Federal Highway Administration July 2013 – Federal Register Recent Federal Regulation Documents

Notice of Final Federal Agency Actions on Transportation Project in Washington State
Document Number: 2013-17877
Type: Notice
Date: 2013-07-30
Agency: Federal Highway Administration, Department of Transportation
This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the State Route 167 Puyallup to SR 509, Puyallup River Bridge Replacement Project, located in the City of Puyallup (Milepost [MP] 6.40) in Pierce County, Washington. The action by FHWA is the Record of Decision (ROD), which selects a new bridge and roadway alignment for southbound traffic, which will accommodate the future SR 167 Extension interchange and removes the existing steel truss as a last order of work. Actions by other Federal agencies include issuing permits.
National Tunnel Inspection Standards
Document Number: 2013-17875
Type: Proposed Rule
Date: 2013-07-30
Agency: Federal Highway Administration, Department of Transportation
The FHWA is proposing the National Tunnel Inspection Standards (NTIS) for highway tunnels. The FHWA previously proposed the NTIS in a notice of proposed rulemaking (NPRM) published in the Federal Register on July 22, 2010. On July 6, 2012, the President signed the Moving Ahead for Progress in the 21st Century Act (MAP-21), which requires the Secretary to establish national standards for tunnel inspections. The MAP-21 requires that NTIS contain a number of provisions that were not included in the proposal set forth in the earlier NPRM. As a result, FHWA is issuing this SNPRM to request comment on a revised NTIS proposal that incorporates the provisions required by MAP-21. This SNPRM proposes requirements for tunnel owners, including the establishment of a program for the inspection of highway tunnels, maintenance of a tunnel inventory, reporting of the inspection findings to FHWA, and correction of any critical findings identified during these inspections.
Proposed Memorandum of Understanding (MOU) Assigning Environmental Responsibilities to the State of Texas for Categorical Exclusions
Document Number: 2013-18115
Type: Notice
Date: 2013-07-29
Agency: Federal Highway Administration, Department of Transportation
This notice announces that the FHWA and the Texas Department of Transportation (State) have developed a proposed MOU, pursuant to 23 U.S.C. 326, under which the FHWA would assign to the State the FHWA's responsibility for determining whether a project is categorically excluded from preparation of an environmental assessment or an environmental impact statement under the National Environmental Policy Act of 1969, 42 U.S.C. 4321 et seq. (NEPA), and for carrying out certain other responsibilities for conducting environmental reviews, consultations, and related activities for Federal-aid highway projects. The public is invited to comment on any aspect of the proposed MOU, including the proposed designations of categorical exclusions and scope of environmental review, consultation and other activities to be assigned.
Notice of Final Federal Agency Actions on the Goethals Bridge Replacement Project in New York and New Jersey
Document Number: 2013-16611
Type: Notice
Date: 2013-07-15
Agency: Federal Highway Administration, Department of Transportation
This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the Goethals Bridge Replacement Project located in Staten Island, New York, and Elizabeth, New Jersey. Those actions grant approvals for the project.
Buy America Policy
Document Number: 2013-16554
Type: Notice
Date: 2013-07-10
Agency: Federal Highway Administration, Department of Transportation
The FHWA is seeking comments regarding the continued need, in whole or in part, for the general waivers from Buy America for manufactured products; for ferry boat equipment; and for pig iron and processed, pelletized, and reduced iron ores. These waivers have been in effect since 1983, 1994, and 1995, respectively. The FHWA is also seeking comment on the continuing need for the FHWA's minimal use threshold (currently established at $2,500 or 1/10 of 1 percent of the total contract value, whichever is greater).
Notice of Final Federal Agency Action on Proposed Highway in Georgia the Interstate 75 (I-75) Express, Clayton and Henry Counties, Georgia (Atlanta Metropolitan Area)
Document Number: 2013-16112
Type: Notice
Date: 2013-07-05
Agency: Federal Highway Administration, Department of Transportation
This notice announces actions taken by FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The I-75 Express Lanes Project will design a managed lane system along I-75 from the SR 155 (Zack Hinton Parkway, South) interchange in Henry County north to the SR 138 (Stockbridge Highway) interchange in Clayton counties, a distance of approximately 17.94 miles. Those actions grant licenses, permits and approvals for the project.
Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts
Document Number: 2013-15755
Type: Notice
Date: 2013-07-03
Agency: Federal Highway Administration, Department of Transportation
This notice announces action taken by the FHWA and the United States Army Corps of Engineers (USACE) that is final within the meaning of 23 U.S.C. Sec. 139(l)(1). The actions relate to the proposed Mitchell River Bridge (Bridge Street over the Mitchell River) Replacement Project in Chatham-Barnstable County, Massachusetts. The action grants an approval for the project.
Temporary Closure of I-65 (I-70/I-65 South Split Interchange to I-70/I-65 North Split Interchange) in the City of Indianapolis
Document Number: 2013-15655
Type: Notice
Date: 2013-07-01
Agency: Federal Highway Administration, Department of Transportation
The Indiana Department of Transportation (INDOT) has requested FHWA approval of INDOT's proposed plan to close a 2-mile portion of I- 65 in Indiana (from I-70/I-65 south split interchange to I-70/I-65 north split interchange) for a period of 93 days, from Wednesday, August 21, 2013, to Thursday, November 21, 2013. The closure is requested to accommodate the reconstruction on the Virginia Avenue Bridge, which consists of replacing the northbound and southbound bridge girders and lowering the pavement section from south of Morris Street to north of Fletcher Avenue. The request is based on the provisions in 23 CFR 658.11 which authorizes the deletion of segments of the federally designated routes that make up the National Network designated in Appendix A of 23 CFR Part 658 upon approval by the FHWA. The FHWA seeks comments from the general public on this request submitted by INDOT for a deletion in accordance with 23 CFR 658.11(d) for the considerations discussed in this notice.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.