Coast Guard June 23, 2017 – Federal Register Recent Federal Regulation Documents
Results 1 - 3 of 3
Drawbridge Operation Regulation; Thames River, New London, CT
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Amtrak Bridge across Thames River, mile 3.0, at New London, CT. This action is necessary to complete installation of an emergency generator. This deviation allows the bridge to require a two hour advance notice for openings during nighttime hours.
Safety Zones; Annual Fireworks Displays Within the Sector Columbia River Captain of the Port Zone
The Coast Guard is establishing safety zones at various locations in the Sector Columbia River Captain of the Port zone. This action is necessary to provide for the safety of life on these navigable waters during fireworks displays. This regulation prohibits persons and vessels from being in the safety zone unless authorized by the Captain of the Port Sector Columbia River or a designated representative.
Safety Zone, Delaware River; Dredging
The Coast Guard is establishing temporary safety zones in portions of Marcus Hook Range, Deepwater Point Range, and New Castle Range, on the Delaware River, to facilitate the annual maintenance dredging of the Federal Navigation Channel. The safety zones will be established for the waters in the vicinity of the dredge and associated pipeline, including dredge pipe which is located in Marcus Hook Anchorage No. 7 and Pea Patch Island Anchorage No. 5. This regulation is necessary to provide for the safety of life on navigable waters of the Delaware River, in the vicinity of dredging activity, and is intended to protect mariners from the hazards associated with pipe- laying and dredging operations.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.