Western Area Power Administration June 2024 – Federal Register Recent Federal Regulation Documents

Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-213
Document Number: 2024-14275
Type: Notice
Date: 2024-06-28
Agency: Department of Energy, Western Area Power Administration
The Upper Great Plains (UGP) region of the Western Area Power Administration (WAPA) proposes revised formula rates for the Pick-Sloan Missouri Basin Program (P-SMBP)Eastern Division (ED) firm power, firm peaking power service, and sale of surplus products. The existing formula rates for these services, under Rate Schedules P-SED-F14 and P- SED-FP14, and sale of surplus products, under formula rate schedule P- SED-M2, do not expire until December 31, 2027; however, the existing firm power and firm peaking power service rates no longer provide sufficient revenue to recover interest expense and repay investments. The formula rate for sale of surplus products is not changing but is being included in Rate Order No. WAPA-213 (WAPA-213) in order to make these rate schedules effective for the same time frame.
Loveland Area Projects-Rate Order No. WAPA-212
Document Number: 2024-14274
Type: Notice
Date: 2024-06-28
Agency: Department of Energy, Western Area Power Administration
The Rocky Mountain (RM) region of the Western Area Power Administration (WAPA) proposes revised formula rates for the Loveland Area Projects (LAP) firm electric service (FES) and sale of surplus products. LAP consists of the Fryingpan-Arkansas Project (Fry-Ark) and the Pick-Sloan Missouri Basin Program (P-SMBP)Western Division (WD), which were integrated for marketing and rate-making purposes in 1989. The existing formula rates for these services, under Rate Schedules L- F12 and L-M3, do not expire until December 31, 2027; however, the existing FES rate no longer provides sufficient revenues to recover interest expense and repay investments. The formula rate for sale of surplus products is not changing but is being included in Rate Order No. WAPA-212 (WAPA-212) in order to make these rate schedules effective for the same time frame.
Loveland Area Projects, Western Area Colorado Missouri Balancing Authority, and Colorado River Storage Project-Rate Order No. WAPA-214
Document Number: 2024-12212
Type: Notice
Date: 2024-06-04
Agency: Department of Energy, Western Area Power Administration
The extension of the Rocky Mountain (RM) region's existing Loveland Area Projects (LAP) transmission and LAP, Western Area Colorado Missouri Balancing Authority (WACM), and Colorado River Storage Project (CRSP) ancillary services formula rates has been confirmed, approved, and placed into effect on an interim basis. The existing formula rates under Rate Schedules L-NT1 (network), L-FPT1 (firm point-to-point), L-NFPT1 (non-firm point-to-point), L-NFJDT (joint dispatch transmission), L-UU1 (unreserved use), L-AS1 (scheduling and dispatch), L-AS2 (reactive supply and voltage control support), L-AS3 (regulation), L-AS4 (energy imbalance), L-AS5 (spinning reserves), L-AS6 (supplemental reserves), L-AS7 (balancing authority real power losses), and L-AS9 (generator imbalance) are set to expire on September 30, 2024. This rate extension makes no changes to the existing formula rates and extends them through September 30, 2026.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.