Los Vaqueros Reservoir Expansion, Contra Costa and Alameda Counties, CA, 13301 [2010-6024]
Download as PDF
Federal Register / Vol. 75, No. 53 / Friday, March 19, 2010 / Notices
you can ask us in your comment to
withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
Environmental Review
The Service will conduct an
environmental review to analyze the
proposed action, as well as other
alternatives evaluated and the
associated impacts of each. The draft
EIS will be the basis for the impact
evaluation for each species covered and
the range of alternatives to be addressed.
The draft EIS is expected to provide
biological descriptions of the affected
species and habitats, as well as the
effects of the alternatives on other
resources such as vegetation, wetlands,
wildlife, geology and soils, air quality,
water resources, water quality, cultural
resources, land use, recreation, water
use, local economy, climate change, and
environmental justice. Following
completion of the environmental
review, the Service will publish a notice
of availability and a request for
comments on the draft EIS and the
Applicant’s permit application, which
will include the draft HCP. The draft
EIS and draft HCP are expected to be
completed and available to the public in
early to mid-2010.
Thomas L. Bauer,
Acting Regional Director, Region 2,
Albuquerque, New Mexico.
[FR Doc. 2010–5944 Filed 3–18–10; 8:45 am]
BILLING CODE 4310–55–P
100 thousand acre-feet (TAF). A 175
TAF expansion option would expand
the reservoir to 275 TAF. This
expansion option would be operated for
environmental water management and
San Francisco Bay Area water supply
reliability. A 60 TAF expansion option
would expand the reservoir to 160 TAF.
This second option would primarily be
operated to improve Contra Costa Water
District (CCWD) dry year water supply
reliability and water quality.
A Notice of Availability of the Draft
EIS/EIR was published in the Federal
Register on February 20, 2009 (74 FR
7922). The written comment period on
the Draft EIS/EIR ended on April 21,
2009. The Final EIS/EIR contains
responses to all written comments
received during the review period.
DATES: Reclamation will not make a
decision on the project until at least 30
days after release of the Final EIS/EIR.
After a 30-day waiting period,
Reclamation may complete a Record of
Decision (ROD). The ROD will state the
action to be implemented and will
discuss all the factors leading to that
decision.
Copies of the Final EIS/EIR
may be requested from Ms. Sharon
McHale, Bureau of Reclamation, 2800
Cottage Way, Sacramento, CA 95825; by
calling 916–978–5086 (TTY 916–978–
5608); or by e-mailing
smchale@usbr.gov. The Final EIS/EIR is
also accessible from the following Web
site: https://www.usbr.gov/mp/nepa/
nepa_projdetails.cfm?Project_ID=903.
ADDRESSES:
Ms.
Sharon McHale at 916–978–5086, or by
e-mail at smchale@usbr.gov.
SUPPLEMENTARY INFORMATION: The Final
EIS/EIR documents the direct, indirect,
and cumulative physical, biological, and
socioeconomic environment effects that
may result from the construction and
operation of the 60 TAF expansion and
175 expansion of Los Vaqueros
Reservoir.
The Final EIS/EIR documents the
evaluation of four alternatives,
including No Action. The primary study
area includes the Los Vaqueros
Reservoir watershed and associated dam
and reservoir facilities, which are
situated in the coastal foothills west of
the Delta and east of the San Francisco
Bay Area, the central and south Delta,
and service areas of San Francisco Bay
Area water agencies.
Copies of the Final EIS/EIR are
available for public review at the
following locations:
• Bureau of Reclamation, Mid-Pacific
Region, Regional Library, 2800 Cottage
Way, Sacramento, CA 95825.
FOR FURTHER INFORMATION CONTACT:
DEPARTMENT OF THE INTERIOR
Bureau of Reclamation
Los Vaqueros Reservoir Expansion,
Contra Costa and Alameda Counties,
CA
AGENCY: Bureau of Reclamation,
Interior.
ACTION: Notice of availability of the
Final Environmental Impact Statement/
Environmental Impact Report (Final
EIS/EIR).
The Bureau of Reclamation,
as the National Environmental Policy
Act Federal lead agency, and the Contra
Costa Water District, as the California
Environmental Quality Act lead agency,
have prepared the Los Vaqueros
Reservoir Expansion Final EIS/EIR. Los
Vaqueros Expansion is a proposed
action in the August 2000 CALFED BayDelta Program Programmatic Record of
Decision. The Final EIS/EIR evaluated
two options for expanding Los Vaqueros
Reservoir from its existing capacity of
erowe on DSK5CLS3C1PROD with NOTICES
SUMMARY:
VerDate Nov<24>2008
14:14 Mar 18, 2010
Jkt 220001
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
13301
• Bureau of Reclamation, Denver
Office Library, Building 67, Room 167,
Denver Federal Center, 6th and Kipling,
Denver, CO 80225.
• Contra Costa Water District, 2411
Bisso Lane, Concord, CA 94524.
• Natural Resources Library, U.S.
Department of the Interior, 1849 C
Street, NW., Main Interior Building,
Washington, DC 20240–0001.
Public hearings were held on March
23, 2009 in Sacramento, California; on
March 24, 2009 in Livermore,
California; on March 26, 2009 in Dublin,
California; on March 31, 2009 in
Concord, California; and on April 2,
2009 in Oakley, California.
Public Disclosure: Before including
your name, address, phone number, email address, or other personal
identifying information in any
correspondence, you should be aware
that your entire correspondence—
including your personal identifying
information—may be made publicly
available at any time. While you can ask
us in your correspondence to withhold
your personal identifying information
from public review, we cannot
guarantee that we will be able to do so.
Dated: January 27, 2010.
Mike Chotkowski,
Acting Regional Director, Mid-Pacific Region.
[FR Doc. 2010–6024 Filed 3–18–10; 8:45 am]
BILLING CODE 4310–MN–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLNVSO3100 L5101000.ER0000
LVRWF09F8590 241A; 10–08807;
MO#4500012002; TAS: 14X5017]
Notice of Availability of the Draft
Environmental Impact Statement for
the Solar Millennium Amargosa Farm
Road Solar Power Project, Nye County,
NV
AGENCY: Bureau of Land Management,
Interior.
ACTION: Notice of availability.
SUMMARY: In accordance with the
National Environmental Policy Act
(NEPA) of 1969, as amended, the Bureau
of Land Management (BLM) has
prepared a Draft Environmental Impact
Statement (EIS) for the Amargosa Farm
Road Solar Power Project, Nye County,
Nevada, and by this Notice is
announcing the opening of the comment
period.
DATES: To ensure comments will be
considered, the BLM must receive
written comments on the Amargosa
Farm Road Solar Power Project Draft EIS
E:\FR\FM\19MRN1.SGM
19MRN1
Agencies
[Federal Register Volume 75, Number 53 (Friday, March 19, 2010)]
[Notices]
[Page 13301]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-6024]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Reclamation
Los Vaqueros Reservoir Expansion, Contra Costa and Alameda
Counties, CA
AGENCY: Bureau of Reclamation, Interior.
ACTION: Notice of availability of the Final Environmental Impact
Statement/Environmental Impact Report (Final EIS/EIR).
-----------------------------------------------------------------------
SUMMARY: The Bureau of Reclamation, as the National Environmental
Policy Act Federal lead agency, and the Contra Costa Water District, as
the California Environmental Quality Act lead agency, have prepared the
Los Vaqueros Reservoir Expansion Final EIS/EIR. Los Vaqueros Expansion
is a proposed action in the August 2000 CALFED Bay-Delta Program
Programmatic Record of Decision. The Final EIS/EIR evaluated two
options for expanding Los Vaqueros Reservoir from its existing capacity
of 100 thousand acre-feet (TAF). A 175 TAF expansion option would
expand the reservoir to 275 TAF. This expansion option would be
operated for environmental water management and San Francisco Bay Area
water supply reliability. A 60 TAF expansion option would expand the
reservoir to 160 TAF. This second option would primarily be operated to
improve Contra Costa Water District (CCWD) dry year water supply
reliability and water quality.
A Notice of Availability of the Draft EIS/EIR was published in the
Federal Register on February 20, 2009 (74 FR 7922). The written comment
period on the Draft EIS/EIR ended on April 21, 2009. The Final EIS/EIR
contains responses to all written comments received during the review
period.
DATES: Reclamation will not make a decision on the project until at
least 30 days after release of the Final EIS/EIR. After a 30-day
waiting period, Reclamation may complete a Record of Decision (ROD).
The ROD will state the action to be implemented and will discuss all
the factors leading to that decision.
ADDRESSES: Copies of the Final EIS/EIR may be requested from Ms. Sharon
McHale, Bureau of Reclamation, 2800 Cottage Way, Sacramento, CA 95825;
by calling 916-978-5086 (TTY 916-978-5608); or by e-mailing
smchale@usbr.gov. The Final EIS/EIR is also accessible from the
following Web site: https://www.usbr.gov/mp/nepa/nepa_projdetails.cfm?Project_ID=903.
FOR FURTHER INFORMATION CONTACT: Ms. Sharon McHale at 916-978-5086, or
by e-mail at smchale@usbr.gov.
SUPPLEMENTARY INFORMATION: The Final EIS/EIR documents the direct,
indirect, and cumulative physical, biological, and socioeconomic
environment effects that may result from the construction and operation
of the 60 TAF expansion and 175 expansion of Los Vaqueros Reservoir.
The Final EIS/EIR documents the evaluation of four alternatives,
including No Action. The primary study area includes the Los Vaqueros
Reservoir watershed and associated dam and reservoir facilities, which
are situated in the coastal foothills west of the Delta and east of the
San Francisco Bay Area, the central and south Delta, and service areas
of San Francisco Bay Area water agencies.
Copies of the Final EIS/EIR are available for public review at the
following locations:
Bureau of Reclamation, Mid-Pacific Region, Regional
Library, 2800 Cottage Way, Sacramento, CA 95825.
Bureau of Reclamation, Denver Office Library, Building 67,
Room 167, Denver Federal Center, 6th and Kipling, Denver, CO 80225.
Contra Costa Water District, 2411 Bisso Lane, Concord, CA
94524.
Natural Resources Library, U.S. Department of the
Interior, 1849 C Street, NW., Main Interior Building, Washington, DC
20240-0001.
Public hearings were held on March 23, 2009 in Sacramento,
California; on March 24, 2009 in Livermore, California; on March 26,
2009 in Dublin, California; on March 31, 2009 in Concord, California;
and on April 2, 2009 in Oakley, California.
Public Disclosure: Before including your name, address, phone
number, e-mail address, or other personal identifying information in
any correspondence, you should be aware that your entire
correspondence--including your personal identifying information--may be
made publicly available at any time. While you can ask us in your
correspondence to withhold your personal identifying information from
public review, we cannot guarantee that we will be able to do so.
Dated: January 27, 2010.
Mike Chotkowski,
Acting Regional Director, Mid-Pacific Region.
[FR Doc. 2010-6024 Filed 3-18-10; 8:45 am]
BILLING CODE 4310-MN-P