Environmental Protection Agency July 2012 – Federal Register Recent Federal Regulation Documents
Results 1 - 50 of 144
Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Prevention of Significant Deterioration
EPA is proposing to approve revisions to the West Virginia State Implementation Plan (SIP), submitted by the West Virginia Department of Environmental Protection (WVDEP) on August 31, 2011. These revisions pertaining to West Virginia's Prevention of Significant Deterioration (PSD) program incorporate preconstruction permitting regulations for fine particulate matter (PM2.5) and Greenhouse Gases (GHGs) into the West Virginia SIP. In addition, EPA is proposing to approve these revisions and portions of other related submissions for the purpose of determining that West Virginia has met its statutory obligations with respect to the infrastructure requirements of the Clean Air Act (CAA) which relate to West Virginia's PSD permitting program and are necessary to implement, maintain, and enforce the 1997 PM2.5 and ozone National Ambient Air Quality Standards (NAAQS), the 2006 PM2.5 NAAQS, and the 2008 lead and ozone NAAQS. EPA is proposing to approve these revisions in accordance with the requirements of the CAA.
Approval and Promulgation of Air Quality Implementation Plans; Virginia; The 2002 Base Year Inventory
EPA is proposing to approve the fine particulate matter (PM2.5) 2002 base year emissions inventory portion of the Virginia State Implementation Plan (SIP) revision submitted by the Commonwealth of Virginia, through the Virginia Department of Environmental Quality (VDEQ), on April 4, 2008. The emissions inventory is part of the Virginia April 4, 2008 SIP revision that was submitted to meet nonattainment requirements related to Virginia's portion of the Washington DC-MD-VA nonattainment area (hereafter referred to as Virginia Area or Area) for the 1997 PM2.5 National Ambient Air Quality Standard (NAAQS) SIP. EPA is proposing to approve the 2002 base year PM2.5 emissions inventory in accordance with the requirements of the Clean Air Act (CAA).
Approval and Promulgation of Implementation Plans; Mississippi; 110(a)(2)(G) Infrastructure Requirement for the 1997 and 2006 Fine Particulate Matter National Ambient Air Quality Standards
EPA is proposing to approve, through parallel processing, a draft revision to the Mississippi State Implementation Plan (SIP), submitted by the Mississippi Department of Environmental Quality (MDEQ), on July 13, 2012. The draft revisions pertain to Clean Air Act (CAA) section 110(a)(2)(G) for the 1997 annual and 2006 24-hour fine particulate matter (PM2.5) National Ambient Air Quality Standards (NAAQS). Specifically, EPA is proposing to approve Mississippi's December 7, 2007, October 6, 2009, and July 13, 2012, submissions addressing section 110(a)(2)(G), of the CAA for both the 1997 and 2006 PM2.5 NAAQS. Section 110(a) of the CAA requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each NAAQS promulgated by EPA, which is commonly referred to as an ``infrastructure'' SIP. MDEQ certified that the Mississippi SIP contains provisions that ensure the 1997 and 2006 PM2.5 NAAQS are implemented, enforced, and maintained in Mississippi (hereafter referred to as ``infrastructure submission''). The subject of this notice is limited to infrastructure element 110(a)(2)(G). All other applicable Mississippi infrastructure elements are being addressed in a separate rulemaking.
Approval and Promulgation of Air Quality Implementation Plans: Georgia; Control Techniques Guidelines and Reasonably Available Control Technology
EPA is proposing to approve three final and one draft State Implementation Plan (SIP) revisions submitted by the State of Georgia, through the Georgia Environmental Protection Division (GA EPD), to EPA on November 13, 1992, October 21, 2009, March 19, 2012, and July 19, 2012 (draft SIP revision). With regard only to the July 19, 2012, SIP submission, EPA is also proposing, in the alternative, to conditionally approve that revision which relates to certain control techniques guidelines (CTG) categories. Together, these four revisions establish reasonably available control technology (RACT) requirements for the major sources located in the Atlanta, Georgia 1997 8-hour ozone nonattainment area (hereafter referred to as the ``Atlanta Area'') that either emit volatile organic compounds (VOC), nitrogen oxides (NOx), or both. Georgia's SIP revisions include certain VOC source categories for which EPA has issued CTG. EPA has evaluated the proposed revisions to Georgia's SIP, and has made the preliminary determination that they are consistent with statutory and regulatory requirements and EPA guidance.
Notice of Availability of Microbial Risk Assessment Guideline: Pathogenic Microorganisms With Focus on Food and Water
The U.S. Environmental Protection Agency (EPA) and the Food Safety and Inspection Service (FSIS) of the U.S. Department of Agriculture are announcing the availability of the Microbial Risk Assessment Guideline: Pathogenic Microorganisms with Focus on Food and Water (MRA Guideline). The MRA Guideline will improve transparency in the way that the two federal agencies conduct microbial risk assessment and also promote consistency in approaches and methods. The MRA Guideline can be applied to similar scenarios involving microbial contamination, and it will serve a resource for federal government risk assessors, their agents, contractors, and for other members of the risk assessment community. When appropriate, the EPA intends to use the guidance prospectively when conducting risk assessments.
Approval, Disapproval and Promulgation of Air Quality Implementation Plans; Arizona; Regional Haze State and Federal Implementation Plans
EPA is holding two additional public hearings in Arizona on August 14 and 15, 2012, for the proposed rule, ``Approval, Disapproval and Promulgation of Air Quality Implementation Plans; Arizona; Regional Haze State and Federal Implementation Plans'', published in the Federal Register on July 20, 2012 (77 FR 42833). The two hearings will provide opportunities for public comment in addition to the public hearing already scheduled for July 31, 2012, in Phoenix, Arizona. EPA also is extending the public comment period to September 18, 2012, to provide 60 days of comment after the publication of the proposed rule.
Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality Planning Purposes; Wisconsin; Redesignation of the Milwaukee-Racine Area to Attainment for 1997 8-Hour Ozone Standard
EPA is approving a request from the Wisconsin Department of Natural Resources (WDNR) to redesignate the Milwaukee-Racine area to attainment for the 1997 8-hour National Ambient Air Quality Standard (NAAQS or standard). The Milwaukee-Racine area includes Milwaukee, Ozaukee, Racine, Washington, Waukesha, and Kenosha Counties. WDNR submitted this request on September 11, 2009, and supplemented the submittal on November 16, 2011. These submittals also requested the redesignation of the Sheboygan area (Sheboygan County) to attainment for the 1997 8-hour ozone NAAQS. EPA proposed to approve the redesignation of both areas on February 9, 2012, and provided a 30-day review and comment period. EPA received comments submitted on behalf of Sierra Club and Midwest Environmental Defense Center and from the Wisconsin Manufacturers and Commerce. EPA is not taking final action on the Sheboygan redesignation request at this time because preliminary 2012 ozone monitoring data indicate that the area has violated the 1997 standard. In addition to approving the redesignation of the Milwaukee- Racine area, EPA is taking several other related actions. EPA is approving, as a revision to the Wisconsin State Implementation Plan (SIP), the State's plan for maintaining the 1997 8-hour ozone standard through 2022 in the Milwaukee-Racine area. EPA is approving the 2005 emissions inventories for the Milwaukee-Racine and Sheboygan areas as meeting the comprehensive emissions inventory requirement of the Clean Air Act (CAA or Act). Finally, EPA finds adequate and is approving the State's 2015 and 2022 Motor Vehicle Emission Budgets (MVEBs) for the Milwaukee-Racine area.
Partial Approval and Disapproval of Air Quality Implementation Plans; Arizona; State Board Requirements for Ozone and Fine Particulate Matter
EPA is proposing to partially approve and partially disapprove a State Implementation Plan (SIP) revision submitted by the State of Arizona to address the requirements of section 110(a)(2)(E)(ii) of the Clean Air Act (CAA) for the 1997 8-hour ozone national ambient air quality standards (NAAQS) and the 1997 and 2006 NAAQS for fine particulate matter (PM2.5). EPA is proposing to approve the state's provisions regarding disclosure of potential conflicts of interest under 128(a)(2), but is proposing to disapprove, on narrow grounds, their 128(a)(1) provisions regarding board composition because these provisions do not apply to enforcement orders. We encourage the State to submit a revised SIP to address this very narrow deficiency, and we stand ready to work with the State to develop a revised plan. We are taking comments on this proposal and plan to follow with a final action.
Approval of Air Quality Implementation Plans; Arizona; Interstate Transport of Fine Particulate Matter
EPA is proposing to approve a State Implementation Plan (SIP) revision submitted by the State of Arizona on October 14, 2009 and to determine that the existing SIP is adequate to address the requirements of section 110(a)(2)(D)(i)(I) of the Clean Air Act (CAA) for the 2006 National Ambient Air Quality Standard (NAAQS or standard) for fine particulate matter (PM2.5). Section 110(a)(2)(D)(i)(I) of the CAA requires that each SIP contain adequate provisions to prohibit air emissions from adversely affecting air quality in other states through interstate transport. EPA is proposing to approve the SIP revision submitted by Arizona and to conclude that additional control measures in Arizona are not necessary under CAA section 110(a)(2)(D)(i)(I) because emissions from Arizona sources do not contribute significantly to nonattainment or interfere with maintenance of the 2006 24-hour PM2.5 NAAQS in any other state. We are taking comments on this proposal and plan to follow with a final action.
Public Meeting: Potential Regulatory Implications of the Reduction of Lead in Drinking Water Act of 2011
The U.S. Environmental Protection Agency (EPA) is hosting a public meeting on August 16, 2012, to discuss and solicit input from States, manufacturers, drinking water systems, other interested groups and consumers on the implementation of the Reduction of Lead in Drinking Water Act of 2011 (``the Act''). The Act was signed on January 4, 2011, and will be effective on January 4, 2014. The Act amended Section 1417 of the Safe Drinking Water Act (SDWA), which prohibits the use of certain plumbing products that are not ``lead free'' (as defined by SDWA), and makes it unlawful to introduce into commerce products that are not ``lead free.''
Method 16C for the Determination of Total Reduced Sulfur Emissions From Stationary Sources
This action promulgates Method 16C for measuring total reduced sulfur (TRS) emissions from stationary sources. Method 16C offers the advantages of real-time data collection and uses procedures that are already in use for measuring other pollutants. Method 16C will be a testing option that is used at the discretion of the tester.
Revisions to the Nevada State Implementation Plan, Washoe County Air Quality District
EPA is proposing to approve revisions to the Washoe County District Board of Health (WCDBOH) portion of the Nevada State Implementation Plan (SIP) that EPA expects to be submitted by the Nevada Division of Environmental Protection (NVDEP). These revisions concern regulations regarding compliance with permit conditions, recordkeeping, source sampling and testing, and statements of compliance with 40 CFR part 70 permits. These regulations generally regulate emissions of criteria pollutants such as volatile organic compounds (VOC), oxides of nitrogen (NOX), and particulate matter (PM). This proposed approval is based upon proposed regulations submitted by NVDEP and an accompanying request that EPA proceed with SIP review while the State and local agencies complete their public review and agency adoption processes. EPA will not take final action on these regulations until NVDEP submits the final adopted versions to EPA as a revision to the Nevada SIP. Final EPA approval of the regulations and incorporation of them into the Nevada SIP would make them federally enforceable under the Clean Air Act (CAA). We are taking comments on this proposal and plan to follow with a final action.
Notice of Availability of the External Review Draft of Framework for Human Health Risk Assessment To Inform Decision Making
The U.S. Environmental Protection Agency (EPA) Office of the Science Advisor (OSA) announces a 60-day public comment period for the external review draft of ``A Framework for Human Health Risk Assessment to Inform Decision Making.'' This document was developed as part of an agencywide program by the EPA Risk Assessment Forum. The EPA is releasing this draft document solely for the purpose of seeking public comment prior to external peer review. The document will undergo independent peer review during an expert peer review meeting that will be convened, organized, and conducted by a contractor of the EPA in 2012. The date of the external peer review meeting will be announced in a subsequent Federal Register notice. All comments received by the docket closing date September 28, 2012, will be shared with the external peer review panel for their consideration. Comments received after the close of the comment period may be considered by the agency when it finalizes the document. This document has not been formally disseminated by the EPA. This draft document does not represent and should not be construed to represent the EPA policy, viewpoint, or determination. Members of the public may obtain the external review draft from www.regulations.gov; or www.epa.gov/raf/FrameworkHHRA.htm or from Julie Fitzpatrick via the contact information below. This draft document describes a framework for conducting human health risk assessments that are responsive to the needs of decision making processes at the EPA. The document was developed by the EPA, to provide guidance to scientists and decision makers in the EPA.
Approval and Promulgation of Implementation Plans; Tennessee: Prevention of Significant Deterioration and Nonattainment New Source Review; Fine Particulate Matter (PM2.5
EPA is taking final action to approve changes to the Tennessee State Implementation Plan (SIP), submitted by the Tennessee Department of Environment and Conservation (TDEC) through the Division of Air Pollution Control to EPA on July 29, 2011. The July 29, 2011, SIP revision modifies Tennessee's New Source Review (NSR) Prevention of Significant Deterioration (PSD) and Nonattainment New Source Review (NNSR) programs. Tennessee's July 29, 2011, SIP revision proposes to incorporate, into the Tennessee SIP, NSR provisions for PM2.5 as amended in EPA's 2008 NSR PM2.5 Implementation Rule. Also, Tennessee's July 29, 2011, SIP revision makes a corrective and clarifying administrative change to rule 1200- 03-09-.01. EPA is approving Tennessee's July 29, 2011, SIP revision because it is consistent with the Clean Air Act (CAA or Act) and EPA regulations regarding NSR permitting.
Approval and Promulgation of Air Quality Implementation Plans; Utah; Determination of Clean Data for the 1987 PM10
EPA is proposing to determine that the Ogden City nonattainment area in Utah is currently attaining the National Ambient Air Quality Standard (NAAQS) for particulate matter with an aerodynamic diameter of less than or equal to a nominal ten micrometers (PM10) based on certified, quality-assured ambient air monitoring data for the years 2009 through 2011. The State of Utah submitted a letter dated March 30, 2000, requesting EPA to make a clean data determination for the nonattainment area of Ogden City. Based on our proposed determination that the Ogden City nonattainment area is currently attaining the PM10 NAAQS, EPA is also proposing to determine that Utah's obligation to make submissions to meet certain Clean Air Act (CAA) requirements related to attainment of the NAAQS is not applicable for as long as the Ogden City nonattainment area continues to attain the NAAQS. This action is being taken under the CAA.
National Pollutant Discharge Elimination System Permit Regulation for Concentrated Animal Feeding Operations: Removal of Vacated Elements in Response to 2011 Court Decision
The EPA is amending its regulations to eliminate the requirement that an owner or operator of a Concentrated Animal Feeding Operation (CAFO) that ``proposes to discharge'' must apply for a National Pollutant Discharge Elimination System (NPDES) Permit. This rulemaking also removes the voluntary certification option for unpermitted CAFOs because removal of the ``propose to discharge'' requirement renders the certification option unnecessary. Its purpose had been to allow CAFO owners and operators to certify that they were not violating the requirement that owners or operators of CAFOs that propose to discharge must seek permit coverage. Both of these provisions were included in the EPA's rulemaking entitled ``Revised National Pollutant Discharge Elimination System Permit Regulation and Effluent Limitations Guidelines for Concentrated Animal Feeding Operations in Response to the Waterkeeper Decision,'' (the 2008 CAFO Rule).
Approval and Promulgation of Implementation Plans; Florida; Sections 128 and 110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards
EPA is taking final action to approve in part, and disapprove in part, the State Implementation Plan (SIP) submissions, submitted by the State of Florida, through the Florida Department of Environmental Protection (FDEP) on December 13, 2007, and supplemented on April 18, 2008 and May 24, 2012, to demonstrate that the State meets the requirements of sections 110(a)(1) and (2) of the Clean Air Act (CAA or Act) for the 1997 8-hour ozone national ambient air quality standards (NAAQS). Section 110(a) of the CAA requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each NAAQS promulgated by EPA, which is commonly referred to as an ``infrastructure'' SIP. FDEP certified that the Florida SIP contains provisions that ensure the 1997 8-hour ozone NAAQS are implemented, enforced, and maintained in Florida (hereafter referred to as ``infrastructure submission''). EPA is now taking three related actions on FDEP's infrastructure submissions for Florida. First, EPA is taking final action to disapprove in part portions of sections 110(a)(2)(C) and 110(a)(2)(J) of the December 13, 2007, submittal as it relates to the regulation of greenhouse gas (GHG) emissions. Second, EPA is taking final action to approve FDEP's May 24, 2012, submission, which addresses the substantive requirements of section 128 relating to State board requirements as applicable to the infrastructure SIP pursuant to section 110(a)(2)(E)(ii), and the substantive requirements of section 110(a)(2)(G), which relates to the authority to implement emergency powers under section 303 of the CAA. Third, and with the exception of the aforementioned portions of sections 110(a)(2)(C) and (J), EPA is finalizing its determination that Florida's infrastructure submission, provided to EPA on December 13, 2007, supplemented on April 18, 2008, addresses all other required infrastructure elements for the 1997 8- hour ozone NAAQS.
Access to Confidential Business Information by Eastern Research Group, Incorporated
EPA will authorize its contractor Eastern Research Group, Incorporated (ERG) to access Confidential Business Information (CBI) which has been submitted to EPA under the authority of all sections of the Resource Conservation and Recovery Act (RCRA) of 1976, as amended. EPA has issued regulations that outline business confidentiality provisions for the Agency and require all EPA Offices that receive information designated by the submitter, as CBI to abide by these provisions.
Proposed Administrative Cost Recovery Settlement Under the Comprehensive Environmental Response Compensation and Liability Act, as Amended, Big River Mine Tailings Superfund Site, St. Francois County, MO
In accordance with Section 122(i) of the Comprehensive Environmental Response Compensation and Liability Act, as amended (CERCLA), notice is hereby given of a proposed administrative settlement with The Doe Run Resources Corporation, St. Louis, Missouri, for recovery of past response costs concerning the Big River Mine Tailings Superfund Site in St. Francois County, Missouri. The settlement requires The Doe Run Resources Corporation to pay $42,077.71, to the Hazardous Substance Superfund. The settlement includes a covenant not to sue the settling party pursuant to Section 107(a) of CERCLA. For thirty (30) days following the date of publication of this notice, EPA will receive written comments relating to the settlement. EPA will consider all comments and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. EPA's response to any comments received will be available for public inspection at the EPA Region 7 office located at 901 N. 5th Street, Kansas City, Kansas.
Public Water System Supervision Program Revision for the State of Alabama
Notice is hereby given that the State of Alabama is revising its approved Public Water System Supervision Program. Alabama has adopted the following rule: Public Notification Rule. EPA has determined that Alabama's rule is no less stringent than the corresponding federal regulation. Therefore, EPA is tentatively approving this revision to the State of Alabama's Public Water System Supervision Program.
Delegation of Authority To Implement and Enforce Outer Continental Shelf Air Regulations to the Virginia Department of Environmental Quality
On February 2, 2012, EPA sent the Virginia Department of Environmental Quality (VADEQ) a letter acknowledging VADEQ will be delegated the authority to implement and enforce sections of the Outer Continental Shelf (OCS) Air Regulations. To inform regulated facilities and the public of VADEQ's delegation of authority to implement and enforce OCS regulations, EPA is making available a copy of EPA's letter to VADEQ through this notice.
Delegation of Authority To Implement and Enforce Outer Continental Shelf Air Regulations to the Delaware Department of Natural Resources and Environmental Control
On July 21, 2010, EPA sent the Delaware Department of Natural Resources and Environmental Control (DNREC) a letter acknowledging DNREC has been delegated the authority to implement and enforce sections of the Outer Continental Shelf (OCS) Air Regulations. To inform regulated facilities and the public of DNREC's delegation of authority to implement and enforce OCS regulations, EPA is making available a copy of EPA's letter to DNREC through this notice.
Forms and Procedures for Submitting Compliance Reports: Requirements Pertaining to Reformulated Gasoline, Anti-dumping, Gasoline Sulfur, Renewable Fuel Standard Requirements, etc. and Greenhouse Gas Reporting Requirements Related to Coal-Based Liquid Fuels and Petroleum Products
EPA's Office of Transportation and Air Quality (OTAQ) is announcing that compliance reports submitted or due on or after August 31, 2012 must be submitted via EPA's Central Data Exchange (CDX). The substance and format of the reports is unchanged. EPA is switching to all-electronic reporting using CDX because it is simple, cost effective, and will improve the availability and integrity of data. As of August 31, 2012, parties will no longer be permitted to submit reports via portable electronic media, such as CDs or diskettes. This notice affects parties subject to reporting requirements under 40 CFR part 80, including requirements pertaining to reformulated gasoline, anti-dumping, gasoline sulfur, ultra-low sulfur diesel, benzene content, and the renewable fuel standard. This notice also affects parties subject to greenhouse gas reporting requirements related to coal-based liquid fuels and petroleum products under 40 CFR part 98, subparts LL and MM.
Cancellation of Pesticides for Non-Payment of Year 2012 Registration Maintenance Fees
Since the amendments of October 1988, the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) has required payment of an annual maintenance fee to keep pesticide registrations in effect. The fee due last January 15, 2012, has gone unpaid for 204 registrations. Section 4(i)(5)(G) of FIFRA provides that the EPA Administrator may cancel these registrations by order and without a hearing; orders to cancel all 204 of these registrations have been issued within the past few days.
Titanium Dioxide; Exemption From the Requirement of a Tolerance
This regulation establishes an exemption from the requirement of a tolerance for residues of titanium dioxide (CAS Reg. No. 13463-67- 7) when used as an inert ingredient (Ultraviolet-stabilizer) (UV), at no more than 5% in pesticide formulations containing the active ingredient napropamide, used in or on growing crops. United Phosphorus, Inc. submitted a petition to EPA under the Federal Food, Drug, and Cosmetic Act (FFDCA), requesting an amendment to an existing requirement of a tolerance. This regulation eliminates the need to establish a maximum permissible level for residues of titanium dioxide.
Clothianidin; Emergency Petition To Suspend; Notice of Availability
PANNA and others submitted a request for the EPA to immediately suspend Clothianidin and take other actions affecting the registration. The EPA is announcing the decision to deny the suspension request and is inviting the public to comment on the decision and the remainder of the petition.
Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment Request; NESHAP for Asphalt Processing and Asphalt Roofing Manufacturing (Renewal)
In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR which is abstracted below describes the nature of the collection and the estimated burden and cost.
Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment Request; NESHAP for Coke Oven Pushing, Quenching, and Battery Stacks (Renewal)
In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR which is abstracted below describes the nature of the collection and the estimated burden and cost.
Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment Request; NESHAP for Publicly Owned Treatment Works (Renewal)
In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR which is abstracted below describes the nature of the collection and the estimated burden and cost.
Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment Request; Enforcement Policy Regarding the Sale and Use of Aftermarket Catalytic Converters (Renewal)
In compliance with the Paperwork Reduction Act (PRA)(44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR, which is abstracted below, describes the nature of the information collection and its estimated burden and cost.
Approval and Promulgation of Implementation Plans; State of Florida: New Source Review; Prevention of Significant Deterioration; Fine Particulate Matter (PM2.5
EPA is proposing to approve changes to the Florida State Implementation Plan (SIP), submitted by the Florida Department of Environmental Protection (FDEP) to EPA on March 15, 2012. The SIP revision modifies Florida's New Source Review (NSR) Prevention of Significant Deterioration (PSD) permitting program. The SIP revision adopts, into the Florida SIP, federal NSR permitting provisions to address the implementation of the fine particulate matter (PM2.5) national ambient air quality standards (NAAQS) as amended in EPA's 2008 NSR PM2.5 Implementation Rule (hereafter referred to as the ``NSR PM2.5 Rule'') and the 2010 PM2.5 PSD Increment, Significant Impact Levels (SILs) and Significant Monitoring Concentration (SMC) Rule (hereafter referred to as the ``PM2.5 PSD Increment-SILs-SMC Rule''). EPA is proposing to approve portions of Florida's SIP revision because the Agency has preliminarily determined that the changes are consistent with the Clean Air Act (CAA or Act) and EPA regulations regarding NSR permitting.
Approval and Promulgation of Air Quality Implementation Plans; Virginia; Removal of Administrative Requirements From the Regulation for the Control of Motor Vehicle Emissions in Northern Virginia
EPA is taking direct final action to approve a State Implementation Plan (SIP) revision submitted by the Commonwealth of Virginia. This revision removes four internal State administrative requirements from the Virginia SIP regulations for the control of motor vehicle emissions in the Northern Virginia Area. This action is being taken under the Clean Air Act (CAA).
Approval and Promulgation of Air Quality Implementation Plans; Virginia; Removal of Administrative Requirements From the Regulation for the Control of Motor Vehicle Emissions in Northern Virginia
EPA proposes to approve the State Implementation Plan (SIP) revision submitted by the submitted by the Commonwealth of Virginia. This revision removes four internal State administrative requirements from the Virginia SIP regulations for the control of motor vehicle emissions in the Northern Virginia Area. In the Final Rules section of this Federal Register, EPA is approving Virginia's SIP submittal as a direct final rule without prior proposal because the Agency views this as a noncontroversial submittal and anticipates no adverse comments. A detailed rationale for the approval is set forth in the direct final rule. If no adverse comments are received in response to this action, no further activity is contemplated. If EPA receives adverse comments, the direct final rule will be withdrawn and all public comments received will be addressed in a subsequent final rule based on this proposed rule. EPA will not institute a second comment period. Any parties interested in commenting on this action should do so at this time.
Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control of Iron and Steel Production Installations; Sintering Plants
EPA proposes to approve revisions to the Maryland State Implementation Plan (SIP) submitted by the Maryland Department of the Environment (MDE) on June 30, 2009. The revisions amend the visible emissions requirements of the Maryland SIP's regulation for the Control of Iron and Steel Production Installations as they apply to sintering plants. The sintering plant located at the Sparrows Point steelmaking facility (Sparrows Point) is the only sintering plant located in the State of Maryland, and therefore the only source affected by these SIP revisions. The revisions exempt the sintering plant from the visible emissions section of the regulation for the Control of Iron and Steel Production Installations contingent upon the source's two wet scrubbers, used to control emissions of particulate matter, continuously monitoring compliance with specified pressure drop and flow rate operating parameters. EPA is approving these revisions because they provide for a continuous means of determining compliance with the applicable SIP emission rate for particulate matter from the sintering plant located at Sparrows Point, and because that emission rate has been demonstrated to protect and maintain the National Ambient Air Quality Standards (NAAQS) for PM10 (particulate matter consisting of particles with an aerodynamic diameter less than or equal to 10 micrometers). EPA is proposing to approve these revisions in accordance with the requirements of the Clean Air Act (CAA). In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final rule without prior proposal because the Agency views this as a noncontroversial submittal and anticipates no adverse comments. A detailed rationale for the approval is set forth in the direct final rule. If no adverse comments are received in response to this action, no further activity is contemplated. If EPA receives adverse comments, the direct final rule will be withdrawn and all public comments received will be addressed in a subsequent final rule based on this proposed rule. EPA will not institute a second comment period. Any parties interested in commenting on this action should do so at this time.
Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control of Iron and Steel Production Installations; Sintering Plants
EPA is taking direct final action to approve revisions to the Maryland State Implementation Plan (SIP) submitted by the Maryland Department of the Environment (MDE) on June 30, 2009. The revisions amend the visible emissions requirements of the Maryland SIP's regulation for the Control of Iron and Steel Production Installations only as they apply to sintering plants. The sintering plant located at the Sparrows Point steelmaking facility (Sparrows Point) is the only sintering plant located in the State of Maryland. The revisions exempt the sintering plant from the visible emissions section of the regulation for the Control of Iron and Steel Production Installations contingent upon the source's two wet scrubbers, used to control emissions of particulate matter, continuously monitoring compliance with specified pressure drop and flow rate operating parameters. EPA is approving these revisions because they provide for a continuous means of determining compliance with the applicable SIP emission rate for particulate matter from the sintering plant located at Sparrows Point, and because that emission rate has been demonstrated to protect and maintain the National Ambient Air Quality Standards (NAAQS) for PM10 (particulate matter consisting of particles with an aerodynamic diameter less than or equal to 10 micrometers). EPA is approving these revisions in accordance with the requirements of the Clean Air Act (CAA).
Proposed Information Collection Request; Comment Request; Valuing Improved Water Quality in the Chesapeake Bay Using Stated Preference Methods (New)
The Environmental Protection Agency is planning to submit an information collection request (ICR), ``Valuing Improved Water Quality in the Chesapeake Bay Using Stated Preference Methods (New)'' (EPA ICR No. 2456.01, OMB Control No. 2010-NEW) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. On May 24, 2012 EPA solicited public comments for 60 days on the proposed ICR. Certain supporting documents were not available for public review in the docket during the first 30 days of the comment period, thus EPA is re-opening the comment period for an additional 30 days from the publication of this notice. Public comments are being solicited on specific aspects of the proposed information collection as described below. This is a request for approval of a new collection. An Agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number.
National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Fort Dix Landfill Superfund Site
The Environmental Protection Agency (EPA) Region 2 is issuing a Notice of Intent to Delete the Fort Dix Landfill Superfund Site (Site) located in Pemberton Township, New Jersey, from the National Priorities List (NPL) and requests public comments on this proposed action. The NPL, promulgated pursuant to section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of New Jersey, through the NJ Department of Environmental Protection, have determined that all appropriate response actions under CERCLA, other than operation, maintenance, and five-year reviews, have been completed. However, this deletion does not preclude future actions under Superfund.
National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Fort Dix Landfill Superfund Site
The Environmental Protection Agency (EPA) Region 2 is publishing a direct final Notice of Deletion of the Fort Dix Landfill Superfund Site (Site), located in Pemberton Township, New Jersey, from the National Priorities List (NPL). The NPL, promulgated pursuant to section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). This direct final deletion is being published by EPA with the concurrence of the State of New Jersey, through the NJ Department of Environmental Protection, because EPA has determined that all appropriate response actions under CERCLA, other than operation, maintenance, and five-year reviews, have been completed. However, this deletion does not preclude future actions under Superfund.
Product Cancellation Order for Certain Pesticide Registrations
This notice announces EPA's order for the cancellations, voluntarily requested by the registrants and accepted by the Agency, of the products listed in Table 1 of Unit II., pursuant to section 6(f)(1) of the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA), as amended. This cancellation order follows a January 11, 2012 Federal Register Notice of Receipt of Requests from the registrants listed in Table 2 of Unit II. to voluntarily cancel these product registrations. In the January 11, 2012 notice, EPA indicated that it would issue an order implementing the cancellations, unless the Agency received substantive comments within the 180 day comment period that would merit its further review of these requests, or unless the registrants withdrew their requests. The Agency received comments on the notice but none merited its further review of the requests. Further, the registrants did not withdraw their requests. Accordingly, EPA hereby issues in this notice a cancellation order granting the requested cancellations. Any distribution, sale, or use of the products subject to this cancellation order is permitted only in accordance with the terms of this order, including any existing stocks provisions.
Pesticide Emergency Exemptions; Agency Decisions and State and Federal Agency Crisis Declarations
EPA has granted emergency exemptions under the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) for use of pesticides as listed in this notice. The exemptions were granted during the period January 1 to March 31, 2012, to control unforeseen pest outbreaks.
Acetamiprid; Pesticide Tolerances
This regulation establishes tolerances for residues of acetamiprid in or on multiple commodities which are identified and discussed later in this document. Interregional Research Project Number 4 (IR-4) requested these tolerances under the Federal Food, Drug, and Cosmetic Act (FFDCA).
Receipt of Several Pesticide Petitions Filed for Residues of Pesticide Chemicals in or on Various Commodities
This document announces the Agency's receipt of several initial filings of pesticide petitions requesting the establishment or modification of regulations for residues of pesticide chemicals in or on various commodities.
Significant New Use Rules on a Certain Chemical Substance; Removal of Significant New Use Rules
EPA is removing significant new use rules (SNURs) promulgated under the Toxic Substances Control Act (TSCA) for five chemical substances which were the subject of premanufacture notices (PMNs). EPA published these SNURs using direct final rulemaking procedures. EPA received notice of intent to submit adverse comments on the rules. Therefore, the Agency is removing these SNURs, as required under the expedited SNUR rulemaking process. EPA intends to publish in the near future proposed SNURs for these five chemical substances under separate notice and comment procedures.
Limited Approval and Disapproval of Air Quality Implementation Plans; Nevada; Clark County; Stationary Source Permits
EPA is proposing a limited approval and limited disapproval of revisions to the Clark County portion of the applicable state implementation plan (SIP) for the State of Nevada. The submitted revisions include new and amended rules governing the issuance of permits for stationary sources, including review and permitting of major sources and major modifications under parts C and D of title I of the Clean Air Act (CAA). The intended effect of this proposed limited approval and limited disapproval action is to update the applicable SIP with current Clark County permitting rules and to set the stage for remedying certain deficiencies in these rules. If finalized as proposed, this limited disapproval action would trigger an obligation on EPA to promulgate a Federal Implementation Plan unless Nevada submits and we approve SIP revisions that correct the deficiencies within two years of the final action, and for certain deficiencies the limited disapproval would also trigger sanctions under section 179 of the CAA unless Nevada submits and we approve SIP revisions that correct the deficiencies within 18 months of final action.
Notice of Data Availability for Approval, Disapproval and Promulgation of Implementation Plans; State of Wyoming; Regional Haze State Implementation Plan; Federal Implementation Plan for Regional Haze
EPA is providing notice that information has been posted in the docket pertaining to EPA's proposed action on the State Implementation Plan (SIP) revision submitted by the State of Wyoming on January 12, 2011, that addresses regional haze. (Docket ID No. EPA-R08- OAR-2012-0026). This information is relevant to the portion of the rulemaking pertaining to the proposed Federal Implementation Plan (FIP) and proposals in the alternative for PacifiCorp Jim Bridger Unit 1 and Unit 2. EPA is requesting comment on the new data provided in the docket. This information could impact EPA's final decision on the rulemaking as it pertains to Jim Bridger Unit 1 and Unit 2.
Approval and Promulgation of Implementation Plans; North Carolina; 110(a)(1) and (2) Infrastructure Requirements for the 1997 Annual and 2006 Fine Particulate Matter National Ambient Air Quality Standards
EPA is proposing to approve in part, and conditionally approve in part, the State Implementation Plan (SIP) revisions, submitted by the State of North Carolina, through the Department of Environment and Natural Resources (NC DENR), Division of Air Quality (DAQ), as demonstrating that the State meets the requirements of sections 110(a)(1) and (2) of the Clean Air Act (CAA or the Act) for the 1997 annual and 2006 24-hour fine particulate matter (PM2.5) national ambient air quality standards (NAAQS). Section 110(a) of the CAA requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each NAAQS promulgated by the EPA, which is commonly referred to as an ``infrastructure'' SIP. DAQ certified that the North Carolina SIP contains provisions that ensure the 1997 annual and 2006 24-hour PM2.5 NAAQS are implemented, enforced, and maintained in North Carolina (hereafter referred to as ``infrastructure submissions''). EPA is proposing to determine that North Carolina's infrastructure submissions, provided to EPA on April 1, 2008, and on September 21, 2009, addressed all the required infrastructure elements for the 1997 annual and 2006 24-hour PM2.5 NAAQS with the exception of sections 110(a)(2)(C), 110(a)(2)(E)(ii) and 110(a)(2)(J). With respect to sections 110(a)(2)(C) related to PSD requirements, 110(a)(2)(E)(ii) and 110(a)(2)(J) related to PSD requirements, EPA is proposing to conditionally approve these requirements.
Notice of Issuance of Final Air Permits for BHP Billiton Petroleum, Inc., Murphy Exploration and Production Co., and Eni US Operating Co., Inc.
This notice is to announce that on May 11, 2012, EPA issued a final Outer Continental Shelf (OCS) air permit for Murphy Exploration and Production Co. (Murphy), and on May 30, 2012, EPA issued a final OCS air permit for BHP Billiton Petroleum, Inc., (BHPB). These permits became effective on June 11, 2012, and June 30, 2012, respectively. In addition, EPA issued a final OCS air permit modification for Eni US Operating Company, Inc. (Eni) on May 8, 2012 that was effective on May 11, 2012. The Murphy permit regulates air pollutant emissions from the Diamond Offshore Ocean Confidence drilling vessel and support vessels, which Murphy intends to operate within lease block Lloyd Ridge 317 on the OCS in the Gulf of Mexico, approximately 135 miles southeast of the mouth of the Mississippi River and 180 miles south of the nearest Florida coast. The BHPB permit regulates air pollutant emissions from one of two drilling vessels owned by Transocean, either the C.R. Luigs or the Development Driller 1, and support vessels, which BHPB intends to operate in multiple locations in BHPB's DeSoto Canyon lease blocks on the OCS in the Gulf of Mexico, approximately 120 miles southeast of the mouth of the Mississippi River and 125 miles from the nearest Alabama and Florida coast. The Eni permit regulates air pollutant emissions from the Transocean Pathfinder drilling vessel and support vessels, which Eni intends to operate within lease block Lloyd Ridge 411 on the OCS in the Gulf of Mexico, approximately 154 miles southeast of the mouth of the Mississippi River and 189 miles south of the nearest Florida coast. All three operations will last less than two years, and based on applicable permitting regulations, are ``temporary sources'' for permitting purposes.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.