Environmental Protection Agency November 21, 2016 – Federal Register Recent Federal Regulation Documents

Endothall; Pesticide Tolerances
Document Number: 2016-27984
Type: Rule
Date: 2016-11-21
Agency: Environmental Protection Agency
This regulation establishes tolerances for residues of endothall in or on multiple commodities which are identified and discussed later in this document. United Phosphorus, Inc. requested these tolerances under the Federal Food, Drug, and Cosmetic Act (FFDCA).
Proposed Consent Decree, Clean Air Act Citizen Suit
Document Number: 2016-27983
Type: Notice
Date: 2016-11-21
Agency: Environmental Protection Agency
In accordance with section 113(g) of the Clean Air Act, as amended (``CAA'' or the ``Act''), notice is hereby given of a proposed consent decree to address a lawsuit filed by Donald van der Vaart, in his official capacity as Secretary of North Carolina Department of Environmental Quality (``NCDEQ''), and by NCDEQ (collectively ``Plaintiffs'') in the United States District Court for the Eastern District of North Carolina: Donald van der Vaart, et al. v. McCarthy, et al., No. 4:16-cv-01946-SBA (E.D. N.C.). On June 24, 2016, Plaintiffs filed an amended complaint alleging that Gina McCarthy, in her official capacity as Administrator of the United States Environmental Protection Agency (``EPA'') failed to perform duties mandated by CAA to take final action to approve or disapprove the December 9, 2013 Petition submitted by several states within the Ozone Transport Region (``OTR'') requesting EPA to expand the OTR to include North Carolina, among other states. The proposed consent decree would establish deadlines for EPA to take certain specified actions with respect to the December 9, 2013 Petition related to North Carolina.
Notice of Receipt of Requests to Voluntarily Cancel Certain Pesticide Registrations
Document Number: 2016-27982
Type: Notice
Date: 2016-11-21
Agency: Environmental Protection Agency
In accordance with the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA), EPA is issuing a notice of receipt of requests by registrants to voluntarily cancel certain pesticide registrations. EPA intends to grant these requests at the close of the comment period for this announcement unless the Agency receives substantive comments within the comment period that would merit its further review of the requests, or unless the registrants withdraw its requests. If these requests are granted, any sale, distribution, or use of products listed in this notice will be permitted after the registrations have been cancelled only if such sale, distribution, or use is consistent with the terms as described in the final order.
Crowders Mountain Site, Kings Mountain, Gaston County, North Carolina; Notice of Settlement
Document Number: 2016-27979
Type: Notice
Date: 2016-11-21
Agency: Environmental Protection Agency
Under 122(h) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), the United States Environmental Protection Agency has entered into a settlement with North Carolina Department of Natural and Cultural Resources, concerning the Crowders Mountain Superfund Site located in Kings Mountain, Gaston County, North Carolina. The settlement addresses recovery of CERCLA costs for a cleanup action performed by the EPA at the Site.
Section 9 Lease Site, Coconino County, AZ; Notice of Proposed CERCLA Settlement Agreement for Recovery of Past Response Costs
Document Number: 2016-27978
Type: Notice
Date: 2016-11-21
Agency: Environmental Protection Agency
In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation and Liability Act of 1980, as amended (CERCLA), 42 U.S.C. 9622(i), notice is hereby given of a proposed administrative settlement with two parties for recovery of response costs concerning the Section 9 Lease Site in Coconino County, Arizona. The settlement is entered into pursuant to Section 122(h)(1) of CERCLA, 42 U.S.C. 9622(h)(1), and it requires the settling parties to pay $230,000 to the United States Environmental Protection Agency (EPA). The settlement includes a covenant not to sue the settling parties for certain costs pursuant to Sections 106 or 107(a) of CERCLA, 42 U.S.C. 9606 or 9607(a). For thirty (30) days following the date of publication of this Notice in the Federal Register, the Agency will receive written comments relating to the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate the proposed settlement is inappropriate, improper, or inadequate. The Agency's response to any comments received will be available for public inspection at 75 Hawthorne Street, San Francisco, CA 94105.
Approval and Promulgation of Air Quality Implementation Plans; Oklahoma; Infrastructure and Interstate Transport for the 2012 Fine Particulate Matter and Interstate Transport for the 2010 Sulfur Dioxide National Ambient Air Quality Standards
Document Number: 2016-27924
Type: Proposed Rule
Date: 2016-11-21
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve and disapprove elements of State Implementation Plan (SIP) submissions from the State of Oklahoma for the 2012 Fine Particulate Matter (PM2.5) National Ambient Air Quality Standard (NAAQS or standard) and the 2010 Sulfur Dioxide (SO2) NAAQS. The 2012 PM2.5 submission addresses how the existing SIP provides for implementation, maintenance, and enforcement of this NAAQS (infrastructure SIP or i-SIP). The i-SIP ensures that the Oklahoma SIP is adequate to meet the State's responsibilities under the Federal Clean Air Act (CAA). The majority of the 2010 SO2 submission was addressed in a separate rulemaking, only the visibility component listed in 110(a)(2)(D)(i)(II) is being addressed in this action. We are proposing to disapprove the visibility component of 110(a)(2)(D)(i)(II), often referred to as prong 4. We are also proposing to disapprove the portion of the January 28, 2015 SIP submission from Oklahoma for the 2010 Sulfur Dioxide (SO2) NAAQS only as it addresses Section 110(a)(2)(D)(i)(II) for visibility protection.
Air Plan Approval/Disapproval; AL Infrastructure Requirements for the 2010 1-Hour NO2
Document Number: 2016-27862
Type: Rule
Date: 2016-11-21
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking final action to approve in part, and disapprove in part, portions of the April 23, 2013, and December 9, 2015, of the State Implementation Plan (SIP) submissions, submitted by the State of Alabama, through the Alabama Department of Environmental Management (ADEM), to demonstrate that the State meets certain infrastructure requirements of the Clean Air Act (CAA or Act) for the 2010 1-hour nitrogen dioxide (NO2) national ambient air quality standards (NAAQS). The CAA requires that each state adopt and submit a SIP for the implementation, maintenance and enforcement of each NAAQS promulgated by EPA, which is commonly referred to as an ``infrastructure'' SIP. ADEM certified that the Alabama SIP contains provisions that ensure the 2010 1-hour NO2 NAAQS is implemented, enforced, and maintained in Alabama. With the exception of the provisions pertaining to prevention of significant deterioration (PSD) permitting, and visibility in other states, for which EPA is proposing no action through this notice, and the provisions respecting state boards, for which EPA is finalizing disapproval, EPA has determined portions of Alabama's infrastructure SIP submissions, provided to EPA on April 23, 2013, and updated on December 9, 2015, satisfy certain required infrastructure elements for the 2010 1-hour NO2 NAAQS.
Air Quality Plan; Georgia; Infrastructure Requirements for the 2012 PM2.5
Document Number: 2016-27857
Type: Rule
Date: 2016-11-21
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking final action to approve a portion of the State Implementation Plan (SIP) submission, submitted by the State of Georgia, through the Georgia Department of Natural Resources, Environmental Protection Division, on December 14, 2015, to demonstrate that the State meets the infrastructure requirements of the Clean Air Act (CAA or Act) for the 2012 annual fine particulate matter (PM2.5) national ambient air quality standard (NAAQS). The CAA requires that each state adopt and submit a SIP for the implementation, maintenance and enforcement of each NAAQS promulgated by EPA, which is commonly referred to as an ``infrastructure SIP submission.'' Georgia certified that its SIP contains provisions that ensure the 2012 Annual PM2.5 NAAQS is implemented, enforced, and maintained in Georgia. EPA is approving portions of Georgia's infrastructure SIP submission, provided to EPA on December 14, 2015, as satisfying certain required infrastructure elements for the 2012 Annual PM2.5 NAAQS.
Revisions to the California State Implementation Plan; South Coast Air Quality Management District; Control of Oxides of Nitrogen Emissions From Off-Road Diesel Vehicles
Document Number: 2016-27853
Type: Rule
Date: 2016-11-21
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking final action to approve South Coast Air Quality Management District (SCAQMD or ``the District'') Rule 2449, Control of Oxides of Nitrogen Emissions from Off-Road Diesel Vehicles, as a revision to the SCAQMD portion of the California State Implementation Plan (SIP). SCAQMD Rule 2449 adopts by reference title 13, chapter 9, section 2449.2 of the California Code of Regulations, ``Surplus Off-Road Opt-In for NOX (SOON) Program.'' SCAQMD Rule 2449 requires certain in-use off-road vehicle fleets to meet more stringent requirements in the South Coast area when funding is provided by the District in order to achieve additional reductions of oxides of nitrogen (NOX).
Designation of Areas for Air Quality Planning Purposes; Ohio; Redesignation of the Ohio Portion of the Campbell-Clermont KY-OH Sulfur Dioxide Nonattainment Area
Document Number: 2016-27852
Type: Rule
Date: 2016-11-21
Agency: Environmental Protection Agency
In accordance with the Clean Air Act (CAA), the Environmental Protection Agency (EPA) is redesignating the Ohio portion of the Campbell-Clermont KY-OH sulfur dioxide (SO2) nonattainment area from nonattainment to attainment. The Ohio portion of this area consists of Pierce Township in Clermont County, Ohio. EPA is also approving Ohio's maintenance plan, submitted on August 11, 2015. The primary emission source in the area has permanently closed, and the air quality in the area is now meeting the SO2 standard. EPA received one comment in support of the redesignation.
Revisions to Procedure 2-Quality Assurance Requirements for Particulate Matter Continuous Emission Monitoring Systems at Stationary Sources
Document Number: 2016-27849
Type: Rule
Date: 2016-11-21
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking direct final action to update a procedure in the New Source Performance Standards (NSPS). The procedure provides the ongoing quality assurance/ quality control (QA/QC) procedures for assessing the acceptability of particulate matter (PM) continuous emissions monitoring systems (CEMS). The procedure explains the criteria for passing an annual response correlation audit (RCA) and the criteria for passing an annual relative response audit (RRA). The procedure currently contains a requirement that the annual QA/QC test results for affected facilities must fall within the same response range that was used to develop the existing PM CEMS correlation curve. As a result, some facilities are unable to meet the criteria for passing their annual QA/QC test because their emissions are now lower than the range previously set during their correlation testing. We are modifying the procedure to allow facilities to extend their PM CEMS correlation regression line to the lowest PM CEMS response obtained during the annual RCA or RRA, when these PM CEMS responses are less than the lowest response used to develop the existing correlation curve. This change will ensure that facilities that have reduced their emissions since completing their correlation testing will no longer be penalized because their lower emissions fall outside their initial response range. This action also corrects a typographical error in the procedure.
Revisions to Procedure 2-Quality Assurance Requirements for Particulate Matter Continuous Emission Monitoring Systems at Stationary Sources
Document Number: 2016-27847
Type: Proposed Rule
Date: 2016-11-21
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing revisions to a procedure in the New Source Performance Standards (NSPS). The procedure provides the ongoing quality assurance/quality control (QA/QC) procedures for assessing the acceptability of particulate matter (PM) continuous emissions monitoring systems (CEMS). The procedure explains the criteria for passing an annual response correlation audit (RCA) and the criteria for passing an annual relative response audit (RRA). The procedure currently contains a requirement that the annual QA/QC test results for affected facilities must fall within the same response range as was used to develop the existing PM CEMS correlation curve. As a result, some facilities are unable to meet the criteria for passing their annual QA/QC test simply because their emissions are now lower than the range previously set during correlation testing. We are proposing to modify the procedure to allow facilities to extend their PM CEMS correlation regression line to the lowest PM CEMS response obtained during the RCA or RRA, when these PM CEMS responses are less than the lowest response used to develop the existing correlation curve. We also propose to correct a typographical error in the procedure.
Air Plan Approval; KY Infrastructure Requirements for the 2010 1-Hour NO2
Document Number: 2016-27538
Type: Rule
Date: 2016-11-21
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking final action to approve portions of the State Implementation Plan (SIP) submission, submitted by the Commonwealth of Kentucky, Energy and Environment Cabinet, Department for Environmental Protection, through the Kentucky Division for Air Quality (KDAQ), on April 26, 2013, to demonstrate that the Commonwealth meets the infrastructure requirements of the Clean Air Act (CAA or Act) for the 2010 1-hour nitrogen dioxide (NO2) national ambient air quality standard (NAAQS). The CAA requires that each state adopt and submit a SIP for the implementation, maintenance and enforcement of each NAAQS promulgated by EPA, which is commonly referred to as an ``infrastructure'' SIP. KDAQ certified that Kentucky's SIP contains provisions that ensure the 2010 1-hour NO2 NAAQS is implemented, enforced, and maintained in Kentucky. EPA has determined that portions of Kentucky's infrastructure submission, submitted on April 26, 2013, addresses certain required infrastructure elements for the 2010 1-hour NO2 NAAQS.
Promulgation of Air Quality Implementation Plans; Arizona; Regional Haze Federal Implementation Plan; Reconsideration
Document Number: 2016-27422
Type: Rule
Date: 2016-11-21
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is revising portions of the Arizona Regional Haze Federal Implementation Plan (2014 FIP) applicable to the Phoenix Cement Company (PCC) Clarkdale Plant and the CalPortland Cement (CPC) Rillito Plant. This 2014 FIP was adopted earlier under the provisions of the Clean Air Act (CAA). We are finalizing without change our proposal to replace the control technology demonstration requirements for nitrogen oxides (NOX) applicable to Kiln 4 at the Clarkdale Plant and Kiln 4 at the Rillito Plant with a series of revised recordkeeping and reporting requirements. When EPA finalized the 2014 FIP, we had limited operating data for the use of Selective Non-Catalytic Reduction (SNCR) on cement plants. Therefore, we required that PCC and CPC perform control technology demonstration projects to support the control efficiencies for SNCR in the 2014 FIP, as well as to determine if more stringent control efficiencies were achievable. In early 2015, a control technology demonstration project was performed on the SNCR installed at another CalPortland Cement facility, the Mojave Plant. Our analysis of the SNCR control efficiency data from that project indicated that more stringent SNCR control efficiencies were not achievable at PCC and CPC. As a result, the additional information from the control technology demonstration projects required by the 2014 FIP is no longer needed because the PCC and CPC SNCR control efficiencies in the 2014 FIP are consistent with the SNCR performance at the Mojave Plant. In addition, the EPA is making a minor technical correction to change an equation to match the language in the regulatory text.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.