 2017 – Federal Register Recent Federal Regulation Documents

National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Vancouver Water Station #1 Superfund Site
Document Number: 2017-20449
Type: Proposed Rule
Date: 2017-09-25
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) Region 10 is issuing a Notice of Intent to Delete the Vancouver Water Station #1 Contamination Superfund Site (Site) located in Vancouver, Washington, from the National Priorities List (NPL) and requests public comments on this proposed action. The NPL, promulgated pursuant to section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Washington, through the Department of Ecology have determined that all appropriate response actions under CERCLA, have been completed. However, this deletion does not preclude future actions under Superfund.
National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Vancouver Water Station #4 Superfund Site
Document Number: 2017-20448
Type: Proposed Rule
Date: 2017-09-25
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) Region 10 is issuing a Notice of Intent to Delete the Vancouver Water Station #4 Contamination Superfund Site (Site) located in Vancouver, Washington, from the National Priorities List (NPL) and requests public comments on this proposed action. The NPL, promulgated pursuant to section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Washington, through the Department of Ecology have determined that all appropriate response actions under CERCLA, have been completed. However, this deletion does not preclude future actions under Superfund.
Ambient Air Monitoring Reference and Equivalent Methods: Designation of Three New Reference Methods
Document Number: 2017-20447
Type: Notice
Date: 2017-09-25
Agency: Environmental Protection Agency
Notice is hereby given that the Environmental Protection Agency (EPA) has designated three new reference methods for measuring concentrations of PM2.5, PM10, and PM10-2.5 in the ambient air.
Approval and Promulgation of Plans for Designated Facilities; New Jersey; Delegation of Authority
Document Number: 2017-20440
Type: Rule
Date: 2017-09-25
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is approving a request from the New Jersey Department of Environmental Protection (NJDEP) for delegation of authority to implement and enforce the Federal plan for Sewage Sludge Incineration (SSI) units. On April 29, 2016, the EPA promulgated the Federal plan for SSI units to fulfill the requirements of the Clean Air Act. The Federal plan addresses the implementation and enforcement of the emission guidelines applicable to existing SSI units located in areas not covered by an approved and currently effective state plan. The Federal plan imposes emission limits and other control requirements for existing affected SSI facilities which will reduce designated pollutants. On January 24, 2017, the NJDEP signed a Memorandum of Agreement which is intended to be the mechanism for the transfer of authority between the EPA and the NJDEP and defines the policies, responsibilities and procedures pursuant to the Federal plan for existing SSI units.
Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or Superfund, Section 128(a); Notice of Grant Funding Guidance for State and Tribal Response Programs for FY2018
Document Number: 2017-20436
Type: Notice
Date: 2017-09-25
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) will accept requests, from October 15, 2017 through December 15, 2017, for grants to establish and enhance State and Tribal Response Programs. This notice provides guidance on eligibility for funding, use of funding, grant mechanisms and process for awarding funding, the allocation system for distribution of funding, and terms and reporting under these grants. EPA has consulted with state and tribal officials in developing this guidance. The primary goal of this funding is to ensure that state and tribal response programs include, or are taking reasonable steps to include, certain elements of a response program and establishing a public record. Another goal is to provide funding for other activities that increase the number of response actions conducted or overseen by a state or tribal response program. This funding is not intended to supplant current state or tribal funding for their response programs. Instead, it is to supplement their funding to increase their response capacity. For fiscal year 2018, EPA will consider funding requests up to a maximum of $1.0 million per state or tribe. Subject to the availability of funds, EPA regional personnel will be available to provide technical assistance to states and tribes as they apply for and carry out these grants.
FIFRA Scientific Advisory Panel; Notice of Public Meeting for the Clarification of Charge Questions on PBPK
Document Number: 2017-20430
Type: Notice
Date: 2017-09-25
Agency: Environmental Protection Agency
There will be a three-hour meeting of the Federal Insecticide, Fungicide, and Rodenticide Act Scientific Advisory Panel (FIFRA SAP) to review and consider the scope and clarity of the draft charge questions for the October 24-27, 2017 SAP Meeting on physiologically-based pharmacokinetic (PBPK) modeling to address pharmacokinetic differences between and within species.
National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List: Deletion of the Nutting Truck & Caster Co. Superfund Site
Document Number: 2017-20348
Type: Rule
Date: 2017-09-25
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) Region 5 is publishing a direct final Notice of Deletion of the Nutting Truck & Caster Co. Superfund Site (Site), located in Faribault, Rice County, Minnesota from the National Priorities List (NPL). The NPL, promulgated pursuant to Section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). This direct final deletion is being published by EPA with the concurrence of the State of Minnesota, through the Minnesota Pollution Control Agency (MPCA), because EPA has determined that all appropriate response actions under CERCLA have been completed. However, this deletion does not preclude future actions under Superfund.
National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Nutting Truck & Caster Co. Superfund Site
Document Number: 2017-20346
Type: Proposed Rule
Date: 2017-09-25
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) Region 5 is issuing a Notice of Intent to Delete the Nutting Truck & Caster Co. Superfund Site (Site) located in Faribault, Minnesota, from the National Priorities List (NPL) and requests public comments on this proposed action. The NPL, promulgated pursuant to Section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Minnesota, through the Minnesota Pollution Control Agency, have determined that all appropriate response actions under CERCLA have been completed. However, this deletion does not preclude future actions under Superfund.
Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Removal of Clean Air Interstate Rule Trading Programs Replaced by Cross-State Air Pollution Rule Trading Programs
Document Number: 2017-20341
Type: Rule
Date: 2017-09-25
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking direct final action to approve two state implementation plan (SIP) revisions submitted by the State of West Virginia. These revisions pertain to two West Virginia regulations that established trading programs under the Clean Air Interstate Rule (CAIR). The EPA-administered trading programs under CAIR were discontinued on December 31, 2014 upon the implementation of the Cross-State Air Pollution Rule (CSAPR), which was promulgated by EPA to replace CAIR. CSAPR established federal implementation plans (FIPs) for 23 states, including West Virginia. The submitted SIP revisions request removal of regulations that implemented the CAIR annual nitrogen oxide (NOX) and annual sulfur dioxide (SO2) trading programs from the West Virginia SIP (as CSAPR has supplanted CAIR). West Virginia's SIP revision submittal requesting removal of a regulation that implemented the CAIR ozone season trading program will be addressed in a separate action. EPA is approving these SIP revisions in accordance with the requirements of the Clean Air Act (CAA).
Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Removal of Clean Air Interstate Rule Trading Programs Replaced by Cross-State Air Pollution Rule Trading Programs
Document Number: 2017-20339
Type: Proposed Rule
Date: 2017-09-25
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) proposes to approve two state implementation plan (SIP) revisions submitted by the State of West Virginia. These submittals seek to remove from the West Virginia SIP two West Virginia regulations that established trading programs under the Clean Air Interstate Rule (CAIR). The EPA-administered trading programs under CAIR were discontinued on December 31, 2014 upon the implementation of the Cross-State Air Pollution Rule (CSAPR), which was promulgated by EPA to replace CAIR. CSAPR established federal implementation plans (FIPs) for 23 states, including West Virginia. The submitted SIP revisions request removal of two regulations that implemented the CAIR annual NOX and annual sulfur dioxide (SO2) trading programs from the West Virginia SIP. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittals as a direct final rule without prior proposal because the Agency views these as noncontroversial submittals and anticipates no adverse comments. A detailed rationale for the approval is set forth in the direct final rule. If no adverse comments are received in response to this action, no further activity is contemplated. If EPA receives adverse comments, the direct final rule will be withdrawn and all public comments received will be addressed in a subsequent final rule based on this proposed rule. EPA will not institute a second comment period. Any parties interested in commenting on this action should do so at this time.
Air Plan Approval; GA: Emission Reduction Credits
Document Number: 2017-20337
Type: Proposed Rule
Date: 2017-09-25
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve changes to the Georgia State Implementation Plan (SIP) to update the emission reduction credits regulation. EPA is proposing to approve portions of the SIP revision submitted by the State of Georgia, through the Georgia Department of Natural Resources' Environmental Protection Division on September 15, 2008. This action is being taken pursuant to the Clean Air Act.
Air Plan Approval; GA: Emission Reduction Credits
Document Number: 2017-20336
Type: Rule
Date: 2017-09-25
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking direct final action to approve changes to the Georgia State Implementation Plan (SIP) to revise the Emission Reduction Credits (ERC) regulation. EPA is approving portions of the SIP revision submitted by the State of Georgia, through the Georgia Department of Natural Resources' Environmental Protection Division (GA EPD) on September 15, 2008. The revision expands the eligibility for sources in Barrow County that can participate in the ERC Program, adds a provision for reevaluation of the Certificates of ERC, changes the administrative fees, and eliminates an exemption for certain types of ERCs. This action is being taken pursuant to the Clean Air Act (CAA or Act).
Approval and Promulgation of Air Quality Implementation Plans; Maryland; 2011 Base Year Inventory for the 2008 8-Hour Ozone National Ambient Air Quality Standard for the Maryland Portion of the Philadelphia-Wilmington-Atlantic City Nonattainment Area
Document Number: 2017-20324
Type: Rule
Date: 2017-09-25
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking direct final action to approve the 2011 base year inventory for the Maryland portion of the Philadelphia-Wilmington-Atlantic City marginal nonattainment area for the 2008 8-hour ozone national ambient air quality standard (NAAQS). The State of Maryland submitted the emission inventory, which included the ozone precursors, nitrogen oxides (NOX) and volatile organic compounds (VOC), as well as several other pollutants, through the Maryland Department of the Environment (MDE) to meet the nonattainment requirements for marginal ozone nonattainment areas for the 2008 8-hour ozone NAAQS. EPA is approving the 2011 base year emissions inventory for the 2008 8-hour ozone NAAQS as a revision to the Maryland State Implementation Plan (SIP) as the inventory for NOX and VOC is in accordance with the requirements of the Clean Air Act (CAA).
Approval and Promulgation of Air Quality Implementation Plans; Maryland; 2011 Base Year Inventory for the 2008 8-Hour Ozone National Ambient Air Quality Standard for the Maryland Portion of the Philadelphia-Wilmington-Atlantic City Nonattainment Area
Document Number: 2017-20323
Type: Proposed Rule
Date: 2017-09-25
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) proposes to approve, as a state implementation plan (SIP) revision, the 2011 base year inventory for the 2008 8-hour ozone national ambient air quality standard (NAAQS) for the Maryland portion of the Philadelphia- Wilmington-Atlantic City marginal nonattainment area submitted by the State of Maryland through the Maryland Department of the Environment (MDE). In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final rule without prior proposal because the Agency views this as a noncontroversial submittal and anticipates no adverse comments. A more detailed description of the state submittal and EPA's evaluation is included in a technical support document (TSD) prepared in support of this rulemaking action. A copy of the TSD is available, upon request, from the EPA Regional Office listed in the ADDRESSES section of this document or is also available electronically within the Docket for this rulemaking action. If no adverse comments are received in response to this action, no further activity is contemplated. If EPA receives adverse comments, the direct final rule will be withdrawn and all public comments received will be addressed in a subsequent final rule based on this proposed rule. EPA will not institute a second comment period. Any parties interested in commenting on this action should do so at this time.
Washington: Proposed Authorization of State Hazardous Waste Management Program Revisions
Document Number: 2017-20314
Type: Proposed Rule
Date: 2017-09-25
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is reopening the comment period for a proposed rulemaking to authorize a revision to the State of Washington's federally authorized hazardous waste management program pursuant to the Resource Conservation and Recovery Act (RCRA), as amended. The EPA has reviewed Washington's application, and we have determined that these changes satisfy all requirements needed to qualify for final authorization and are proposing to authorize the State's changes. EPA is reopening the public comment period until October 25, 2017.
Notice of Administrative Settlement Agreement Pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act
Document Number: 2017-20313
Type: Notice
Date: 2017-09-25
Agency: Environmental Protection Agency
In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (``CERCLA''), notice is hereby given that a proposed administrative settlement agreement for recovery of response costs (``Proposed Agreement'') associated with the New Jersey Fireworks Superfund Site, Elkton, Cecil County, Maryland was executed by the Environmental Protection Agency (``EPA'') and is now subject to public comment, after which EPA may modify or withdraw its consent if comments received disclose facts or considerations that indicate that the Proposed Agreement is inappropriate, improper, or inadequate. The Proposed Agreement would resolve potential EPA claims against the Estate of Louis Casale (``Settling Party''). The Proposed Agreement would require Settling Party to reimburse EPA $50,000 for response costs incurred by EPA for the Site. For thirty (30) days following the date of publication of this notice, EPA will receive written comments relating to the Proposed Agreement. EPA's response to any comments received will be available for public inspection at the U.S. Environmental Protection Agency, Region III, 1650 Arch Street, Philadelphia, PA 19103.
Compliance Date Extension; Formaldehyde Emission Standards for Composite Wood Products
Document Number: 2017-19455
Type: Rule
Date: 2017-09-25
Agency: Environmental Protection Agency
EPA is extending the compliance dates for the formaldehyde emission standards for composite wood products final rule issued pursuant to the Toxic Substances Control Act (TSCA) Title VI, and published in the Federal Register on December 12, 2016. EPA is extending the December 12, 2017, manufactured-by date for emission standards, recordkeeping, and labeling provisions until December 12, 2018; extending the December 12, 2018 compliance date for import certification provisions until March 22, 2019; and extending the December 12, 2023, compliance date for provisions applicable to producers of laminated products until March 22, 2024. Additionally, this final rule will extend the transitional period during which the California Air Resources Board (CARB) Third Party Certifiers (TPC) may certify composite wood products under TSCA Title VI without an accreditation issued by an EPA TSCA Title VI Accreditation Body, so long as the TPC remains approved by CARB, is recognized by EPA, and complies with all aspects of the December 12, 2016 final rule until March 22, 2019. EPA believes that extension of these compliance dates and the transitional period for CARB TPCs adds needed regulatory flexibility for regulated entities, reduces compliance burdens, and helps to prevent disruptions to supply chains while still ensuring that compliant composite wood products enter the supply chain in a timely manner.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.