Federal Aviation Administration June 27, 2012 – Federal Register Recent Federal Regulation Documents
Results 1 - 6 of 6
Proposed Amendment of Class E Airspace; Lewistown, MT
This action proposes to modify Class E airspace at Lewistown Municipal Airport, Lewistown, MT. Controlled airspace is necessary to accommodate aircraft using Area Navigation (RNAV) Global Positioning System (GPS) standard instrument approach procedures at Lewistown Municipal Airport, Lewistown, MT. The FAA is proposing this action to enhance the safety and management of aircraft operations at the airport.
Advisory Circular (AC) 150/5345-53D, Airport Lighting Equipment Certification Program; Proposed Update and Opportunity to Comment
The FAA proposes to replace AC150/5345-53C with AC150/5345-53D to clarify the criteria under the Airport Lighting Equipment Certification Program (ALECP) for acceptance of an organization as a third party certification body (third party certifier) and how manufacturers may get equipment qualified under the program. The Secretary of Transportation is providing notice in the Federal Register of, and an opportunity for public comment on AC150/5345-53D, Airport Lighting Equipment Certification Program.
Notice of Availability of the Final Environmental Impact Statement (FEIS) for the Taos Regional Airport Layout Plan Improvements, Taos, NM
The FAA is issuing this Notice to advise the public that it has prepared a Final Environmental Impact Statement (FEIS) for a proposed new runway and associated facilities and improvements at the Taos Regional Airport, Taos, New Mexico. The FEIS reflects the Section 106 consultations between the FAA, the Taos Pueblo, Town of Taos, National Park Service, Advisory Council on Historic Preservation, New Mexico State Historic Preservation Officer (SHPO), and the New Mexico Department of Transportation regarding adverse effects on the Taos Pueblo World Heritage Site and other traditional cultural properties within the National Register Eligible Historic District associated with the Taos Pueblo. The FEIS also includes floodplain impact evaluations. The FAA is seeking comments on those sections of the FEIS that have been updated and/or contain information that has become available since the release of the DEIS. Please see the SUPPLEMENTARY INFORMATION section below for more information. The FAA is providing a thirty day (30) day FEIS review period. The FEIS review period begins on the date of the publication of this Notice of Availability in the Federal Register, and will close on July 30, 2012. The FAA must receive written comments on these subsections postmarked no later than July 30, 2012. Comments received after that date may not be considered by the FAA. All comments on the FEIS are to be submitted to Mr. Dean McMath of the FAA, at the address shown in the section below entitled, ``For Further Information or to Submit Comments''.
Proposed Amendment of Class D and Class E Airspace; Bozeman, MT
This action proposes to modify Class D and Class E airspace at Bozeman Yellowstone International Airport, Bozeman, MT. This action would align two Class E airspace areas with the Class D airspace area. This action would also update the airport name to Bozeman Yellowstone International Airport. This action would enhance the safety and management of aircraft operations at the airport.
Airworthiness Directives; Saab AB, Saab Aerosystems Airplanes
We propose to adopt a new airworthiness directive (AD) for certain Saab AB, Saab Aerosystems Model 340A (SAAB/SF340A) and SAAB 340B airplanes. This proposed AD was prompted by reports of stall events during icing conditions which were not accompanied with a prior stall warning. This proposed AD would require replacing the stall warning computer (SWC) with a new SWC, and modifying the airplane for the replacement of the SWC. We are proposing this AD to prevent natural stall events when operating in icing conditions, which if not corrected may result in loss of control of the airplane.
Request for Public Comment, Raleigh County Memorial Airport, Beckley, WV
The Federal Aviation Administration is requesting public comment on the proposed release of 549.63 acres of land currently owned by the Raleigh County Commission, Sponsor for the Raleigh County Memorial Airport, Beckley, West Virginia. The parcel is located off the northwest end of the airport and descends in to ``Fat Creek Gorge'' to a depth in excess of 600ft below the airport elevation and has no aeronautical benefit. The land is dormant, no infrastructure exists and land has no practical use. Due to terrain, no future development opportunities exist for the airport. Once released, the land will be sold and placed in a Conservation Easement, with restriction of no future development. Proposed buyer would be placing the area of request in a conservation easement for wildlife enhancement, with no adverse impact to the airport. Land will remain as compatible use to the airport. Land will be sold as surface rights only, no conveyance of mineral rights. The airport land being released is not needed for airport development as shown on the Airport Layout Plan. Fair Market Value has been determined based upon an appraisal of the Property.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.