Department of Homeland Security December 14, 2015 – Federal Register Recent Federal Regulation Documents
Results 1 - 7 of 7
Drawbridge Operation Regulation; Hoquiam River, Hoquiam, WA
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Simpson Avenue Bridge across the Hoquiam River, mile 0.5, at Hoquiam, WA. The deviation is necessary to accommodate Washington State Department of Transportation's (WSDOT) extensive maintenance and restoration efforts on this bridge. This deviation allows WSDOT to open one leaf of the double leaf bascule bridge when at least two hours of notice is given. The vertical clearance will be reduced to approximately 25 feet at mean high tide, and the horizontal clearance will be reduced to 52 feet.
Recovery Policy, RP 9525.7, Labor Costs-Emergency Work
This document provides notice of the availability of the final policy, Recovery Policy 9525.7, Labor CostsEmergency Work. The Federal Emergency Management Agency (FEMA) published a notice of availability and request for comment for the proposed policy on August 13, 2010 at 75 FR 49508.
Changes in Flood Hazard Determinations
This notice lists communities where the addition or modification of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or the regulatory floodway (hereinafter referred to as flood hazard determinations), as shown on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports, prepared by the Federal Emergency Management Agency (FEMA) for each community, is appropriate because of new scientific or technical data. The FIRM, and where applicable, portions of the FIS report, have been revised to reflect these flood hazard determinations through issuance of a Letter of Map Revision (LOMR), in accordance with Title 44, Part 65 of the Code of Federal Regulations (44 CFR part 65). The LOMR will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes, the currently effective community number is shown in the table below and must be used for all new policies and renewals.
Final Flood Hazard Determinations
Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or regulatory floodways on the Flood Insurance Rate Maps (FIRMs) and where applicable, in the supporting Flood Insurance Study (FIS) reports have been made final for the communities listed in the table below. The FIRM and FIS report are the basis of the floodplain management measures that a community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the Federal Emergency Management Agency's (FEMA's) National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report are used by insurance agents and others to calculate appropriate flood insurance premium rates for buildings and the contents of those buildings.
Final Flood Hazard Determinations
Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or regulatory floodways on the Flood Insurance Rate Maps (FIRMs) and where applicable, in the supporting Flood Insurance Study (FIS) reports have been made final for the communities listed in the table below. The FIRM and FIS report are the basis of the floodplain management measures that a community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the Federal Emergency Management Agency's (FEMA's) National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report are used by insurance agents and others to calculate appropriate flood insurance premium rates for buildings and the contents of those buildings.
Final Flood Hazard Determinations
Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or regulatory floodways on the Flood Insurance Rate Maps (FIRMs) and where applicable, in the supporting Flood Insurance Study (FIS) reports have been made final for the communities listed in the table below. The FIRM and FIS report are the basis of the floodplain management measures that a community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the Federal Emergency Management Agency's (FEMA's) National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report are used by insurance agents and others to calculate appropriate flood insurance premium rates for buildings and the contents of those buildings.
Customs Brokers User Fee Payment for 2016
This document provides notice to customs brokers that the annual user fee of $138 that is assessed for each permit held by a broker, whether it may be an individual, partnership, association, or corporation, is due by February 26, 2016.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.