Environmental Protection Agency August 30, 2011 – Federal Register Recent Federal Regulation Documents
Results 1 - 3 of 3
EPA Seeking Input Materials Measurement; Municipal Solid Waste (MSW), Recycling, and Source Reduction Measurement in the U.S.
The Environmental Protection Agency (EPA or the Agency) issued a notice in the Federal Register of August 2, 2011 soliciting stakeholder input regarding the efficacy and scope of the MSW Characterization Report called ``Municipal Solid Waste in the United States'' as part of a broader discussion about sustainable materials management. This information will be used to develop new measurement definitions and protocols for measurement of these materials, as well as the possible addition of construction and demolition (C&D) materials and non-hazardous industrial materials to the list of materials addressed in future efforts. This effort could lead to the creation of a new measurement report that the EPA will make publicly available. This document is extending the comment period from August 31, 2011 to September 30, 2011.
Proposed Administrative Settlement Agreement and Order on Consent; In Re: Ely Copper Mine Superfund Site, Located in Vershire, VT
In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. 9622(i), and Section 7003(d) of the Resource Conservation and Recovery Act (``RCRA''), 42 U.S.C. 9673(d), notice is hereby given of a proposed settlement for recovery of past and projected future response costs concerning the Ely Copper Mine Superfund Site in Vershire, Vermont with the following settling party: Ely Mine Forest, Inc. The proposed settlement requires the settling party to hold all of its remaining cash accounts for purposes of paying certain site-related expenses approved by EPA. In addition, the proposed settlement requires the settling party to: use best efforts to market and sell the site property, allow EPA to remove and use borrow material located on the site property, provide EPA and their contractors access to the site property, and prepare and record any documents necessary to implement institutional controls on the site property. The proposed settlement includes a covenant not to sue the settling party pursuant to Section 107(a) of CERCLA, 42 U.S.C. 9607(a) and Section 7003 of RCRA, 42 U.S.C. 6973. For thirty (30) days following the date of publication of this notice, the Agency will receive written comments relating to the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. The Agency's response to any comments received will be available for public inspection at the US EPA Region 1 OSRR Records and Information Center, 5 Post Office Square, Suite 100, Boston, MA 02109. During the public comment period, commenters may request an opportunity for a public meeting in the affected area in accordance with Section 7003(d) of RCRA, 42 U.S.C. 6973(d).
Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality Planning Purposes; Louisiana; Baton Rouge Ozone Nonattainment Area: Redesignation to Attainment for the 1997 8-Hour Ozone Standard
EPA is proposing to approve a request from the State of Louisiana to redesignate the Baton Rouge, Louisiana moderate 1997 8- hour ozone nonattainment area to attainment of the 1997 8-hour ozone standard. In proposing to approve this request, EPA also proposes to approve as a revision to the Louisiana State Implementation Plan (SIP), a 1997 8-hour ozone maintenance plan with a 2022 Motor Vehicle Emissions Budget (MVEB) for the Baton Rouge Nonattainment Area (BRNA or BR). EPA is also proposing to approve revisions to the Louisiana SIP that meets the Reasonably Available Control Technology (RACT) requirements (for nitrogen oxides (NOX) and volatile organic compounds (VOCs)) for the 1-hour and 1997 8-hour ozone standard requirements, and to approve a state rule establishing a maintenance plan contingency measure. In prior, separate rulemaking actions, EPA finalized its action to terminate the 1-hour ozone anti-backsliding section 185 penalty fee requirement. EPA has proposed to approve the Control Technique Guideline Rules (CTG Rules Update) that are necessary for redesignation. We are proposing that if the CTG Rules Update is finalized, the area will have a fully approved SIP that meets all of its applicable 1997 8-hour requirements and 1-hour anti-backsliding requirements under section 110 and Part D of the Federal Clean Air Act (CAA or Act) for purposes of redesignation.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.