Department of the Army 2008 – Federal Register Recent Federal Regulation Documents

Results 151 - 172 of 172
Army Educational Advisory Committee
Document Number: E8-6639
Type: Notice
Date: 2008-04-01
Agency: Department of Defense, Department of the Army, Army Department
Pursuant to the Federal Advisory Committee Act of 1972 (5 U.S.C., Appendix, as amended), the Sunshine in the Government Act of 1976 (5 U.S.C. 552b, as amended), and 41 CFR 102-3.150, the following meeting notice is announced:
Submission for OMB Review; Comment Request
Document Number: E8-6537
Type: Notice
Date: 2008-03-31
Agency: Department of Defense, Department of the Army, Army Department
Submission for OMB Review; Comment Request
Document Number: E8-6535
Type: Notice
Date: 2008-03-31
Agency: Department of Defense, Department of the Army, Army Department
Notice of Intent (NOI) To Prepare an Environmental Impact Statement (EIS) for Transformation-Related Increased Training at Fort Benning, GA (Maneuver Center of Excellence EIS)
Document Number: E8-5219
Type: Notice
Date: 2008-03-18
Agency: Department of Defense, Department of the Army, Army Department
In order to transform the Army, meet the increased national security and defense requirements of the 21st century, maintain training and operational readiness levels of the force, and preserve a high quality of life for U.S. Army Soldiers and Families, the Army has identified the need to increase its overall size while continuing to restructure its forces in accordance with modular Transformation decisions. On December 19, 2007, the Army signed a Record of Decision (ROD) documenting its decision to proceed with growth of the Active and Reserve components of the Army by 74,200 Soldiers through establishment of several new Brigade Combat Teams (BCTs) and Combat Support and Combat Support Service units (CS/CSS). The growth of the Army would allow for the adjustment of the composition of its forces to continue to accommodate Transformation objectives and create additional unit capabilities in high demand areas where mission requirements exceed current manning authorizations. The Army growth decision will result in increased demands for the use of Fort Benning. Fort Benning will prepare a Maneuver Center of Excellence EIS to analyze Grow the Army (GTA) site-specific requirements and additional actions needed to support Base Realignment and Closure (BRAC) implementation at Fort Benning. In 2007 Fort Benning prepared a Final EIS for proposed Transformation and Base Realignment and Closure activities and signed a ROD selecting an alternative to proceed with several necessary projects and activities (Final EIS for BRAC 05 Realignment and Transformation Actions at Fort Benning, October 2007). Although Fort Benning itself will not experience permanent force structure growth beyond that analyzed in the BRAC 05 Realignment and Transformation EIS, it will be required to increase training of transient student loads in order to achieve and maintain the Army end-strength growth. The Fort Benning Maneuver Center of Excellence EIS will therefore consider a proposed action and reasonable alternatives for the Army to increase facilities at Fort Benning to accommodate training requirements related to BRAC, Global Defense Posture Realignment (GDPR), Army Modular Force Initiatives (AMF), GTA and other related stationing activities.
Appointment of Army Officials to the Army Emergency Relief-Board of Managers and Board of Advisors
Document Number: E8-5134
Type: Notice
Date: 2008-03-14
Agency: Department of Defense, Department of the Army, Army Department
Notice is given of certain Army officials assigned to positions authorized to serve without compensation as a director or officer, or to otherwise participate in the management of the Army Emergency Relief (AER), a military welfare society.
Preparation of the Supplemental Programmatic Environmental Impact Statement (SPEIS) for Army Growth and Force Structure Realignment To Support Operations in the Pacific Theater
Document Number: E8-4882
Type: Notice
Date: 2008-03-13
Agency: Department of Defense, Department of the Army, Army Department
The Army intends to prepare an SPEIS in order to evaluate the relative environmental and socioeconomic impacts of support operations growth in the Pacific Theater as it transforms and aligns its forces to address existing capabilities shortfalls. As part of Army growth, this evaluation will be conducted to supplement the analysis and decisions that were included in the PEIS for Grow the Army (for continental U.S. (CONUS) locations), which was completed in January 2008. The Army will use the SPEIS analysis to evaluate and compare the environmental and socioeconomic impacts of alternatives for implementing its Proposed Action. The Army's Proposed Action is to grow, realign, and transform its forces to support operations in the Pacific Theater and to ensure the proper capabilities exist to sustain operations in promoting global and national security now and into the foreseeable future. The implementation of the Proposed Action is needed to better meet military operational and national security requirements and the needs of the Army's Soldiers and their Families. The SPEIS will assess the capacity of Army installations and their ability to accommodate new units as part of Army growth and force structure realignment to support operations in the Pacific Theater. Alternatives in the SPEIS could include stationing of additional Combat Support (CS) or Combat Service Support (CSS) units or new support brigades. The following alternatives will be analyzed in the SPEIS: (1) Grow, transform, and realign forces by stationing approximately 5,000 additional CS/CSS Soldiers in reasonable locations that support operations in the Pacific Theater; (2) Grow, transform, and realign forces by stationing approximately 7,500 additional CS/CSS Soldiers in reasonable locations that support operations in the Pacific Theater and (3) Grow, transform, and realign forces by stationing approximately 10,000 additional CS/CSS Soldiers in reasonable locations that support operations in the Pacific Theater. The SPEIS will evaluate different stationing scenarios in reasonable locations, which may include Army installations in the CONUS, Hawaii and Alaska with the capability to support operations in the Pacific Theater. In addition to the above alternatives, the No Action Alternative will be considered and used as a baseline for comparison of alternatives. The No Action Alternative is to retain the U. S. Army forces in the Pacific in their current end strength and force structure. The No Action Alternative includes those stationing decisions which have already been made to include stationing actions directed by Base Realignment and Closure legislation in 2005, Army Global Defense Posture Realignment, and Army Modular Forces initiatives. The No Action Alternative is not a viable means for meeting the current and future strategic security and defense requirements of the nation. The SPEIS will analyze the Proposed Action's impacts upon the natural, cultural, and man-made environments at those stationing locations which are capable of supporting the needs of the Army and its Soldiers and Families. Viable alternatives include those stationing locations that are able to meet Army unit requirements for training ranges and maneuver space, housing and office space, maintenance and vehicle parking, and Soldier and Family quality of life (e.g., schools, gyms, medical facilities). In addition, viable alternatives must meet the operational mission requirements of the Pacific Command (PACOM).
Record of Decision (ROD) for the Final Environmental Impact Statement (FEIS) for the Renewal of the Special Use Permit (SUP) for Military Activities on the De Soto National Forest and Implementation of Installation Mission Support Activities at Camp Shelby, MI
Document Number: E8-4535
Type: Notice
Date: 2008-03-11
Agency: Department of Defense, Department of the Army, Army Department
The NGB has decided to proceed with the proposed action to renew the SUP for a 20-year period and construct, operate, and maintain the projects listed in the final EIS including the reconfiguration of the Combined Arms Area.
Availability of Non-Exclusive, Exclusive License or Partially Exclusive Licensing of U.S. Patent Concerning Enzymatic Polymerization
Document Number: E8-4568
Type: Notice
Date: 2008-03-07
Agency: Department of Defense, Department of the Army, Army Department
In accordance with 37 CFR 404.6, announcement is made of the availability for licensing of U.S. Patent No. U.S. 7,332,297 entitled ``Enzymatic Polymerization'' issued February 19, 2007. This patent has been assigned to the United States Government as represented by the Secretary of the Army.
Availability of Non-Exclusive, Exclusive License or Partially Exclusive Licensing of U.S. Patent Concerning NBC Marker Light
Document Number: E8-4567
Type: Notice
Date: 2008-03-07
Agency: Department of Defense, Department of the Army, Army Department
In accordance with 37 CFR 404.6, announcement is made of the availability for licensing of U.S. Patent No. U.S. 7,298,244 entitled ``NBC Marker Light'' issued November 20, 2007. This patent has been assigned to the United States Government as represented by the Secretary of the Army.
Availability of Non-Exclusive, Exclusive License or Partially Exclusive Licensing of U.S. Patent Concerning Methods for the Purification and Aqueous Fiber Spinning of Spider Silks and Other Structural Proteins
Document Number: E8-4503
Type: Notice
Date: 2008-03-07
Agency: Department of Defense, Department of the Army, Army Department
In accordance with 37 CFR 404.6, announcement is made of the availability for licensing of U.S. Patent No. U.S. 7,335,739 entitled ``Methods for the Purification and Aqueous Fiber Spinning of Spider Silks and other Structural Proteins'' issued February 26, 2008. This patent has been assigned to the United States Government as represented by the Secretary of the Army.
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of Invention Described in U.S. Provisional Patent Application Concerning Identification of Staphylococcal Enterotoxin-B (SEB) Sequences Involved in Cell Proliferation and Cell Death
Document Number: E8-3916
Type: Notice
Date: 2008-02-29
Agency: Department of Defense, Department of the Army, Army Department
In accordance with 37 CFR 404.4, 404.6 and 404.7, announcement is made of the availability for licensing of the invention described in U.S. Provisional Patent Application No. 60/853,906 entitled ``Identification of Staphylococcal Enterotoxin-B (SEB) Sequences Involved in Cell Proliferation and Cell Death,'' filed October 24, 2006. Foreign rights are also available (PCT/US2007/022473). The United States Government, as represented by the Secretary of the Army, has rights in this invention.
Notice of availability of the Final Environmental Impact Statement (FEIS) for the Permanent Stationing of the 2nd Brigade, 25th Infantry Division Stryker Brigade Combat Team (SBCT)
Document Number: 08-793
Type: Notice
Date: 2008-02-22
Agency: Department of Defense, Department of the Army, Army Department
The Department of the Army announces the availability of a FEIS for the permanent stationing of the 2nd Brigade, 25th Infantry Division (2/25th) SBCT. Pursuant to the National Environmental Policy Act (NEPA), the Department of the Army has prepared an Environmental Impact Statement (EIS) to disclose potential impacts to the natural, physical, and human environment resulting from the permanent stationing of the 2/25th SBCT. Potential impacts have been analyzed at installations that are capable of meeting the SBCTs training, operational, Soldier and Family quality of life, and strategic deployment requirements. This FEIS identifies Schofield Barracks Military Reservation in Hawaii as the Army's preferred alternative for the stationing location of the 2/25th SBCT. A Record of Decision (ROD) will announce the final location decision after the 30-day waiting period for the FEIS has been completed.
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of Invention Described in U.S. Provisional Patent Application Concerning Treatment of Ischemia-Reperfusion Injury with Lipid, Annexin, and Lipid-Annexin Complexes
Document Number: E8-2980
Type: Notice
Date: 2008-02-19
Agency: Department of Defense, Department of the Army, Army Department
In accordance with 37 CFR 404.4, 404.6 and 404.7, announcement is made of the availability for licensing of the invention described in U.S. Provisional Patent Application No. 60/786,527 entitled ``Treatment of Ischemia-Reperfusion Injury with Lipid, Annexin, and Lipid-Annexin Complexes,'' filed March 27, 2006. Foreign rights are also available (PCT/US2007/065125). The United States Government, as represented by the Secretary of the Army, has rights in this invention.
Board of Visitors, United States Military Academy (USMA)
Document Number: E8-2499
Type: Notice
Date: 2008-02-11
Agency: Department of Defense, Department of the Army, Army Department
Under the provisions of the Federal Advisory Committee Act of 1972 (5 U.S.C., Appendix, as amended), the Government in the Sunshine Act of 1976 (5 U.S.C. 552b, as amended), and 41 CFR 102-3.150, the Department of Defense announces that the following Federal advisory committee meeting will take place: 1. Name of Committee: United States Military Academy Board of Visitors. 2. Date: Wednesday, February 27, 2008. 3. Time: 1 p.m.-4 p.m. Members of the public wishing to attend the meeting will need to show photo identification in order to gain access to the meeting location. All participants are subject to security screening. 4. Location: Rayburn House Office Building, Washington, DC 20515 (exact room location is to be determined and will be published prior to February 27, 2008). 5. Purpose of the Meeting: This is the 2008 Organizational Meeting of the USMA Board of Visitors (BoV). Members of the Board will be provided updates on Academy issues. 6. Agenda: The Academy leadership will provide the Board updates on the following: Accreditation, United States Military Academy Preparatory School (USMAPS) move to West Point, Gender Relations, The Academy Campaign Plan, Infrastructure, Residential Communities Initiative (RCI), Resource Update, Class Composition Goals, and Cadet Surveys. The Board will discuss proposed meeting dates for the 2008 Summer and Fall meetings, and will hold elections for the 2008 Chairperson and Vice-Chairperson. 7. Public's Accessibility to the Meeting: Pursuant to 5 U.S.C. 552b and 41 CFR 102-3.140 through 102-3.165, and the availability of space, this meeting is open to the public. Seating is on a first-come basis. 8. Committee's Designated Federal Officer or Point of Contact: Ms. Cynthia Kramer, (845) 938-5078, Cynthia.kramer@us.army.mil.
Submission for OMB Review; Comment Request
Document Number: E8-1855
Type: Notice
Date: 2008-02-01
Agency: Department of Defense, Department of the Army, Army Department
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Patent Concerning Remote Mosaic Imaging System Having High-Resolution, Wide Field-of-View and Low Bandwidth
Document Number: E8-1747
Type: Notice
Date: 2008-01-31
Agency: Department of Defense, Department of the Army, Army Department
In accordance with 37 CFR 404.6 and 404.7, announcement is made of the availability for licensing of the invention set forth in U.S. Patent No. 6,704,460 entitled ``Remote mosaic imaging system having high-resolution, wide field-of-view and low bandwidth,'' issued on March 9, 2004. The United States Government, as represented by the Secretary of the Army, has rights in this invention.
Privacy Act of 1974; System of Records
Document Number: E8-1391
Type: Notice
Date: 2008-01-28
Agency: Department of Defense, Department of the Army, Army Department
The Department of the Army is amending a system of records notices in its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Office of the Secretary; Privacy Act of 1974; System of Records
Document Number: 08-333
Type: Notice
Date: 2008-01-28
Agency: Department of Defense, Department of the Army, Army Department
The Army Review Boards Agency (ARBA) is amending A0015-185 SFMR systems of records notice in its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Patent Application Concerning Arthropod Repellent Pharmacophore Models, Compounds Identified as Fitting the Pharmacophore Models, and Methods of Marking and Using Thereof
Document Number: E8-813
Type: Notice
Date: 2008-01-17
Agency: Department of Defense, Department of the Army, Army Department
In accordance with 37 CFR 404.6 and 404.7, announcement is made of the availability for licensing of U.S. Patent Application No. 10/701,565 entitled ``Arthropod Repellent Pharmacophore Models, Compounds Identified as Fitting the Pharmacophore Models, and Methods of Marking and Using Thereof,'' filed November 6, 2003. Foreign rights are also available (PCT/US03/35424). The United States Government, as represented by the Secretary of the Army, has rights in this invention.
Availability of Non-Exclusive, Exclusive License or Partially Exclusive Licensing of U.S. Patent Concerning Polymer-Template Complex Produced by Enzymatic Polymerization
Document Number: E8-369
Type: Notice
Date: 2008-01-11
Agency: Department of Defense, Department of the Army, Army Department
In accordance with 37 CFR 404.6, announcement is made of the availability for licensing of U.S. Patent No. U.S. 7,309,582 entitled ``Polymer-Template Complex Produced by Enzymatic Polymerization'' issued December 18, 2007. This patent has been assigned to the United States Government as represented by the Secretary of the Army.
Notice of Availability of the Record of Decision for Army Growth and Force Structure Realignment
Document Number: 07-6222
Type: Notice
Date: 2008-01-07
Agency: Department of Defense, Department of the Army, Army Department
The Department of the Army announces the availability of the Record of Decision (ROD) for Army Growth and Force Structure Realignment. This ROD announces the Army's decisions for growing and realigning U.S. Army forces within the Continental United States (CONUS). Pursuant to the National Environmental Policy Act (NEPA), the Department of the Army prepared a Programmatic Environmental Impact Statement (PEIS) that evaluated the potential environmental and socio- economic effects associated with alternatives for Army growth and realignment. In the Final PEIS, which was published on 26 OCT, 2007, the Army identified Alternative Three as the preferred alternative. The Record of Decision explains that the Army will proceed with its preferred alternative, Alternative Three. This alternative best supports Army Modular Transformation; implements Global Defense Posture Realignment (GDPR) decisions; adds the necessary Combat Support and Combat Service Support Soldiers to the Active and Reserve components of the Army; and grows the Army by six Active component Brigade Combat Teams (BCTs) and fifteen Active and Reserve component support brigades. Each of the BCTs will be Infantry BCTs. In addition, the PEIS analysis was used to relocate a Maneuver Enhancement Brigade (MEB) headquarters and two Heavy Brigade Combat Teams (HBCTs). The HBCTs will be activated in Germany and retained until FY12 and FY13 before returning to the United States. A return of these BCTs to the United States is not a part of previous decisions to implement Base Realignment and Closure (BRAC) 2005. This decision and analysis within this PEIS do not include BRAC 2005 stationing actions, which are considered part of the baseline condition for analysis. This decision will result in a total growth in Army forces by approximately 74,200 Soldiers, and will realign forces to improve readiness and responsiveness to meet future challenges.
Final Environmental Impact Statement (FEIS) for the Renewal of the Special Use Permit (SUP) for Military Activities on the De Soto National Forest and Implementation of Installation Mission Support Activities at Camp Shelby, MS
Document Number: 07-6286
Type: Notice
Date: 2008-01-04
Agency: Department of Defense, Department of the Army, Army Department
This FEIS has been prepared by the NGB and the U.S. Department of AgricultureForest Service (USDA-FS). NGB is the lead agency and the USDA-FS is serving as a cooperating agency in the development of this FEIS for the renewal of the current SUP that authorizes military training activities at Camp shelby Training Site.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.