Western Area Power Administration April 28, 2015 – Federal Register Recent Federal Regulation Documents
Results 1 - 1 of 1
Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska (DOE/EIS-0485)
Western Area Power Administration (Western) received a request from Grande Prairie Wind, LLC (Grande Prairie Wind), a subsidiary of Geronimo Wind Energy, LLC d.b.a. Geronimo Energy, LLC to interconnect their proposed Grande Prairie Wind Farm (Project) to Western's power transmission system. The proposed interconnection point would be on Western's existing Fort Thompson to Grand Island 345-kilovolt (kV) transmission line, approximately seven miles east of the town of O'Neill in Holt County, Nebraska. The Project would be built on private and State cropland and pasture. On January 16, 2015, the Notice of Availability (NOA) of the Final Environmental Impact Statement (EIS) for the Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska (DOE/EIS-0485) was published in the Federal Register (80 FR 2414). After considering the environmental impacts, Western has decided to execute an interconnection agreement with Grande Prairie Wind to interconnect the proposed Project to Western's transmission system and to construct, own, and operate a new switchyard adjacent to its Fort Thompson to Grand Island 345-kV transmission line to accommodate that interconnection.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.