Pick-Sloan Missouri Basin Program-Eastern Division
Western Area Power Administration (Western) transferred functional control of eligible Western-Upper Great Plains Region (Western-UGP) transmission facilities to Southwest Power Pool, Inc. (SPP) on October 1, 2015. Transmission service is being provided over Western-UGP's eligible facilities under SPP's Open Access Transmission Tariff. Western-UGP costs are included in Western-UGP Formula rates for Transmission and Ancillary Services under Rate Schedules WAUGP-ATRR, WAUGP-AS1, WAUW-AS3, WAUW-AS4, WAUW-AS5, WAUW-AS6 and WAUW-AS7, which became effective on October 1, 2015.
Colusa-Sutter 500-Kilovolt Transmission Line Project, Colusa and Sutter Counties, California (DOE/EIS-0514)
On December 18, 2015, Western Area Power Administration (Western), an agency of the Department of Energy (DOE), announced the Notice of Intent to prepare an Environmental Impact Statement/ Environmental Impact Report (EIS/EIR) for the proposed 500-kilovolt (kV) transmission line to be located within Colusa and Sutter Counties, California. This proposed Project is known as the Colusa-Sutter (CoSu) 500-kV Transmission Line Project. In that previous notice, Western described the schedule for scoping meetings and advised the public that comments on the scope of the EIS/EIR were due by February 16, 2016. By this notice, Western extends the due date for comments on the scope of the EIS/EIR to April 18, 2016.
Rocky Mountain Region Transmission, Ancillary Services, and Sale of Surplus Products-Rate Order No. WAPA-174
The Western Area Power Administration (Western) Loveland Area Projects' (LAP) Transmission and Western Area Colorado Missouri Balancing Authority's (WACM) Ancillary Services formula rates under Rate Schedules L-NT1, L-FPT1, L-NFPT1, L-AS1, L-AS2, L-AS3, L-AS4, L- AS5, L-AS6, L-AS7, L-AS9, and L-UU1 expire on September 30, 2016. Western is proposing modifications to the existing formula rate schedules and also is proposing to add a new rate schedule, referred to as ``LAP Marketing Sale of Surplus Products, L-M1.'' Western has prepared a brochure that provides detailed information on the proposed formula rates. If adopted, the proposed formula rates, under Rate Schedules L-NT1, L-FPT1, L-NFPT1, L-AS1, L-AS2, L-AS3, L-AS4, L-AS5, L- AS6, L-AS7, L-AS9, L-UU1, and L-M1, will become effective October 1, 2016, and will remain in effect through September 30, 2021, or until superseded. Publication of this Federal Register notice (FRN) begins the formal process for consideration of the proposed formula rates.
Desert Southwest Customer Service Region Network Integration Transmission Service and Ancillary Services-Rate Order No. WAPA-175
The Western Area Power Administration (Western) Parker-Davis (P-DP) and Pacific Northwest-Pacific Southwest Intertie (Intertie) Projects' Network Integration Transmission Service (NITS) formula rates under Rate Schedules PD-NTS3, INT-NTS3 and Western Area Lower Colorado Balancing Authority's (WALC) Ancillary Services formula rates under Rate Schedules DSW-SD3, DSW-RS3, DSW-FR3, DSW-EI3, DSW-GI1, DSW-SPR3, and DSW-SUR3 expire on September 30, 2016. Western is proposing modifications to the existing formula rate schedules and adding two new rate schedules, referred to as Transmission Losses Services (DSW-TL1) and Penalty Rate for Unreserved Use of Transmission Service (DSW-UU1). Western will prepare a brochure that provides detailed information on the proposed formula rates. If adopted, the proposed formula rates, under Rate Schedules PD-NTS4, INT-NTS4, DSW-TL1, DSW-UU1, DSW-SD4, DSW- RS4, DSW-FR4, DSW-EI4, DSW-GI2, DSW-SPR4, and DSW-SUR4 will become effective October 1, 2016, and will remain in effect through September 30, 2021, or until superseded. Publication of this Federal Register notice (FRN) begins the formal process for the proposed formula rates.