Reclamation Bureau – Federal Register Recent Federal Regulation Documents
Results 51 - 100 of 372
Glen Canyon Dam Adaptive Management Work Group (AMWG)
The Glen Canyon Dam Adaptive Management Program (AMP) was implemented as a result of the Record of Decision on the Operation of Glen Canyon Dam Final Environmental Impact Statement to comply with consultation requirements of the Grand Canyon Protection Act (Pub. L. 102-575) of 1992. The AMP includes a Federal advisory committee (AMWG), a technical work group (TWG), a monitoring and research center, and independent review panels. The AMWG makes recommendations to the Secretary of the Interior concerning Glen Canyon Dam operations and other management actions to protect resources downstream of Glen Canyon Dam consistent with the Grand Canyon Protection Act. The TWG is a subcommittee of the AMWG and provides technical advice and recommendations to the AMWG.
Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract
The Bureau of Reclamation will be initiating negotiations with the Westlands Water District (District) of California to negotiate and execute a long term repayment contract to provide for the terms and conditions for reimbursement of costs related to the construction of drainage facilities within the District. This action is being undertaken to satisfy the federal government obligation to provide drainage service to the District located within the San Luis Unit of the Central Valley Project in California.
Request for Small Reclamation Projects Act Loan To Construct Narrows Dam in Sanpete County, UT
The Bureau of Reclamation (Reclamation), in cooperation with the U.S. Forest Service and the U.S. Army Corps of Engineers, has prepared and made available to the public a SDEIS pursuant to Section 102(2)(c) of the National Environmental Policy Act of 1969 (NEPA), as amended, 42 U.S.C. 4332.
Los Vaqueros Reservoir Expansion, Contra Costa and Alameda Counties, CA
The Bureau of Reclamation, as the National Environmental Policy Act Federal lead agency, and the Contra Costa Water District, as the California Environmental Quality Act lead agency, have prepared the Los Vaqueros Reservoir Expansion Final EIS/EIR. Los Vaqueros Expansion is a proposed action in the August 2000 CALFED Bay-Delta Program Programmatic Record of Decision. The Final EIS/EIR evaluated two options for expanding Los Vaqueros Reservoir from its existing capacity of 100 thousand acre-feet (TAF). A 175 TAF expansion option would expand the reservoir to 275 TAF. This expansion option would be operated for environmental water management and San Francisco Bay Area water supply reliability. A 60 TAF expansion option would expand the reservoir to 160 TAF. This second option would primarily be operated to improve Contra Costa Water District (CCWD) dry year water supply reliability and water quality.
Yakima River Basin Conservation Advisory Group Charter Renewal; Notice of Charter Renewal
This notice is published in accordance with section 9(a)(2) of the Federal Advisory Committee Act of 1972 (Pub. L. 92-463). Following consultation with the General Services Administration, notice is hereby given that the Secretary of the Interior is renewing the charter for the Yakima River Basin Conservation Advisory Group (CAG). The purpose of the CAG is to provide recommendations to the Secretary of the Interior and the State of Washington on the structure and implementation of the Yakima River Basin Water Conservation Program. In consultation with the State, the Yakama Nation, Yakima River basin irrigators, and other interested and related parties, six members are appointed to serve on the CAG.
Bunker Hill Groundwater Basin, Riverside-Corona Feeder Project, San Bernardino and Riverside Counties, CA
Pursuant to the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA), the Bureau of Reclamation and the Western Municipal Water District (Western) will prepare a joint EIS/EIR for the proposed Riverside-Corona Feeder Project. The public and agencies are invited to comment on the scope of the EIS/EIR and the proposed alternatives.
Change in Discount Rate for Water Resources Planning
The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate for Federal water resources planning for fiscal year 2010 is 4.375 percent. Discounting is to be used to convert future monetary values to present values.
New Melones Lake Area Resource Management Plan, Tuolumne and Calaveras Counties, CA
Pursuant to the National Environmental Policy Act of 1969 (as amended), the Bureau of Reclamation (Reclamation) has made available for public review a Final RMP/EIS for the New Melones Lake Area. The Final RMP/EIS describes and presents the environmental effects of four alternatives, including no action, for future use of the project area for recreation and resource protection and management.
Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas County, WA INT-DES 10-03
The Bureau of Reclamation (Reclamation) published a notice in the Federal Register on April 8, 2009 (74 FR 16007) announcing the commencement of work under the National Environmental Policy Act (NEPA) on the Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project. The Washington State Department of Ecology is a joint lead with Reclamation in the preparation of the Draft EIS, in coordination with the Washington Department of Fish and Wildlife and the Yakama Nation. The Bonneville Power Administration has assumed the role of a cooperating agency in the preparation of the Draft EIS. The Draft EIS will also be used to comply with requirements of the Washington State Environmental Policy Act.
Folsom Lake State Recreation Area and Folsom Power House State Historic Park General Plan/Resource Management Plan
Pursuant to the National Environmental Policy Act (NEPA) of 1969 (as amended) and the California Environmental Quality Act (CEQA), the Bureau of Reclamation (Reclamation) and the California Department of Parks and Recreation (State Parks) as lead agencies have made available for public review and comment a joint Final EIS/EIR for the Folsom Lake State Recreation Area and Folsom Power House State Historic Park General Plan/Resource Management Plan (GP/RMP). The GP/RMP involves alternatives for future use of the project area for recreation and resource protection and management.
Pick-Sloan Missouri Basin Program, Eastern and Western Division Proposed Project Use Power Rate
The Bureau of Reclamation (Reclamation) is proposing a rate adjustment (proposed rate) for Project Use Power for the Pick-Sloan Missouri Basin Program (P-SMBP), Eastern and Western Divisions. The proposed rate for Project Use Power is to recover all annual operating, maintenance, and replacement expenses. The analysis of the proposed Project Use Power Rate is included in a booklet available upon request. The proposed rate for Project Use Power will become effective February 19, 2010.
Cancellation of the South Valley Facilities Expansion Project-Clark County, NV
The Bureau of Reclamation, together with the Bureau of Land Management (BLM) and the National Park Service (NPS) as cooperating agencies are cancelling the Notice of Intent (NOI) to prepare an Environmental Impact Statement (EIS) for the South Valley Facilities Expansion (SVFE) Project, published in the Federal Register on April 18, 2008 (73 FR 21155).
Glen Canyon Dam Adaptive Management Work Group (AMWG)
The Glen Canyon Dam Adaptive Management Program (AMP) was implemented as a result of the Record of Decision on the Operation of Glen Canyon Dam Final Environmental Impact Statement to comply with consultation requirements of the Grand Canyon Protection Act (Pub. L. 102-575) of 1992. The AMP includes a Federal advisory committee, the Adaptive Management Work Group (AMWG), a Technical Work Group (TWG), a Grand Canyon Monitoring and Research Center, and independent review panels. The AMWG makes recommendations to the Secretary of the Interior concerning Glen Canyon Dam operations and other management actions to protect resources downstream of Glen Canyon Dam consistent with the Grand Canyon Protection Act. The TWG is a subcommittee of the AMWG and provides technical advice and recommendations to the AMWG.
Glen Canyon Dam Adaptive Management Program
On December 10, 2009, Secretary of the Interior Ken Salazar announced that the Department of the Interior (Department) would initiate development of a High-Flow Experimental Protocol (Protocol) for releases from Glen Canyon Dam as part of the ongoing implementation of the Glen Canyon Dam Adaptive Management Program (AMP). High-flow experimental releases have been undertaken in the past and will be further analyzed and implemented pursuant to the direction of the Secretary to assess the ability of such releases to protect, mitigate adverse impacts to, and improve the values for which Grand Canyon National Park and Glen Canyon National Recreation Area were established. As part of the AMP, the Department's effort to develop the Protocol is a component of its efforts to comply with the requirements and obligations established by the Grand Canyon Protection Act of 1992 (Pub. L. 102-575) (GCPA).
Equus Beds Aquifer Storage Recharge and Recovery Project, Equus Beds Division, Wichita Project, Kansas
Pursuant to the National Environmental Policy Act of 1969 (NEPA), the Bureau of Reclamation (Reclamation) has completed the Final EIS for the Equus Beds Aquifer Storage Recharge and Recovery Project. The City of Wichita, Kansas designed the water project to restore and conserve the Equus Beds aquifer while developing water supplies for its future needs. Federal funding assistance for this project has been authorized by the U.S. Congress under the Wichita Project Equus Beds Division Authorization Act of 2005 (Pub. L. 109-299). The Federal action under NEPA involves Reclamation, acting through the Secretary of the Interior, reimbursing the City of Wichita for construction costs
Mormon Island Auxiliary Dam (MIAD) Modification Project, Sacramento and El Dorado Counties, CA
Pursuant to the National Environmental Policy Act and the California Environmental Quality Act, the Bureau of Reclamation (Reclamation), the lead Federal agency and the Sacramento Area Flood Control Agency (SAFCA), the CEQA lead agency, have made available for public review and comment a Draft Supplemental EIS/EIR for the MIAD Modification Project.
Delta-Mendota Canal/California Aqueduct Intertie, Alameda County, CA
The Bureau of Reclamation, as the National Environmental Policy Act Federal lead agency, has prepared the Delta-Mendota Canal/ California Aqueduct Intertie (Intertie) Final EIS. The Intertie is a proposed action in the August 2000 CALFED Bay-Delta Program Programmatic Record of Decision. The Intertie Final EIS evaluates constructing and operating a pipeline connecting the Delta-Mendota Canal (DMC) and the California Aqueduct. The purpose of the Proposed Action is to improve the DMC conveyance conditions that restrict the Central Valley Project's (CVP) Jones Pumping Plant to less than its authorized pumping capacity of 4,600 cubic feet per second.
Contra Loma Reservoir and Recreation Area, Resource Management Plan/Environmental Impact Statement, Antioch, CA-Central Valley Project
The Bureau of Reclamation (Reclamation) is preparing a RMP/EIS for Contra Loma Reservoir and Recreation Area to establish uniform policy and land management guidelines that promote an organized use, development, and management of the Contra Loma Reservoir and the surrounding recreational area lands. The RMP/EIS shall be prepared to meet all Federal and Reclamation standards. These standards include consideration of appropriate Federal, state, and local laws and ordinances including the National Environmental Policy Act, the Endangered Species Act, the Clean Water Act, the Clean Air Act, the National Historic Preservation Act, the Federal Water Project Recreation Act, and the Reclamation Recreation Management Act, as applicable. Reclamation will conduct a workshop for the benefit of the various Stakeholders. The purpose of the workshop is to provide the Stakeholders information relative to Reclamation uniform policies, including land management guidelines that promote use, management, and development, of the Contra Loma Reservoir and the surrounding recreational area lands. A public scoping meeting will be announced at a later date for the purpose of soliciting input on the alternatives,
Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Negotiations
Notice is hereby given of contractual actions that have been proposed to the Bureau of Reclamation and are new, modified, discontinued, or completed since the last publication of this notice on August 4, 2009. This notice is one of a variety of means used to inform the public about proposed contractual actions for capital recovery and management of project resources and facilities consistent with section 9(f) of the Reclamation Project Act of 1939. Additional announcements of individual contract actions may be published in the Federal Register and in newspapers of general circulation in the areas determined by Reclamation to be affected by the proposed action.
New Melones Lake Area Resource Management Plan, Tuolumne and Calaveras Counties, CA
Pursuant to the National Environmental Policy Act of 1969 (as amended), the Bureau of Reclamation (Reclamation) has made available for public review and comment a Draft RMP/EIS for the New Melones Lake Area. The Draft RMP/EIS describes and presents the environmental effects of four alternatives, including no action, for future use of the project area for recreation and resource protection and management. The purpose of the public meetings is to provide the public with an
Colorado River Basin Salinity Control Advisory Council
The Colorado River Basin Salinity Control Advisory Council (Council) was established by the Colorado River Basin Salinity Control Act of 1974 (Public Law 93-320) (Act) to receive reports and advise federal agencies on implementing the Act. In accordance with the Federal Advisory Committee Act, the Bureau of Reclamation announces that the Council will meet as detailed below.
Grassland Bypass Project, Merced and Fresno Counties, CA
Pursuant to the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA), the Bureau of Reclamation (Reclamation), the Federal lead agency, and the San Luis & Delta-Mendota Water Authority (Authority), the State lead agency, have prepared a Final Environmental Impact Statement (EIS) and a Final Environmental Impact Report (EIR) for the continuation of the Grassland Bypass Project until December 31, 2019 (Project). Reclamation proposes to enter a Use Agreement with the Authority for the continued use of a portion of the San Luis Drain after 2009 to convey subsurface agricultural irrigation water to Mud Slough (North). The Central Valley Regional Water Quality Control Board would need to revise their Basin Plan Amendment to delay compliance with selenium objectives for 2010 and amend the existing Waste Discharge Requirements for the Project in order to allow for anticipated drainage discharge into Mud Slough, and the Authority and the California Department of Fish and Game will need to amend their existing Memorandum of Understanding for the portion of Mud Slough North in the State's China Island Wildlife Area. Reclamation and the Authority would need to remove existing and future sediments from the affected portion of the San Luis Drain.
Walker River Basin Acquisition Program Draft Environmental Impact Statement (EIS), Nevada
The Bureau of Reclamation is reopening the comment period for the DEIS to Monday, October 5, 2009. The notice of availability of the DEIS was published in the Federal Register on July 24, 2009 (74 FR 36737). The public review period ended on September 14, 2009.
Central Valley Project Improvement Act, Water Management Plans
The following Water Management Plans are available for review:
B.F. Sisk Dam Corrective Action Project, Merced County, CA
The Bureau of Reclamation (Reclamation), as the lead federal agency, and the State of California Department of Water Resources (DWR), as the lead state agency, are preparing a joint EIS/EIR, pursuant to the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA), respectively, for the B.F. Sisk Dam Corrective Action Project (proposed action). The purpose of the proposed action is to improve public safety by modifying B.F. Sisk Dam to mitigate potential safety concerns identified in the ongoing Corrective Action Study (CAS). Engineering and economic studies are currently being conducted by Reclamation and DWR to determine
Reach 4B, Eastside Bypass and Mariposa Bypass Low Flow Channel and Structural Improvements Project Under the San Joaquin River Restoration Program, Merced County, California
The Bureau of Reclamation and the California Department of Water Resources (DWR) are proposing to prepare a joint EIS/EIR, pursuant to the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA), to evaluate effects of the proposed Reach 4B, Eastside Bypass and Mariposa Bypass Low Flow Channel and Structural Improvements Project (Proposed Action) under the San Joaquin River Restoration Program (SJRRP or Program). The Proposed Action includes the construction, operation, and maintenance of a low flow channel in Reach 4B of the San Joaquin River and in the Eastside and Mariposa bypasses and improvements to facilities in the Eastside and Mariposa bypasses to allow for fish passage. The purpose of the Proposed Action is to comply with the San Joaquin River Settlement by improving conveyance capacity in Reach 4B of the San Joaquin River to ensure conveyance of at least 475 cubic feet per second (cfs), modifying the Eastside and Mariposa bypass channels to establish a low flow channel, and modifying structures in the Eastside and Mariposa bypasses to provide for fish passage. The Proposed Action is a component of the San Joaquin River Settlement.
Agency Information Collection; Activities Under OMB Review; Comment Request
In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), the Bureau of Reclamation (Reclamation) has forwarded the following Information Collection Request (ICR) to the Office of Management and Budget (OMB) for review and approval: Diversions, Return Flows, and Consumptive Use of Colorado River Water in the Lower Colorado River Basin, OMB Control Number: 1006-0015. The ICR describes the nature of the information collection and its expected cost and burden.
Proposed Water Service Contract, El Dorado County Water Agency, El Dorado County, CA
Pursuant to the National Environmental Policy Act and the California Environmental Quality Act, the Bureau of Reclamation (Reclamation) and the El Dorado County Water Agency (EDCWA) as lead agencies have made available for public review and comment a joint Draft EIS/EIR for a Proposed Water Service Contract pursuant to Public Law 101-514. The Draft EIS/EIR describes and presents the environmental effects of four alternatives, including no action, of entering into a long-term Central Valley Project (CVP) water service contract with EDCWA.
Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Negotiations
Notice is hereby given of contractual actions that have been proposed to the Bureau of Reclamation and are new, modified, discontinued, or completed since the last publication of this notice on June 24, 2009. This notice is one of a variety of means used to inform the public about proposed contractual actions for capital recovery and management of project resources and facilities consistent with section 9(f) of the Reclamation Project Act of 1939. Additional announcements of individual contract actions may be published in the Federal Register and in newspapers of general circulation in the areas determined by Reclamation to be affected by the proposed action.
Madera Irrigation District Water Supply Enhancement Project
The Bureau of Reclamation (Reclamation) has made available for public review and comment the Draft EIS for the Madera Irrigation District Water Supply Enhancement Project (MID WSEP). Reclamation proposes to approve the banking of up to 55,000 acre-feet per year of Central Valley Project (CVP) water outside the MID service area and the alteration of Reclamation-owned facilities. The total banking capacity of the MID WSEP is 250,000 acre-feet.
Walker River Basin Acquisition Program
The Bureau of Reclamation (Reclamation) has made available for public review and comment the Draft EIS for the Walker River Basin Acquisition Program. (Acquisition Program). Reclamation is directed in Public Law 109-103 to provide $70 million in funding to the University of Nevada to implement a program for environmental restoration in the Walker River Basin. The law directs that the funds be used by the University to acquire from willing sellers land, water appurtenant to the land, and related interests in the Walker River Basin, Nevada. Acquired water rights would be transferred to provide water to Walker Lake. The funding is also for the University to establish and operate an agricultural and natural resources center.
Glen Canyon Dam Adaptive Management Work Group (AMWG)
The Glen Canyon Dam Adaptive Management Program (AMP) was implemented as a result of the Record of Decision on the Operation of Glen Canyon Dam Final Environmental Impact Statement to comply with consultation requirements of the Grand Canyon Protection Act (Pub. L. 102-575) of 1992. The AMP includes a federal advisory committee, the Adaptive Management Work Group (AMWG), a technical work group (TWG), a Grand Canyon Monitoring and Research Center, and independent review panels. The AMWG makes recommendations to the Secretary of the Interior concerning Glen Canyon Dam operations and other management actions to protect resources downstream of Glen Canyon Dam consistent with the Grand Canyon Protection Act. The TWG is a subcommittee of the AMWG and provides technical advice and recommendations to the AMWG.
Agency Information Collection; Activities Under OMB Review; Comment Request
In accordance with the Paperwork Reduction Act of 1995, the Bureau of Reclamation (Reclamation) has forwarded the following Information Collection Request (ICR) to the Office of Management and Budget (OMB) for review and approval: Recreation Use Data Report, OMB Control Number: 1006-0002. As part of its continuing effort to reduce paperwork and respondent burdens, Reclamation invites other Federal agencies, State, local, or tribal governments which manage recreation sites at Reclamation projects; concessionaires, sub-concessionaires, and not-for-profit organizations who operate concessions on Reclamation lands; and the public, to comment on this information collection.
Glen Canyon Dam Adaptive Management Work Group (AMWG)
The Glen Canyon Dam Adaptive Management Program (AMP) was implemented as a result of the Record of Decision on the Operation of Glen Canyon Dam Final Environmental Impact Statement to comply with consultation requirements of the Grand Canyon Protection Act (Pub. L. 102-575) of 1992. The AMP includes a federal advisory committee, the Adaptive Management Work Group (AMWG), a technical work group (TWG), a Grand Canyon Monitoring and Research Center, and independent review panels. The AMWG makes recommendations to the Secretary of the Interior concerning Glen Canyon Dam operations and other management actions to protect resources downstream of Glen Canyon Dam consistent with the Grand Canyon Protection Act. The TWG is a subcommittee of the AMWG and provides technical advice and recommendations to the AMWG.
Delta-Mendota Canal/California Aqueduct Intertie, Alameda County, CA
The Bureau of Reclamation, as the National Environmental Policy Act Federal lead agency, has made available for public review and comment the Delta-Mendota Canal/California Aqueduct Intertie (Intertie) Draft EIS. The Intertie is a proposed action in the August 2000 CALFED Bay-Delta Program Programmatic Record of Decision. The Intertie Draft EIS evaluates constructing and operating a pipeline connecting the Delta-Mendota Canal (DMC) and the California Aqueduct. The purpose of the Proposed Action is to improve the DMC conveyance conditions that restrict the CVP Jones Pumping Plant to less than its authorized pumping capacity of 4,600 cubic feet per second. The Draft EIS describes and presents the environmental effects of the No-Action Alternative and three action alternatives. Two public hearings will be held to receive comments from agencies, individuals, and organizations on the Draft EIS.
Navajo-Gallup Water Supply Project, New Mexico
Pursuant to the National Environmental Policy Act of 1969 (as amended), Public Law (Pub. L.) 92-199, and the general authority to conduct water resources planning under the Reclamation Act of 1902 and all acts amendatory thereof and supplementary thereto, the Bureau of Reclamation (Reclamation), in cooperation with the Navajo Nation, Jicarilla Apache Nation, City of Gallup, State of New Mexico, Bureau of Indian Affairs, Indian Heath Service, Navajo Tribal Utility Authority, and Northwest New Mexico Council of Governments, has prepared and made available to the public a Planning Report and Final Environmental Impact Statement (PR/FEIS). This document was undertaken to provide a discussion for the (1) Various ways to provide a municipal and industrial (M&I) water supply to the Navajo Nation, City of Gallup, and Jicarilla Apache Nation; (2) identification of a preferred alternative; and (3) associated environmental impacts and costs of the No Action and two action alternatives.
Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Negotiations
Notice is hereby given of contractual actions that have been proposed to the Bureau of Reclamation and are new, modified, discontinued, or completed since the last publication of this notice on April 10, 2009. This notice is one of a variety of means used to inform the public about proposed contractual actions for capital recovery and management of project resources and facilities consistent with section 9(f) of the Reclamation Project Act of 1939. In addition, notice is hereby given of contractual actions for extraordinary maintenance and replacement pursuant to the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5). Additional announcements of individual contract actions may be published in the Federal Register and in newspapers of general circulation in the areas determined by Reclamation to be affected by the proposed action.
Agency Information Collection; Activities Under OMB Review; Comment Request
In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.), this notice announces the Bureau of Reclamation (we, our, or us) has forwarded the following Information Collection Request (ICR) to the Office of Management and Budget (OMB) for review and approval: Forms to Determine Compliance by Certain Landholders, 43 CFR part 426, OMB Control Number: 1006-0023.
Agency Information Collection; Activities Under OMB Review; Comment Request
In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.), this notice announces the Bureau of Reclamation (we, our, or us) has forwarded the following Information Collection Request (ICR) to the Office of Management and Budget (OMB) for review and approval: Certification Summary Form, Reporting Summary Form for Acreage Limitation, 43 CFR part 426 and 43 CFR part 428, OMB Control Number: 1006-0006. This ICR is required under the Reclamation Reform Act of 1982 (RRA), Acreage Limitation Rules and Regulations, 43 CFR part 426, and Information Requirements for Certain Farm Operations In Excess of 960 Acres and the Eligibility of Certain Formerly Excess Land, 43 CFR part 428. The ICR describes the nature of the information collection and its expected cost and burden.
Agency Information Collection; Activities Under OMB Review; Comment Request
In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.), this notice announces the Bureau of Reclamation (we, our, or us) has forwarded the following Information Collection Request (ICR) to the Office of Management and Budget (OMB) for review and approval: Individual Landholder's and Farm Operator's Certification and Reporting Forms for Acreage Limitation, 43 CFR part 426 and 43 CFR part 428, OMB Control Number: 1006-0005. This ICR is required under the Reclamation Reform Act of 1982 (RRA), Acreage Limitation Rules and Regulations, 43 CFR part 426, and Information Requirements for Certain Farm Operations In Excess of 960 Acres and the Eligibility of Certain Formerly Excess Land, 43 CFR part 428. The ICR describes the nature of the information collection and its expected cost and burden.
Agency Information Collection; Activities Under OMB Review; Comment Request
In accordance with the Paperwork Reduction Act of 1995, the Bureau of Reclamation (Reclamation, we) has forwarded the following Information Collection Request (ICR) to the Office of Management and Budget (OMB) for review and approval: Rural Water Supply Act, OMB Control Number: 1006-0029. Title 43 CFR part 404 requires entities interested in participating in the Rural Water Supply Program (Rural Water Program) to submit information to allow Reclamation to evaluate and prioritize requests for financial or technical assistance.
North Bay Water Recycling Program (formerly North San Pablo Bay Restoration and Reuse Project), California
The Bureau of Reclamation (Reclamation), as the National Environmental Policy Act Federal lead agency, and the Sonoma County Water Agency, acting as administrator for the North Bay Water Reuse Authority (NBWRA) and the California Environmental Quality Act State lead agency, have made available for public review and comment the North Bay Water Recycling Program Draft EIS/EIR. The purpose of the project is to create a regional wastewater reuse project to provide recycled water for agricultural, urban, and environmental uses as an alternative to discharging treated wastewater to San Pablo Bay. In this way, water demand issues and wastewater discharge issues of the region
Agency Information Collection; Request for Extension of a Currently Approved Information Collection; Comment Request
In accordance with the Paperwork Reduction Act of 1995, this notice announces the intentions of the Bureau of Reclamation to seek extension of the information collection for OMB 1006-0015, Diversions, Return Flow, and Consumptive Use of Colorado River Water in the Lower Colorado River Basin. The current OMB approval expires on August 31, 2009.
Change of Use for the Oak Shores Recreation Area at Lake Berryessa, Napa County, CA
The Bureau of Reclamation's Central California Area Office (CCAO) at Lake Berryessa will temporarily change public use at Oak Shores Day Use Area. After 50 years, concession contracts have expired and recreational opportunities provided at four closed resorts are no longer available. Until such time as new contracts can be awarded, Reclamation will provide a change from day use to overnight camping at this area. The North End of Oak Shores will be converted from day use only to overnight camping with up to 100 sites. Camping will be considered semi-primitive and will provide potable water spigots, restroom facilities, fire rings, picnic tables and some shade shelters. This change in use will serve to enhance public safety, provide additional public recreational services while providing for and protection of cultural and natural resources.
Colorado River Basin Salinity Control Advisory Council
The Colorado River Basin Salinity Control Advisory Council (Council) was established by the Colorado River Basin Salinity Control Act of 1974 (Pub. L. 93-320) (Act) to receive reports and advise Federal agencies on implementing the Act. In accordance with the Federal Advisory Committee Act, the Bureau of Reclamation announces that the Council will meet as detailed below.
Glen Canyon Dam Adaptive Management Work Group (AMWG)
The Adaptive Management Program (AMP) was implemented as a result of the Record of Decision on the Operation of Glen Canyon Dam Final Environmental Impact Statement to comply with consultation requirements of the Grand Canyon Protection Act (Pub. L. 102-575) of 1992. The AMP includes a federal advisory committee (AMWG), a technical work group (TWG), a monitoring and research center, and independent review panels. The AMWG makes recommendations to the Secretary of the Interior concerning Glen Canyon Dam operations and other management actions to protect resources downstream of Glen Canyon Dam consistent with the Grand Canyon Protection Act. The TWG is a subcommittee of the AMWG and provides technical advice and recommendations to the AMWG.
Cle Elum Dam Fish Passage Facilities and Fish Re-Introduction Project; Kittitas County, WA
Pursuant to section 102(2)(C) of the National Environmental Policy Act of 1969, as amended, the Bureau of Reclamation (Reclamation) proposes to prepare an Environmental Impact Statement (EIS) on the Cle Elum Dam Fish Passage Facilities and Fish Re-Introduction Project. The Washington State Department of Ecology (Ecology) will be a joint lead with Reclamation in the preparation of this EIS, which will also be used to comply with requirements of the Washington State Environmental Policy Act (SEPA).
Nimbus Hatchery Fish Passage Project, Lower American River, California
Pursuant to the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA), the Bureau of Reclamation (Reclamation), the lead Federal agency, and the California Department of Fish and Game (CDFG), acting as the lead State agency, will prepare a joint EIS/EIR for the proposed Nimbus Fish Hatchery Weir Replacement Project (Project). The purpose of the Project is to create and maintain a reliable system of collecting adult fish for use in the Nimbus Fish Hatchery (Hatchery).
Central Valley Project Improvement Act, Water Management Plans.
The following Water Management Plans are available for review: Banta-Carbona Irrigation District Fresno Irrigation District Westlands Water District To meet the requirements of the Central Valley Project Improvement Act of 1992 (CVPIA) and the Reclamation Reform Act of 1982, the Bureau of Reclamation (Reclamation) developed and published the Criteria for Evaluating Water Management Plans (Criteria). For the purpose of this announcement, Water Management Plans (Plans) are considered the same as Water Conservation Plans. The above entities have developed a Plan, which Reclamation has evaluated and preliminarily determined to meet the requirements of these Criteria. Reclamation is publishing this notice in order to allow the public to review the plans and comment on the preliminary determinations. Public comment on Reclamation's preliminary (i.e., draft) determination is invited at this time.
Agency Information Collection; Proposed Revisions to a Currently Approved Information Collection; Comment Request
In accordance with the Paperwork Reduction Act of 1995, the Bureau of Reclamation (Reclamation, we) intends to submit a request for renewal (with revisions) of an existing approved information collection to the Office of Management and Budget (OMB): Recreation Use Data Report, OMB Control Number 1006-0002. As part of its continuing effort to reduce paperwork and respondent burdens, Reclamation invites State and local governmental entities that manage recreation sites at Reclamation projects; concessionaires, subconcessionaires, and not-for- profit organizations who operate concessions on Reclamation lands; and the general public, to comment on this information collection.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.