Western Area Power Administration March 21, 2019 – Federal Register Recent Federal Regulation Documents

Estes to Flatiron Transmission Lines Rebuild Project Environmental Impact Statement (DOE/EIS-0483)
Document Number: 2019-05385
Type: Notice
Date: 2019-03-21
Agency: Department of Energy, Western Area Power Administration
The Western Area Power Administration (WAPA) issued the Final Environmental Impact Statement (EIS) (DOE/EIS-0483) for the Estes to Flatiron Transmission Lines Rebuild Project (Project) on April 13, 2018. The Agency Preferred Alternative developed by WAPA through the National Environmental Policy Act (NEPA) process and described in the Final EIS is summarized in this Record of Decision (ROD). This alternative is also the Environmentally Preferred Alternative for the Project. All practicable means to avoid or minimize environmental harm have been adopted. WAPA has selected the Agency Preferred Alternative identified in the Final EIS for implementation.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.