Western Area Power Administration February 2015 – Federal Register Recent Federal Regulation Documents

Provo River Project Rate Order No. WAPA-165
Document Number: 2015-02981
Type: Notice
Date: 2015-02-12
Agency: Department of Energy, Western Area Power Administration
Western Area Power Administration (Western) extends, on an interim basis, the existing Provo River Project Formula Rate through March 31, 2020. The existing Formula Rate under Rate Order No. WAPA-149 expires on March 31, 2015. The Formula Rate will be in effect until the Federal Energy Regulatory Commission (FERC) places it into effect on a final basis or until it is replaced by another rate.
Boulder Canyon Project-Rate Order No. WAPA-171
Document Number: 2015-02559
Type: Notice
Date: 2015-02-09
Agency: Department of Energy, Western Area Power Administration
The Western Area Power Administration (Western) is proposing to extend the existing rate-setting formula for the Boulder Canyon Project (BCP) through September 30, 2020, and adjust the annual calculation for fiscal year (FY 2016) Base Charge and Rates under proposed Rate Schedule BCP-F9 (Proposed Base Charge and Rates). The existing Rate Schedule BCP-F8 expires on September 30, 2015. This notice of proposed extension of the electric service rate-setting formula and adjustment of the base charge and rates is issued pursuant to 10 CFR part 903.23(a) and 10 CFR part 904. Publication of this Federal Register notice begins the formal process for the proposed extension of the electric service rate-setting formula and the annual calculation of the base charge and rates.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.