Central Valley Project Improvement Act, Water Management Plans., 11748 [E9-5992]
Download as PDF
11748
Federal Register / Vol. 74, No. 52 / Thursday, March 19, 2009 / Notices
DEPARTMENT OF THE INTERIOR
Bureau of Reclamation
Central Valley Project Improvement
Act, Water Management Plans.
sroberts on PROD1PC70 with NOTICES
AGENCY: Bureau of Reclamation,
Interior.
ACTION: Notice of Availability.
SUMMARY: The following Water
Management Plans are available for
review:
• Banta-Carbona Irrigation District
• Fresno Irrigation District
• Westlands Water District
To meet the requirements of the
Central Valley Project Improvement Act
of 1992 (CVPIA) and the Reclamation
Reform Act of 1982, the Bureau of
Reclamation (Reclamation) developed
and published the Criteria for
Evaluating Water Management Plans
(Criteria). For the purpose of this
announcement, Water Management
Plans (Plans) are considered the same as
Water Conservation Plans. The above
entities have developed a Plan, which
Reclamation has evaluated and
preliminarily determined to meet the
requirements of these Criteria.
Reclamation is publishing this notice in
order to allow the public to review the
plans and comment on the preliminary
determinations. Public comment on
Reclamation’s preliminary (i.e., draft)
determination is invited at this time.
DATES: All public comments must be
received by April 20, 2009.
ADDRESSES: Please mail comments to
Ms. Laurie Sharp, Bureau of
Reclamation, 2800 Cottage Way,
Sacramento, California, 95825, or
contact at 916–978–5232 (TDD 978–
5608), or e-mail at lsharp@mp.usbr.gov.
FOR FURTHER INFORMATION CONTACT: To
be placed on a mailing list for any
subsequent information, please contact
Ms. Laurie Sharp at the e-mail address
or telephone number above.
SUPPLEMENTARY INFORMATION: We are
inviting the public to comment on our
preliminary (i.e., draft) determination of
Plan adequacy. Section 3405(e) of the
CVPIA (Title 34 Public Law 102–575),
requires the Secretary of the Interior to
establish and administer an office on
Central Valley Project water
conservation best management practices
that shall ‘‘* * * develop criteria for
evaluating the adequacy of all water
conservation plans developed by project
contractors, including those plans
required by section 210 of the
Reclamation Reform Act of 1982.’’ Also,
according to Section 3405(e)(1), these
criteria must be developed ‘‘* * * with
the purpose of promoting the highest
VerDate Nov<24>2008
17:17 Mar 18, 2009
Jkt 217001
level of water use efficiency reasonably
achievable by project contractors using
best available cost-effective technology
and best management practices.’’ These
criteria state that all parties
(Contractors) that contract with
Reclamation for water supplies
(municipal and industrial contracts over
2,000 acre-feet and agricultural
contracts over 2,000 irrigable acres)
must prepare Plans that contain the
following information:
1. Description of the District.
2. Inventory of Water Resources.
3. Best Management Practices (BMPs)
for Agricultural Contractors.
4. BMPs for Urban Contractors.
5. Plan Implementation.
6. Exemption Process.
7. Regional Criteria.
8. Five-Year Revisions.
Reclamation will evaluate Plans based
on these criteria. A copy of these Plans
will be available for review at
Reclamation’s Mid-Pacific (MP)
Regional Office located in Sacramento,
California, and the local area office. Our
practice is to make comments, including
names and home addresses of
respondents, available for public
review.
Before including your name, address,
phone number, e-mail address, or other
personal identifying information in your
comment, you should be aware that
your entire comment—including your
personal identifying information—may
be made publicly available at any time.
While you can ask us in your comment
to withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
If you wish to review a copy of these
Plans, please contact Ms. Laurie Sharp
to find the office nearest you.
Dated: February 20, 2009.
Richard J. Woodley,
Regional Resources Manager, Mid-Pacific
Region, Bureau of Reclamation.
[FR Doc. E9–5992 Filed 3–18–09; 8:45 am]
BILLING CODE 4310–MN–P
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
INTERNATIONAL TRADE
COMMISSION
[Investigation No. 337–TA–629]
In the Matter of Certain Silicon
Microphone Packages and Products
Containing the Same; Notice of
Commission Determination to Review
a Final Initial Determination in Part and
Set a Schedule for Filing Written
Submissions On the Issues Under
Review and On Remedy, the Public
Interest, and Bonding; Extension of
Target Date
AGENCY: U.S. International Trade
Commission.
ACTION: Notice.
SUMMARY: Notice is hereby given that
the U.S. International Trade
Commission has determined to review
in part the final initial determination
(‘‘ID’’) issued by the presiding
administrative law judge (‘‘ALJ’’) on
January 12, 2009, in the abovecaptioned investigation. The
Commission has also determined to
extend the target date by 30 days.
FOR FURTHER INFORMATION CONTACT:
Michael Liberman, Esq., Office of the
General Counsel, U.S. International
Trade Commission, 500 E Street, SW.,
Washington, DC 20436, telephone (202)
205–3116. Copies of non-confidential
documents filed in connection with this
investigation are or will be available for
inspection during official business
hours (8:45 a.m. to 5:15 p.m.) in the
Office of the Secretary, U.S.
International Trade Commission, 500 E
Street, SW., Washington, DC 20436,
telephone (202) 205–2000. General
information concerning the Commission
may also be obtained by accessing its
Internet server at https://www.usitc.gov.
The public record for this investigation
may be viewed on the Commission’s
electronic docket (EDIS) at https://
edis.usitc.gov. Hearing-impaired
persons are advised that information on
this matter can be obtained by
contacting the Commission’s TDD
terminal on (202) 205–1810.
SUPPLEMENTARY INFORMATION: The
Commission instituted this investigation
on January 14, 2008, based on the
complaint of Knowles Electronics, LLC
of Itasca, Illinois (‘‘Knowles’’). 73 FR
2277 (Jan. 14, 2008). The complaint
alleges violations of section 337 of the
Tariff Act of 1930 (19 U.S.C. 1337) in
the importation into the United States,
the sale for importation, and the sale
within the United States after
importation of certain silicon
microphone packages or products
containing same by reason of
E:\FR\FM\19MRN1.SGM
19MRN1
Agencies
[Federal Register Volume 74, Number 52 (Thursday, March 19, 2009)]
[Notices]
[Page 11748]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-5992]
[[Page 11748]]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Reclamation
Central Valley Project Improvement Act, Water Management Plans.
AGENCY: Bureau of Reclamation, Interior.
ACTION: Notice of Availability.
-----------------------------------------------------------------------
SUMMARY: The following Water Management Plans are available for review:
Banta-Carbona Irrigation District
Fresno Irrigation District
Westlands Water District
To meet the requirements of the Central Valley Project Improvement
Act of 1992 (CVPIA) and the Reclamation Reform Act of 1982, the Bureau
of Reclamation (Reclamation) developed and published the Criteria for
Evaluating Water Management Plans (Criteria). For the purpose of this
announcement, Water Management Plans (Plans) are considered the same as
Water Conservation Plans. The above entities have developed a Plan,
which Reclamation has evaluated and preliminarily determined to meet
the requirements of these Criteria. Reclamation is publishing this
notice in order to allow the public to review the plans and comment on
the preliminary determinations. Public comment on Reclamation's
preliminary (i.e., draft) determination is invited at this time.
DATES: All public comments must be received by April 20, 2009.
ADDRESSES: Please mail comments to Ms. Laurie Sharp, Bureau of
Reclamation, 2800 Cottage Way, Sacramento, California, 95825, or
contact at 916-978-5232 (TDD 978-5608), or e-mail at
lsharp@mp.usbr.gov.
FOR FURTHER INFORMATION CONTACT: To be placed on a mailing list for any
subsequent information, please contact Ms. Laurie Sharp at the e-mail
address or telephone number above.
SUPPLEMENTARY INFORMATION: We are inviting the public to comment on our
preliminary (i.e., draft) determination of Plan adequacy. Section
3405(e) of the CVPIA (Title 34 Public Law 102-575), requires the
Secretary of the Interior to establish and administer an office on
Central Valley Project water conservation best management practices
that shall ``* * * develop criteria for evaluating the adequacy of all
water conservation plans developed by project contractors, including
those plans required by section 210 of the Reclamation Reform Act of
1982.'' Also, according to Section 3405(e)(1), these criteria must be
developed ``* * * with the purpose of promoting the highest level of
water use efficiency reasonably achievable by project contractors using
best available cost-effective technology and best management
practices.'' These criteria state that all parties (Contractors) that
contract with Reclamation for water supplies (municipal and industrial
contracts over 2,000 acre-feet and agricultural contracts over 2,000
irrigable acres) must prepare Plans that contain the following
information:
1. Description of the District.
2. Inventory of Water Resources.
3. Best Management Practices (BMPs) for Agricultural Contractors.
4. BMPs for Urban Contractors.
5. Plan Implementation.
6. Exemption Process.
7. Regional Criteria.
8. Five-Year Revisions.
Reclamation will evaluate Plans based on these criteria. A copy of
these Plans will be available for review at Reclamation's Mid-Pacific
(MP) Regional Office located in Sacramento, California, and the local
area office. Our practice is to make comments, including names and home
addresses of respondents, available for public review.
Before including your name, address, phone number, e-mail address,
or other personal identifying information in your comment, you should
be aware that your entire comment--including your personal identifying
information--may be made publicly available at any time. While you can
ask us in your comment to withhold your personal identifying
information from public review, we cannot guarantee that we will be
able to do so.
If you wish to review a copy of these Plans, please contact Ms.
Laurie Sharp to find the office nearest you.
Dated: February 20, 2009.
Richard J. Woodley,
Regional Resources Manager, Mid-Pacific Region, Bureau of Reclamation.
[FR Doc. E9-5992 Filed 3-18-09; 8:45 am]
BILLING CODE 4310-MN-P