Environmental Impacts Statements; Notice of Availability, 44234-44235 [2012-18373]
Download as PDF
44234
Federal Register / Vol. 77, No. 145 / Friday, July 27, 2012 / Notices
erowe on DSK2VPTVN1PROD with NOTICES
Code of Federal Regulations (CFR) part
or section number.
iii. Explain why you agree or disagree;
suggest alternatives and substitute
language for your requested changes.
iv. Describe any assumptions and
provide any technical information and/
or data that you used.
v. If you estimate potential costs or
burdens, explain how you arrived at
your estimate in sufficient detail to
allow for it to be reproduced.
vi. Provide specific examples to
illustrate your concerns and suggest
alternatives.
vii. Explain your views as clearly as
possible, avoiding the use of profanity
or personal threats.
viii. Make sure to submit your
comments by the comment period
deadline identified.
II. Background
On March 20, 2012, The Center for
Food Safety and International Center for
Technology Assessment submitted to
the EPA an ‘‘Emergency Citizen
Petition’’ on behalf of 27 individuals
and non-governmental organizations
requesting that the EPA suspend
registrations for the insecticide
clothianidin for the four following
reasons: (1) To cure clothianidin’s
unlawful conditional registration; (2) to
prevent an imminent hazard to
pollinating insects and the agricultural
interests they support by suspending the
registrations and initiating special
review and cancellation proceedings; (3)
to stop the sale of misbranded
clothianidin products; and (4) to
address Endangered Species Act
consultation obligations for
clothianidin. Given the emergency
nature of the request and the harm
asserted, the EPA has addressed on an
expedited basis the request to suspend
clothianidin registrations to prevent an
imminent hazard. This notice
announces the availability of the EPA’s
petition response on that issue. The EPA
will address the remaining three issues
in the petition after receiving and
considering public comments on the
petition. After reviewing the petition
and the supporting documentation, the
EPA is denying the request to suspend
clothianidin registrations based on the
assertion that an imminent hazard exists
because the petition and supporting
documentation reviewed by the EPA do
not demonstrate a substantial likelihood
of imminent, serious harm that would
justify the suspension of this pesticide
under the FIFRA standard. The EPA is
posting both the petition (including
exhibits and supplemental filings) and
its response to the imminent hazard
claim for 60 days for public comment on
VerDate Mar<15>2010
15:32 Jul 26, 2012
Jkt 226001
its Web site and in the public docket at
regulations.gov. After reviewing the
public comments on the petition the
EPA will respond to the remaining
issues in the petition. In addition, the
EPA will determine in connection with
that review whether the comments
received support the reconsideration of
this partial response.
List of Subjects
Environmental protection,
Agricultural commodities, Pesticides
and pest.
Dated: July 17, 2012.
Steven P. Bradbury,
Director, Office of Pesticide Programs.
[FR Doc. 2012–18321 Filed 7–26–12; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9004–2]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 07/16/2012 through 07/20/2012
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
Supplementary Information: EPA is
seeking agencies to participate in its
e-NEPA electronic EIS submission pilot.
Participating agencies can fulfill all
requirements for EIS filing, eliminating
the need to submit paper copies to EPA
Headquarters, by filing documents
online and providing feedback on the
process. To participate in the pilot,
register at: https://cdx.epa.gov.
EIS No. 20120240, Final EIS, BLM, 00,
Programmatic—Solar Energy
Development in Six Southern States,
To Identify and Prioritize Specific
Locations Best Suited for Utility Scale
Solar Energy Development on Public
Lands, AZ, CA, CO, NV, NM, and UT,
Review Period Ends: 08/27/2012,
Contact: Shannon Stewart, BLM 202
912–7219; Jane Summerson, DOE
202–287–6188. The U.S. Department
of the Interior’s Bureau of Land
Management and the U.S. Department
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
of Energy are Joint Lead Agencies for
this project.
EIS No. 20120241, Final EIS, USFS,
WA, South George Vegetation and
Fuels Management Project, To
Improve Forest Health and Resilience
to Fire, Insects and Disease in Upland
Forests, Pomerory Ranger District,
Umatilla National Forest, Asotin and
Garfield Counties, WA, Review Period
Ends: 08/27/2012, Contact: Dan
Castillo 509–843–1891.
EIS No. 20120242, Final EIS, BLM, WY,
Lost Creek In Situ Recovery Project,
To Analyze the Site-Specific Impacts
Associated with the Plan of
Operations, Sweetwater County, WY,
Review Period Ends: 08/27/2012,
Contact: John Russell 307–328–4252.
EIS No. 20120243, Final EIS, DHS, 00,
Programmatic—Northern Border
Activities Program, Propose to
Enhance its Program of Security along
the United States’ Northern Border
with Canada, from Maine to
Washington, Review Period Ends: 08/
27/2012, Contact: Jennifer Hass 202–
344–1929.
EIS No. 20120244, Draft Supplement,
NNSA, 00, Surplus Plutonium
Disposition (DOE/EIS–0283–S2), To
Consider Options for Pit Disassembly
and Conversion of Plutonium Metal to
Oxide, SC, NM, AL, and TN,
Comment Period Ends: 09/25/2012,
Contact: Sachiko McAlhany 803–952–
6110.
EIS No. 20120245, Final EIS, USA, AK,
Point Thomson Project, Authorization
for the Placement of Fill Material into
U.S. Waters, Permit Application, AK,
Review Period Ends: 08/27/2012,
Contact: Harry A. Baij 907–753–2784.
EIS No. 20120246, Final EIS, USN, CA,
Marine Corps Air Ground Combat
Center Project, Land Acquisition and
Airspace Establishment to Support
Large-Scale MAGTF Live-Fire and
Maneuver Training Facility,
Twentynine Palms, San Bernardino
County, CA, Review Period Ends: 08/
27/2012, Contact: Chris Proudfoot
760–830–3764.
EIS No. 20120247, Final EIS, USACE,
00, Mississippi River Gulf Outlet
Ecosystem Restoration, To Develop a
Comprehensive Ecosystem
Restoration Plan to Restore the Lake
Borgne Ecosystems, LA and MS,
Review Period Ends: 08/27/2012,
Contact: Tammy Gilmore 504–862–
1002.
EIS No. 20120248, Final EIS, USACE,
TX, City of Denison Land
Conveyance, Lake Texoma, To
Convey a Parcel of Federally-owned
Land at Lake Texoma, OK and TX to
the City of Denison, TX, Grayson and
Cooke Counties, TX and Portion of
E:\FR\FM\27JYN1.SGM
27JYN1
Federal Register / Vol. 77, No. 145 / Friday, July 27, 2012 / Notices
Bryan, Marshall, Johnston, and Love
Counties, OK, Review Period Ends:
08/28/2012, Contact: Stephan L.
Nolan 918–669–7660.
EIS No. 20120249, Second Draft EIS
(Tiering), USCG, 00, Tier 1 DEIS—
Rulemaking for Dry Cargo Residue
(DCR) Discharges in the Great Lakes,
To Regulate Nonhazardous and
Nontoxic DCR Sweeping from Vessels
in the Great Lakes that fall under the
Jurisdiction of the United States and
Address Gaps Identified in Phase I
Final EIS, Comment Period Ends: 10/
25/2012, Contact: Timothy O’Brien
202–372–1539.
erowe on DSK2VPTVN1PROD with NOTICES
Amended Notices
EIS No. 20120164, Draft EIS, BLM, CA,
McCoy Solar Energy Project,
Development of up to 750megawatt(mw) Solar Energy Plant,
Right-of-Way Grant, Riverside County,
CA, Comment Period Ends: 08/23/
2012, Contact: Jeff Childers 760–833–
7100 Revision to FR Notice Published
05/25/2012; Extending Comment
Period from 08/22/2012 to 08/23/
2012.
EIS No. 20120209, Draft EIS, USN, FL,
Naval Air Station Key West Airfield
Operations, To Support and Conduct
Aircraft Training Operations, Florida
Keys, Monroe County, FL, Comment
Period Ends: 08/13/2012, Contact:
John Conway 904–542–6870. Revision
to FR Notice Published 06/29/2012;
Extending Comment Period from 08/
13/2012 to 08/28/2012.
EIS No. 20120233, Draft EIS, BLM, NM,
Prehistoric Trackways National
Monument Resource Management
Plan, Implementation, Dona Ana
County, NM, Comment Period Ends:
10/22/2012, Contact: Lori Allen 575–
525–4454. Revision to FR Notice
Published 07/20/2012; Change Filing
Agency from AFS to BLM.
EIS No. 20120237, Final Supplement,
FHWA, CO, US 550 South Connection
to US 160, Updated Information, To
US 160 from Durango to Bayfield, US
Army COE Section 404 Permit, La
Plata County, CO, Review Period
Ends: 08/27/2012, Contact: Stephanie
Gibson 720–963–3013. Revision to FR
Notice Published 07/20/2012; Filed
Corrected Version and Extending
Review Period from 8/20/2012 to
8/27/2012.
Dated: July 24, 2012.
Cliff Rader,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2012–18373 Filed 7–26–12; 8:45 am]
BILLING CODE 6560–50–P
VerDate Mar<15>2010
15:32 Jul 26, 2012
Jkt 226001
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9706–8]
Forms and Procedures for Submitting
Compliance Reports: Requirements
Pertaining to Reformulated Gasoline,
Anti-dumping, Gasoline Sulfur,
Renewable Fuel Standard
Requirements, etc. and Greenhouse
Gas Reporting Requirements Related
to Coal-Based Liquid Fuels and
Petroleum Products
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
EPA’s Office of
Transportation and Air Quality (OTAQ)
is announcing that compliance reports
submitted or due on or after August 31,
2012 must be submitted via EPA’s
Central Data Exchange (CDX). The
substance and format of the reports is
unchanged. EPA is switching to allelectronic reporting using CDX because
it is simple, cost effective, and will
improve the availability and integrity of
data. As of August 31, 2012, parties will
no longer be permitted to submit reports
via portable electronic media, such as
CDs or diskettes. This notice affects
parties subject to reporting requirements
under 40 CFR part 80, including
requirements pertaining to reformulated
gasoline, anti-dumping, gasoline sulfur,
ultra-low sulfur diesel, benzene content,
and the renewable fuel standard. This
notice also affects parties subject to
greenhouse gas reporting requirements
related to coal-based liquid fuels and
petroleum products under 40 CFR part
98, subparts LL and MM.
DATES: The reporting procedures
described in this notice are effective
starting with reports due or submitted to
EPA on or after August 31, 2012.
FOR FURTHER INFORMATION CONTACT:
Anne-Marie C. Pastorkovich, Attorney/
Advisor, Environmental Protection
Agency, 1200 Pennsylvania Avenue
NW. (6406J), Washington, DC 20460;
telephone number: 202–343–9623; fax
number: 202–343–2801; email address:
pastorkovich.anne-marie@epa.gov.
SUPPLEMENTARY INFORMATION:
SUMMARY:
I. Does this notice apply to me?
This action affects regulated parties
who submit information to EPA under
fuels programs governed by 40 CFR Part
80, including the reformulated gasoline,
anti-dumping, gasoline sulfur, ultra-low
sulfur diesel, and benzene programs, as
well as the renewable fuel standard.
This action also affects regulated parties
who submit information to EPA related
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
44235
to the greenhouse gas reporting
requirements of 40 CFR part 98,
subparts LL and MM. The specific
programs and forms affected are
discussed in Section III—What Reports
Must Be Submitted via CDX? Reports
due or submitted to EPA on or after
August 31, 2012 must be submitted to
the OTAQ Fuels Reporting System via
the EPA Central Data Exchange (CDX).
As of that date, regulated parties will no
longer be permitted to report by
submitting portable electronic media,
such as CDs or diskettes. This notice
also affects the resubmission of any
report to EPA, if the resubmission
occurs on or after August 31, 2012. If
you have further questions regarding the
applicability of this action to a
particular party, please contact the
person listed in FOR FURTHER
INFORMATION CONTACT.
II. Why is EPA switching to allelectronic reporting using CDX?
EPA’s Central Data Exchange (CDX)
enables fast, efficient, and secure
submission of data to EPA. Among the
advantages offered by CDX are the
following features, which will improve
fuel reporting under 40 CFR Part 80 and
greenhouse gas reporting under 40 CFR
part 98, subparts LL and MM. CDX
allows regulated parties to:
• Submit data through one
centralized and secure point of access;
• Receive confirmation from EPA
when submissions are received;
• Submit data in a variety of formats
including Excel and flat-file; and
• Reduce costs associated with
submitting and processing data
submissions.
EPA does not charge the regulated
party to set up a CDX account. Virtually
all regulated parties subject to 40 CFR
part 80 already have CDX accounts and
EPA’s primary reporting instructions
already specify the submission of
compliance reports using CDX.
However, to date we have permitted
submission of CDs or diskettes as an
alternative to CDX reporting under
certain circumstances. Starting with
reports due or submitted on or after
August 31, 2012, these alternative
options for submitting reports will no
longer apply.
There are several reasons for
eliminating alternative submission
options. Parties often submit CDs
without properly ‘‘burning’’ data to
them, so that no report is submitted.
EPA staff must then notify the regulated
party that they must re-submit using
CDX or by sending a CD that actually
contains the required data. This type of
reporting error cannot occur with a CDX
transmission.
E:\FR\FM\27JYN1.SGM
27JYN1
Agencies
[Federal Register Volume 77, Number 145 (Friday, July 27, 2012)]
[Notices]
[Pages 44234-44235]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-18373]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9004-2]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7146 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 07/16/2012 through 07/20/2012
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
Supplementary Information: EPA is seeking agencies to participate
in its e-NEPA electronic EIS submission pilot. Participating agencies
can fulfill all requirements for EIS filing, eliminating the need to
submit paper copies to EPA Headquarters, by filing documents online and
providing feedback on the process. To participate in the pilot,
register at: https://cdx.epa.gov.
EIS No. 20120240, Final EIS, BLM, 00, Programmatic--Solar Energy
Development in Six Southern States, To Identify and Prioritize Specific
Locations Best Suited for Utility Scale Solar Energy Development on
Public Lands, AZ, CA, CO, NV, NM, and UT, Review Period Ends: 08/27/
2012, Contact: Shannon Stewart, BLM 202 912-7219; Jane Summerson, DOE
202-287-6188. The U.S. Department of the Interior's Bureau of Land
Management and the U.S. Department of Energy are Joint Lead Agencies
for this project.
EIS No. 20120241, Final EIS, USFS, WA, South George Vegetation and
Fuels Management Project, To Improve Forest Health and Resilience to
Fire, Insects and Disease in Upland Forests, Pomerory Ranger District,
Umatilla National Forest, Asotin and Garfield Counties, WA, Review
Period Ends: 08/27/2012, Contact: Dan Castillo 509-843-1891.
EIS No. 20120242, Final EIS, BLM, WY, Lost Creek In Situ Recovery
Project, To Analyze the Site-Specific Impacts Associated with the Plan
of Operations, Sweetwater County, WY, Review Period Ends: 08/27/2012,
Contact: John Russell 307-328-4252.
EIS No. 20120243, Final EIS, DHS, 00, Programmatic--Northern Border
Activities Program, Propose to Enhance its Program of Security along
the United States' Northern Border with Canada, from Maine to
Washington, Review Period Ends: 08/27/2012, Contact: Jennifer Hass 202-
344-1929.
EIS No. 20120244, Draft Supplement, NNSA, 00, Surplus Plutonium
Disposition (DOE/EIS-0283-S2), To Consider Options for Pit Disassembly
and Conversion of Plutonium Metal to Oxide, SC, NM, AL, and TN, Comment
Period Ends: 09/25/2012, Contact: Sachiko McAlhany 803-952-6110.
EIS No. 20120245, Final EIS, USA, AK, Point Thomson Project,
Authorization for the Placement of Fill Material into U.S. Waters,
Permit Application, AK, Review Period Ends: 08/27/2012, Contact: Harry
A. Baij 907-753-2784.
EIS No. 20120246, Final EIS, USN, CA, Marine Corps Air Ground Combat
Center Project, Land Acquisition and Airspace Establishment to Support
Large-Scale MAGTF Live-Fire and Maneuver Training Facility, Twentynine
Palms, San Bernardino County, CA, Review Period Ends: 08/27/2012,
Contact: Chris Proudfoot 760-830-3764.
EIS No. 20120247, Final EIS, USACE, 00, Mississippi River Gulf Outlet
Ecosystem Restoration, To Develop a Comprehensive Ecosystem Restoration
Plan to Restore the Lake Borgne Ecosystems, LA and MS, Review Period
Ends: 08/27/2012, Contact: Tammy Gilmore 504-862-1002.
EIS No. 20120248, Final EIS, USACE, TX, City of Denison Land
Conveyance, Lake Texoma, To Convey a Parcel of Federally-owned Land at
Lake Texoma, OK and TX to the City of Denison, TX, Grayson and Cooke
Counties, TX and Portion of
[[Page 44235]]
Bryan, Marshall, Johnston, and Love Counties, OK, Review Period Ends:
08/28/2012, Contact: Stephan L. Nolan 918-669-7660.
EIS No. 20120249, Second Draft EIS (Tiering), USCG, 00, Tier 1 DEIS--
Rulemaking for Dry Cargo Residue (DCR) Discharges in the Great Lakes,
To Regulate Nonhazardous and Nontoxic DCR Sweeping from Vessels in the
Great Lakes that fall under the Jurisdiction of the United States and
Address Gaps Identified in Phase I Final EIS, Comment Period Ends: 10/
25/2012, Contact: Timothy O'Brien 202-372-1539.
Amended Notices
EIS No. 20120164, Draft EIS, BLM, CA, McCoy Solar Energy Project,
Development of up to 750-megawatt(mw) Solar Energy Plant, Right-of-Way
Grant, Riverside County, CA, Comment Period Ends: 08/23/2012, Contact:
Jeff Childers 760-833-7100 Revision to FR Notice Published 05/25/2012;
Extending Comment Period from 08/22/2012 to 08/23/2012.
EIS No. 20120209, Draft EIS, USN, FL, Naval Air Station Key West
Airfield Operations, To Support and Conduct Aircraft Training
Operations, Florida Keys, Monroe County, FL, Comment Period Ends: 08/
13/2012, Contact: John Conway 904-542-6870. Revision to FR Notice
Published 06/29/2012; Extending Comment Period from 08/13/2012 to 08/
28/2012.
EIS No. 20120233, Draft EIS, BLM, NM, Prehistoric Trackways National
Monument Resource Management Plan, Implementation, Dona Ana County, NM,
Comment Period Ends: 10/22/2012, Contact: Lori Allen 575-525-4454.
Revision to FR Notice Published 07/20/2012; Change Filing Agency from
AFS to BLM.
EIS No. 20120237, Final Supplement, FHWA, CO, US 550 South Connection
to US 160, Updated Information, To US 160 from Durango to Bayfield, US
Army COE Section 404 Permit, La Plata County, CO, Review Period Ends:
08/27/2012, Contact: Stephanie Gibson 720-963-3013. Revision to FR
Notice Published 07/20/2012; Filed Corrected Version and Extending
Review Period from 8/20/2012 to 8/27/2012.
Dated: July 24, 2012.
Cliff Rader,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2012-18373 Filed 7-26-12; 8:45 am]
BILLING CODE 6560-50-P