Federal Highway Administration July 30, 2013 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Notice of Final Federal Agency Actions on Transportation Project in Washington State
This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the State Route 167 Puyallup to SR 509, Puyallup River Bridge Replacement Project, located in the City of Puyallup (Milepost [MP] 6.40) in Pierce County, Washington. The action by FHWA is the Record of Decision (ROD), which selects a new bridge and roadway alignment for southbound traffic, which will accommodate the future SR 167 Extension interchange and removes the existing steel truss as a last order of work. Actions by other Federal agencies include issuing permits.
National Tunnel Inspection Standards
The FHWA is proposing the National Tunnel Inspection Standards (NTIS) for highway tunnels. The FHWA previously proposed the NTIS in a notice of proposed rulemaking (NPRM) published in the Federal Register on July 22, 2010. On July 6, 2012, the President signed the Moving Ahead for Progress in the 21st Century Act (MAP-21), which requires the Secretary to establish national standards for tunnel inspections. The MAP-21 requires that NTIS contain a number of provisions that were not included in the proposal set forth in the earlier NPRM. As a result, FHWA is issuing this SNPRM to request comment on a revised NTIS proposal that incorporates the provisions required by MAP-21. This SNPRM proposes requirements for tunnel owners, including the establishment of a program for the inspection of highway tunnels, maintenance of a tunnel inventory, reporting of the inspection findings to FHWA, and correction of any critical findings identified during these inspections.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.