Availability of the Draft Environmental Impact Statement/Environmental Impact Report for the San Luis Obispo Creek Watershed Waterway Management Plan, City and County of San Luis Obispo, CA
Document Number: 05-5903
Type: Notice
Date: 2005-03-25
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers is issuing this notice to advise the public that a Draft Environmental Impact Statement (DEIS) has been prepared for the San Luis Obispo Creek Watershed Waterway Management Plan within the City and County of San Luis Obispo, California and is available for review and comment.
Notice of Intent To Prepare a Draft Environmental Impact Statement (EIS) for a Permit Application for the Proposed Timber Branch Subdivision Phase II, Near Covington, St. Tammany Parish, LA
Document Number: 05-5123
Type: Notice
Date: 2005-03-16
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, New Orleans District, is initiating the preparation of an Environmental Impact Statement under the National Environmental Policy Act in compliance with a judicial order. The Environmental Impact Statement is for a Department of the Army permit issued under Section 404 of the Clean Water Act to install the infrastructure necessary to implement an approximately 82-acre residential development to provide single and multi-family residential lots in the vicinity of LA Hwy 1085 and Bricker Road, near Covington, Louisiana, some of the property containing regulated wetlands. The permit was subsequently enjoined by the United States District Court, Eastern District of Louisiana. Information obtained from preparation of this EIS will be utilized in the re-evaluation of the enjoined permit decision.
Intent to Prepare a Joint Supplemental Environmental Impact Statement/Supplemental Environmental Impact Report for the San Luis Rey River Flood Control Project, Operations and Maintenance Plan; San Diego County, CA
Document Number: C5-4177
Type: Notice
Date: 2005-03-14
Agency: Department of Defense, Internal Revenue Service, Department of Treasury, Securities and Exchange Commission, Agencies and Commissions, Department of the Treasury, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Withdrawal of Notice for Preparation of a Draft Supplemental Environmental Impact Statement to the July 2002 Final Dredged Material Management Plan and Environmental Impact Statement, McNary Reservoir and Lower Snake River Reservoirs, in the States of Oregon, Washington, and Idaho
Document Number: 05-4819
Type: Notice
Date: 2005-03-11
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Walla Walla District of the U.S. Army Corps of Engineers (Corps) is withdrawing its intent to prepare a Supplemental Environmental Impact Statement (SEIS) to the July 2002 Final Dredged Material Management Plan (DMMP) and Environmental Impact Statement (EIS): McNary Reservoir and Lower Snake River Reservoirs (DMMP/EIS). The Notice of Intent was for the SEIS published in the Federal Register on June 5, 2003 (68 FR 33684). The Corps is now re-evaluating channel maintenance needs and has determined that an SIES is not appropriate at this time.
Preparation of an Environmental Impact Statement for Issuance of an Incidental Take Permit Associated With a Habitat Conservation Plan for Western Placer County, CA
Document Number: 05-4316
Type: Notice
Date: 2005-03-07
Agency: Department of Commerce, National Oceanic and Atmospheric Administration, Department of Defense, Fish and Wildlife Service, Department of the Interior, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to the National Environmental Policy Act (NEPA), we, the U.S. Fish and Wildlife Service (Service), are issuing this notice to advise the public that we intend to gather information necessary to prepare, in cooperation with the National Oceanic and Atmospheric Administration's Marine Fisheries Service (NOAA) and U.S. Army Corps of Engineers (Corps), an Environmental Impact Statement (EIS) and Environmental Impact Report (EIR) for the proposed Placer County Conservation Plan (PCCP). The Service is the lead agency for this EIS, and NOAA and the Corps are cooperating agencies. Placer County Planning Department, the Resource Conservation District, the City of Lincoln, the Placer County Water Agency, and the South Placer Regional Transportation Authority (Applicants) intend to apply to the Service and NOAA for 50-year Endangered Species Act (ESA) permits. The permits are needed to authorize the incidental take of species that could occur as a result of implementation activities proposed to be covered under the PCCP. The Service, in cooperation with NOAA and the Corps, provides this notice to: (1) Describe the proposed action and possible alternatives; (2) advise other Federal and State agencies, affected Tribes, and the public of our intent to prepare an EIS/EIR; (3) announce the initiation of a public scoping period; and (4) obtain suggestions and information on the scope of issues and alternatives to be included in the EIS/EIR.
Cancellation of the Notice of Intent To Prepare a Draft Environmental Impact Statement for the Acme Basin B Discharge Project
Document Number: 05-4178
Type: Notice
Date: 2005-03-04
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Jacksonville District, U.S. Army Corps of Engineers hereby cancels its Notice of Intent to prepare a Draft Environmental Impact Statement (DEIS) for the Acme Basin B Discharge Project, as published in Federal Register on Friday, May 24, 2002 (67 FR 36577). The notice is canceled because, during scoping for this project and development of alternatives, it appeared that each of the alternatives would affect the same 410 acres of agricultural lands, converting sugar cane into functional wetlands, resulting in discharge of cleaner water into Loxahatchee National Wildlife Refuge (WCA-1), increasing the spatial extent of Everglades wetlands and reducing freshwater flows into Lake Worth Lagoon. While all of these effects are environmentally beneficial, the relative magnitude of the impacts in the context of greater Everglades's restoration was determined not to be significant. There are not expected to be any adverse impacts on public health and safety; the affected area (Acme Basin B) is not environmentally unique; the significant WCA-1 wetlands will benefit by a relatively small increment, as will Lake Worth Lagoon. No public controversy related to the proposed alternatives developed during scoping for this project, nor are there high levels of uncertainty, unique or unknown risks associated with the study, nor have surveys revealed the presence of any significant wildlife, cultural resource elements or contaminants. An environmental Assessment will be prepared and coordinated for the proposed action. This document is expected to be available in August 2005.
Intent To Prepare a Joint Supplemental Environment Impact Statement/Supplemental Environmental Impact Report for the San Luis Rey River Flood Control Project, Operations and Maintenance Plan; San Diego County, CA
Document Number: 05-4177
Type: Notice
Date: 2005-03-04
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps) and City of Oceanside amends the notice published in the Federal Register on June 8, 1999 (64 FR 30496), which announced the Corps' intent to prepare a Supplemental Environmental Impact Statement (EIS) for the proposed reauthorization study of the on-going flood control project on the San Luis Rey River, City of Oceanside, San Diego County, California. This amendment to the notice revises the June 8, 1999, notice to announce the Corps' intent to prepare a Supplemental Environmental Impact Statement/Environmental Impact Report (SEIS/EIR) to address changes to the operation and maintenance (O&M) plan for the on-going flood control project on the San Luis Rey River. The study area is located in the City of Oceanside, in the northwest portion of San Diego County, California. The study area is comprised of the lower 7.2 miles of the river, from the Pacific Ocean to the College Boulevard Bridge. The original Final Environmental Impact Statement (FEIS) was dated September 25, 1970.
Intent To Prepare a Draft Environmental Impact Statement for a Permit Application for the Proposed Hemet/San Jacinto Integrated Recharge and Recovery Program in San Jacinto, Riverside County, CA
Document Number: 05-3975
Type: Notice
Date: 2005-03-02
Agency: Department of Defense, Corps of Engineers, Department of the Army, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps), Los Angeles District, Regulatory Branch is considering an application from the Eastern Municipal Water District (EMWD) for a Department of the Army permit under Section 404 of the Clean Water Act to construct a groundwater recharge and storage facility in and adjacent to the San Jacinto River. The proposed project would consist of up to fifteen recharge basins (six in proposed Phase 1 and nine in proposed Phase 2) on approximately 100- acres in the San Jacinto River Channel, upgrades to two existing pump stations, a new approximately 7.7-mile-long water supply pipeline, up to ten extraction wells located west of the San Jacinto River, and up to six monitoring wells located near the western edge of the proposed recharge basins. The Federal action involved in the project is the discharge of dredge and/or fill materials within waters of the United States. The Corps has determined that the potential impacts on the human environment from such activities may be adverse and significant. Therefore, in accordance with the National Environmental Policy Act (NEPA), the Corps will prepare an Environmental Impact Statement (EIS) prior to rendering a final decision on EMWD's permit application. The Corps may ultimately make a determination to grant or deny the permit or conditionally grant the permit. The Draft EIS is intended to be sufficient in scope to address the Federal and environmental issues concerning the proposed Federal permit action.
Availability of Draft Tiered Environmental Impact Statement for the Baltimore Harbor and Channels Dredged Material Plan, MD
Document Number: 05-2483
Type: Notice
Date: 2005-02-09
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with the requirements of the National Environmental Policy Act, the U.S. Army Corps of Engineers (USACE), Baltimore District has prepared a Draft Tiered Environmental Impact statement (TEIS) and Dredged Material Management Plan (DMMP) to analyze dredged material placement for the Port of Baltimore for 20 years of maintenance and new work dredging. USACE is making the document available to the public for review and comment through a Notice of Availability published in the Federal Register. The overall goal of the DMMP is to develop a plan to maintain, in an economically and environmentally sound manner, channels necessary for navigation for the Port of Baltimore, conduct dredged material placement in the most environmentally sound manner, and maximize the use of dredged material as a beneficial resource. The recommendations which will provide a minimum of 20 years of dredged material placement capacity for the Port of Baltimore are: Continued use of open water placement in Virginia (Dam Neck Open Water Placement; Rappahannock Shoal Deep Alternate Open Water Placement; and Wolf Trap Alternate Open Water Placement). Optimized use of existing dredged material management sites in Maryland, including Pooles Island Open Water Site, Hart-Miller Island Dredged Material Containment Facility, Cox Creek Confined Disposal Facility and Poplar Island Environmental Restoration Project (PIERP). Multiple confined disposal facilities for harbor material in Patapsco River. Large Island Restoration-Middle Chesapeake Bay. PIERP Expansion. Wetland Restoration-Dorchester County. We are making the Draft TEIS available to the public for a 45-day review and comment period.
Notice of Intent To Prepare a Draft Environmental Impact Statement for an Environmental Dredging Project on the Mahoning River in Ohio
Document Number: 05-2265
Type: Notice
Date: 2005-02-07
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
This notice advises the public that pursuant to the National Environmental Policy Act (NEPA) of 1969, as amended, the Pittsburgh District (District), U.S. Army Corps of Engineers, intends to develop a Draft Environmental Impact Statement (EIS). The Draft EIS will consider Federal actions associated with the District's proposal to restore the aquatic ecosystem of the lower Mahoning River in Ohio through (1) Dredging contaminated sediments lining the river; (2) bioremediating sediments in the bank and river where applicable; (3) capping contaminants in the bank; and (4) removing low-head dams along the river; or a combination of all four actions. The lower Mahoning River's ecosystem has been severely impacted by contamination from industries that once lined the valley and by several low-head dams that disrupt the river's natural hydrology. The proposed project will improve the lower Mahoning River's ecosystem to a level found at a model reach located just upstream of the project area.
Intent To Prepare an Environmental Impact Statement for Proposed Wharf Improvements and Fill at Apra Harbor, GU
Document Number: 05-1914
Type: Notice
Date: 2005-02-02
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969 as implemented by the Council on Environmental Quality (CEQ) regulations (40 CFR parts 1500-1508), the Port Authority of Guam and the U.S. Army Corps of Engineers hereby give notice of intent to prepare a Environmental Impact Statement (EIS) for proposed wharf improvements and fill at Apra Harbor, Guam. Under a Federal grant from the U.S. Department of Commerce Economic Development Administration, the Port Authority of Guam is proposing modifications to Apra Harbor for the purpose of improving maritime access and services to the island of Guam. The harbor is in need of improvements to meet anticipated future demands of the island's commercial port operations by providing additional cargo container storage area, and berthing facilities capable of accommodating the newest generation of large deep draft container vessels, and cruise ships. The proposed improvements would also provide contingency berthing facilities for U.S. Navy military vessels. The U.S. Army Corps of Engineers will be the lead agency in preparing the EIS. The EIS will provide an analysis of potential impacts to the environment from the proposed modifications to Apra Harbor, in compliance with NEPA and CEQ regulations.
Inland Waterways Users Board
Document Number: 05-1913
Type: Notice
Date: 2005-02-02
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In Accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting. Name of Committee: Inland Waterways Users Board (Board). Date: February 24, 2005. Location: The Washington Court Hotel, 525 New Jersey Avenue NW., Washington, DC 20001-1527, (1-202-628-2100). Time: Registration will begin at 8:30 a.m. and the meeting is scheduled to adjourn at 1 p.m. Agenda: The Board will hear briefings on the status of both the funding for inland navigation projects and studies, and the Inland Waterways Trust Fund. The Board will also consider its priorities for the next fiscal year.
Intent To Prepare a Joint Supplemental Environmental Impact Statement/Environmental Impact Report for the Hamilton Wetland Restoration Project Dredged Material Transfer Facility, Marin County, CA
Document Number: 05-903
Type: Notice
Date: 2005-01-18
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969 as implemented by the Council on Environmental Quality regulations (40 CFR parts 1500-1508), the California Environmental Quality Act (CEQA), and Public Law 102-484 section 2834, as amended by Public Law 104-106 section 2867, the Department of the Army and the California State Coastal Conservancy (SCC) hereby give notice of intent to prepare a joint Supplemental Environmental Impact Statement/Environmental Impact Report (SEIS/EIR) for the Hamilton Wetland Restoration Project (HWRP), Marin County, California to consider alternative methods to transfer dredged material collected from various navigational dredging projects within San Francisco Bay to the HWRP site for beneficial re-use in the construction of tidal and seasonal wetlands. The U.S. Army Corps of Engineers (Corps) is the lead agency for this project under NEPA. The SCC is the lead agency for this project under CEQA. A pubic scoping meeting will be held to solicit comments on the environmental scope of the project and the appropriate scope of the SEIS/EIR.
Chief of Engineers Environmental Advisory Board; Meeting
Document Number: 05-902
Type: Notice
Date: 2005-01-18
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting. The meeting is open to the public. Name of Committee: Chief of Engineers Environmental Advisory Board (EAB). Date: February 2, 2005. Location: Embassy Suites Hotel Alexandria-Old Town, 1900 Diagonal Road, Alexandria, Virginia 22314, (703) 684-5900. Time: 9 a.m. to 12 p.m.