Western Area Power Administration June 4, 2024 – Federal Register Recent Federal Regulation Documents
Results 1 - 1 of 1
Loveland Area Projects, Western Area Colorado Missouri Balancing Authority, and Colorado River Storage Project-Rate Order No. WAPA-214
The extension of the Rocky Mountain (RM) region's existing Loveland Area Projects (LAP) transmission and LAP, Western Area Colorado Missouri Balancing Authority (WACM), and Colorado River Storage Project (CRSP) ancillary services formula rates has been confirmed, approved, and placed into effect on an interim basis. The existing formula rates under Rate Schedules L-NT1 (network), L-FPT1 (firm point-to-point), L-NFPT1 (non-firm point-to-point), L-NFJDT (joint dispatch transmission), L-UU1 (unreserved use), L-AS1 (scheduling and dispatch), L-AS2 (reactive supply and voltage control support), L-AS3 (regulation), L-AS4 (energy imbalance), L-AS5 (spinning reserves), L-AS6 (supplemental reserves), L-AS7 (balancing authority real power losses), and L-AS9 (generator imbalance) are set to expire on September 30, 2024. This rate extension makes no changes to the existing formula rates and extends them through September 30, 2026.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.