Environmental Protection Agency March 16, 2006 – Federal Register Recent Federal Regulation Documents
Results 1 - 9 of 9
Lead Paint Test Kit Development; Request for Comments
EPA is requesting information concerning the development of test kits or similar technologies for testing lead in paint that could be used by renovators, repair persons, and painters complying with a future EPA regulation for renovation, repair, and painting activities. This information will be considered in formulating EPA's policy and research decisions regarding the development of lead paint test kits. The lead paint test kits will allow renovators, repair persons, and painters to focus resources and identify locations where lead-based paint is present and reliably determine situations where appropriate preventive actions should be undertaken.
Agency Information Collection Activities OMB Responses
This document announces the Office of Management and Budget's (OMB) responses to Agency Clearance requests, in compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et. seq). An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The OMB control numbers for EPA's regulations are listed in 40 CFR part 9 and 48 CFR chapter 15.
Proposed Approval of Central Characterization Project's Transuranic Waste Characterization Program at the Savannah River Site
The Environmental Protection Agency (``EPA'' or ``we'') is announcing the availability of, and soliciting public comments for 45 days on, the proposed approval of the waste characterization program implemented by the Central Characterization Project (``CCP'') to characterize transuranic (``TRU'') radioactive waste at the Savannah River Site (SRS) proposed for disposal at the Waste Isolation Pilot Plant (``WIPP''). In accordance with the WIPP Compliance Criteria, EPA evaluated the CCP's characterization of TRU debris waste and soils/ gravel from SRS during an inspection conducted October 31-November 3, 2005. Using the systems and processes developed as part of the Department of Energy's (``DOE's'') Carlsbad Field Office (``CBFO'') CCP, EPA verified whether DOE could adequately characterize TRU waste consistent with the Compliance Criteria. The results of EPA's evaluation of the SRS CCP program and the proposed approval are described in EPA's inspection report, which is available for review in the public dockets listed in ADDRESSES. We will consider public comments received on or before the due date mentioned in DATES. This notice summarizes the waste characterization processes EPA evaluated, the ``tier'' EPA assigned to each waste characterization process component, and the TRU waste categories proposed for approval. As required by the 40 CFR 194.8 changes promulgated in July 2004, at the end of a 45-day comment period EPA will evaluate public comments received, finalize the report responding to the relevant public comments, and issue the final report and an approval letter to DOE's Carlsbad Field Office. Waste that is characterized by the SRS CCP is not eligible for disposal at WIPP until EPA formally grants its approval.
Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for Onyx Environmental Services
This document announces that the EPA Administrator has responded to a citizen petition asking EPA to object to a Clean Air Act (Act) title V operating permit proposed by the Illinois Environmental Protection Agency (IEPA). Specifically, the Administrator has partially granted and partially denied the petition submitted by the Sierra Club and American Bottom Conservancy to object to the proposed operating permit for Onyx Environmental Services. Pursuant to section 505(b)(2) of the Act, a petitioner may seek in the United States Court of Appeals for the appropriate circuit judicial review of those portions of the petition which EPA denied. Any petition for review shall be filed within 60 days from the date a notice appears in the Federal Register, pursuant to section 307 of the Act.
Guidance on Passive Foreign Investment Company (PFIC) Purging Elections; Hearing Cancellation
This document provides notice of cancellation of a public hearing on a notice of proposed rulemaking by cross-reference to temporary regulations, notice of proposed rulemaking, and notice of public hearing providing certain elections for taxpayers, who in limited circumstances, continue to be subject to the excess distribution regime of section 1291 even though the foreign corporation in which they own stock is no longer treated as a PFIC under section1297(e).
Testing of Certain High Production Volume Chemicals
EPA is promulgating a final rule under the Toxic Substances Control Act (TSCA) that requires manufacturers (including importers) and processors of 17 high production volume (HPV) chemicals to conduct acute toxicity, repeat dose toxicity, developmental and reproductive toxicity, genetic toxicity (gene mutations and chromosomal aberrations), ecotoxicity (in fish, Daphnia, and algae), and environmental fate (including 5 tests for physical chemical properties and biodegradation) testing. EPA has determined that each of the 17 chemicals included in this final rule is produced in substantial quantities and that there is or may be substantial human exposure to each of them. Moreover, EPA has determined that there are insufficient data to reasonably determine or predict the effects on health or the environment of the manufacture, distribution in commerce, processing, use, or disposal of the chemicals, or any combination of these activities. EPA has concluded that this testing program is necessary and appropriate for developing such data. Data developed under this final rule will provide critical information about the environmental fate and potential hazards of these chemicals which, when combined with information about exposure and uses, will allow the Agency and others to evaluate potential health and environmental risks and take appropriate actions. Persons who export or intend to export any chemical included in this final rule, regardless of the form in which it is exported, are subject to the export notification requirements of TSCA section 12(b).
Approval and Promulgation of Air Quality Implementation Plans; Arkansas Update to Materials Incorporated by Reference
EPA is updating the materials submitted by the State of Arkansas that are incorporated by reference (IBR) into the State Implementation Plan (SIP). The regulations affected by this update have been previously submitted by Arkansas and approved by EPA. This update affects the SIP materials that are available for public inspection at the National Archives and Records Administration (NARA), the Air and Radiation Docket and Information Center located at EPA Headquarters in Washington, DC, and the EPA Regional Office.
Approval and Promulgation of Implementation Plans; Georgia: Approval of Revisions to the State Implementation Plan
EPA is correcting the State Implementation Plan (SIP) for the State of Georgia to remove a provision relating to a Georgia general ``nuisance'' rule. EPA has determined that this provision relating to Georgia Rule 391-3-1.02(2)(a)1, was erroneously incorporated into the SIP. EPA is removing this rule from the approved Georgia SIP because the Georgia rule is not related to the attainment and maintenance of the national ambient air quality standards (NAAQS). This final rule addresses comments made on the proposed rulemaking EPA previously published for this action.
Approval and Promulgation of Air Quality Implementation Plans; Texas; Permits by Rule
EPA is approving a State Implementation Plan (SIP) revision for the State of Texas. This action removes a provision from the Texas SIP which provided public notice for concrete batch plants which were constructed under a permit by rule (PBR). On September 1, 2000, Texas replaced the PBR for concrete batch plants with a standard permit for concrete batch plants. The standard permit for concrete batch plants also requires public notice for concrete batch plant subject to the standard permit. Texas maintained the public notice requirements of its PBR to assure that proper procedures were followed for concrete batch plants that were permitted under the PBR prior to the effective date of the standard permit. All authorization requests for concrete batch plants which were constructed under the PBR have now been resolved and the public notice and comment provisions under the PBR are no longer needed.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.