Safety Zone; Atlantic Ocean, Key West, FL
The Coast Guard is proposing to establish a safety zone to be enforced in the event of hurricanes, tropical storms, and other disasters in the Florida Keys. This action is necessary to ensure the safety of the waters of the Key West Captain of the Port (COTP) zone Key West, FL. This proposed rulemaking would establish actions to be completed by industry and vessels in the COTP zone prior to landfall of hurricanes, tropical storms, and other disasters threatening the Florida Keys. We invite your comments on this proposed rulemaking.
Safety Zone; Potomac River, Between Charles County, MD and King George County, VA
The Coast Guard is establishing a temporary safety zone for certain waters of the Potomac River. This action is necessary to provide for the safety of life on these navigable waters at the old Governor Harry W. Nice/Senator Thomas ``Mac'' Middleton Memorial (US- 301) Bridge during demolition operations from May 1, 2023 through June 9, 2023. This rule will prohibit persons and vessels from being in the safety zone unless authorized by the Captain of the Port, Maryland- National Capital Region or a designated representative.
Safety Zone; South Fork Wind Farm Project Area, Outer Continental Shelf, Lease OCS-A 0517, Offshore Rhode Island, Atlantic Ocean
The Coast Guard is establishing 13 temporary 500-meter safety zones around the construction of 12 wind turbine generators (WTGs) and one offshore substation (OSS) located in the South Fork Wind Farm (SFWF) project area within federal waters on the Outer Continental Shelf (OCS), specifically, in the Bureau of Ocean Energy Management (BOEM) Renewable Energy Lease Area OCS-A 0517, approximately 16 nautical miles (NM) southeast of Block Island, Rhode Island, and 30 NM east of Montauk Point, New York. This action is necessary to provide for the safety of life, property, and the environment during the anticipated construction of each facility's monopile type foundation and subsequent installation of the WTGs turbines and OSS platform from May 1, 2023, to December 31, 2023. When enforced, only attending vessels and those vessels specifically authorized by the First Coast Guard District Commander or a designated representative are permitted to enter or remain in the safety zones.