Western Area Power Administration March 2016 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Salt Lake City Area Integrated Projects and Colorado River Storage Project 2025 General Power Marketing Criteria-Extension of Public Comment Period
Western Area Power Administration (Western), Colorado River Storage Project Management Center (CRSP MC), a Federal power marketing agency of the Department of Energy, is extending the public comment period on its Proposed 2025 Marketing Plan for the SLCA/IP. This Federal Register notice (FRN) extends the public comment period for the Proposed 2025 Marketing Plan for the SLCA/IP contained in Western's December 16, 2015, FRN.
Central Valley Project, California-Oregon Transmission Project, Pacific Alternating Current Intertie, Third-Party Transmission Service; and Information on the Path 15 Transmission Upgrade-Rate Order No. WAPA-173
The Western Area Power Administration (Western) extends, on an interim basis, the existing Central Valley Project power, transmission, and ancillary services formula rates; California-Oregon Transmission Project transmission formula rate; Pacific Alternating Current Intertie transmission formula rate; and third-party transmission service formula rate. This action extends Rate Schedules CV-F13, CPP-2, CV-T3, CV-NWT5, COTP-T3, PACI-T3, CV-TPT7, CV-UUP1, CV-SPR4, CV-SUR4, CV-RFS4, CV-EID4, and CV-GID1 through September 30, 2019. The interim rates will be in effect until the Federal Energy Regulatory Commission (FERC) places the formula rates into effect on a final basis or until superseded.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.