Estes to Flatiron Transmission Lines Rebuild Project Environmental Impact Statement (DOE/EIS-0483)
The Western Area Power Administration (WAPA) issued the Final Environmental Impact Statement (EIS) (DOE/EIS-0483) for the Estes to Flatiron Transmission Lines Rebuild Project (Project) on April 13, 2018. The Agency Preferred Alternative developed by WAPA through the National Environmental Policy Act (NEPA) process and described in the Final EIS is summarized in this Record of Decision (ROD). This alternative is also the Environmentally Preferred Alternative for the Project. All practicable means to avoid or minimize environmental harm have been adopted. WAPA has selected the Agency Preferred Alternative identified in the Final EIS for implementation.
Loveland Area Projects, Colorado River Storage Project, Central Arizona Project, Pacific Northwest-Pacific Southwest Intertie Project, and Parker-Davis Project-Rate Order No. WAPA-187
Western Area Power Administration (WAPA) proposes to extend its existing formula rates for on-peak and off-peak transmission service provided under the WestConnect Point-to-Point Regional Transmission Service Participation Agreement (WestConnect PA) through May 31, 2024. The existing rate schedule for this service, Rate Schedule WC-8, expires on May 31, 2019.
Boulder Canyon Project
The Deputy Secretary of Energy approves, on a final basis, the Boulder Canyon Project (BCP) base charge and rates for Fiscal Year (FY) 2019 under Rate Schedule BCP-F10. Under Rate Schedule BCP-F10, the BCP base charge and rates are calculated annually.