Notice of Availability of the Final Environmental Impact Statement for the Quartzsite Solar Energy Project and the Yuma Field Office Proposed Resource Management Plan Amendment
Quartzsite Solar Energy (QSE) has requested to interconnect the Quartzsite Solar Energy Project (Project), a proposed 100-megawatt (MW) concentrating solar power plant, to Western Area Power Administration's (Western) Bouse-Kofa 161-kilovolt (kV) transmission line. QSE has submitted a right-of-way (ROW) application to the Bureau of Land Management (BLM) for the Project facility to be constructed on a total of approximately 1,675 acres of land managed by the BLM. The Project area is in an undeveloped area of the Sonoran Desert in La Paz County, Arizona. In accordance with the National Environmental Policy Act (NEPA) of 1969, as amended, and the Federal Land Policy and Management Act (FLPMA) of 1976, as amended, Western and the BLM prepared a Final Environmental Impact Statement \1\ (EIS) and Yuma Field Office (Yuma) Proposed Resource Management Plan Amendment (PRMPA) for the Project, and by this Notice Western and the BLM are announcing the availability of the Final EIS/PRMPA. Western is the lead Federal agency for purposes of satisfying the NEPA requirements with the BLM acting as a cooperating agency.
Draft Recommendations of Joint Outreach Team
The Western Area Power Administration (Western), a power marketing administration (PMA) of the Department of Energy (DOE), is publishing the draft recommendations of the Western/DOE Joint Outreach Team (JOT) for review and comment by Western's customers, Tribes, stakeholders, and the public at large.
Boulder Canyon Project-Post-2017 Resource Pool
The Western Area Power Administration (Western), a Federal power marketing agency of the Department of Energy (DOE), is seeking comments on proposed marketing criteria for allocating the Federal power from the Boulder Canyon Project (BCP). The Conformed Power Marketing Criteria or Regulations for the Boulder Canyon Project (2012 Conformed Criteria) published in the Federal Register on June 14, 2012, as required by the Hoover Power Allocation Act of 2011, established a resource pool (Post-2017 Resource Pool) to be allocated to new allottees and general eligibility criteria. Western is proposing for comment additional marketing criteria to be used to allocate the Post- 2017 Resource Pool that will become available October 1, 2017. Once determined, these marketing criteria, in conjunction with the 2012 Conformed Criteria, will establish the framework for allocating power from the Post-2017 Resource Pool. This Federal Register notice (FRN) is not a call for applications. A call for applications from those interested in an allocation of BCP power will occur in a future notice.
Relocation of Transmission Lines for the U.S. 93 Boulder City Bypass Project, Boulder County, NV, Record of Decision (DOE/EIS-0490)
The Federal Highway Administration (FHWA) prepared an Environmental Impact Statement (EIS) for a proposal to improve the United States Highway 93 (U.S. 93) corridor through Henderson and Boulder City, Nevada, from the Foothills Road grade separation on U.S. 93/95 in Henderson to the western end of the Hoover Dam Bypass project near the Hacienda Hotel and Casino. Western Area Power Administration (Western), an agency within the Department of Energy (DOE), needs to modify its transmission system and facilities to accommodate the construction of the Boulder City Bypass Project (Project). Western was a cooperating agency for the EIS. Western will ensure that its responsibilities under the National Historic Preservation Act (NHPA) and the Endangered Species Act (ESA) are met before the modifications are implemented.
Pacific Northwest-Pacific Southwest Intertie Project-Rate Order No. WAPA-159
This action is to extend the existing Pacific Northwest- Pacific Southwest Intertie Project (Intertie) transmission services rates through September 30, 2013. The existing rates under Rate Schedules INT-FT4 and INT-NFT3 are set to expire September 30, 2012.
Notice of Cancellation of Environmental Impact Statement for the Proposed Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, SD (DOE/EIS-0437)
The U.S. Department of Energy (DOE), Western Area Power Administration (Western) is issuing this notice to advise the public that it is cancelling the preparation of an environmental impact statement (EIS) under the National Environmental Policy Act (NEPA) on an interconnection request by Heartland Wind, LLC (Heartland), a wholly owned subsidiary of Iberdrola Renewables, Inc.
Boulder Canyon Project
In this notice, the Deputy Secretary of Energy (Deputy Secretary) approves the Fiscal Year (FY) 2013 Base Charge and Rates for Boulder Canyon Project (BCP) electric service provided by the Western Area Power Administration (Western). The Base Charge will provide sufficient revenue to pay all annual costs, including interest expense, and repay investments within the allowable period.
Central Arizona Project-Rate Order No. WAPA-158
The Western Area Power Administration (Western), a power marketing administration with the Department of Energy (DOE), is proposing to extend the existing formula rates for Central Arizona Project (CAP) transmission services on the CAP 115-kilovolt (kV) and 230-kV transmission facilities through December 31, 2015. The existing Transmission Service Formula Rate Schedules CAP-FT2, CAP-NFT2, and CAP- NITS2, expire December 31, 2012. This notice of proposed extension of rates is issued pursuant to 10 CFR 903.23(a). Publication of this Federal Register notice begins the formal process for the proposed extension of the CAP Transmission Formula Rates.
Conformed Power Marketing Criteria or Regulations for the Boulder Canyon Project
The Western Area Power Administration (Western), a Federal power marketing agency of the Department of Energy (DOE), is modifying Part C of its Conformed General Consolidated Power Marketing Criteria or Regulations for Boulder City Area Projects (1984 Conformed Criteria) published in the Federal Register on December 28, 1984, as required by the Hoover Power Allocation Act of 2011 (HPAA) described herein. This modification will result in the conformance of the 1984 Conformed Criteria to the HPAA. The 2012 Conformed General Consolidated Power Marketing Criteria or Regulations for Boulder City Area Projects (2012 Conformed Criteria) will provide the basis for marketing the long-term hydroelectric resources of the Boulder Canyon Project (BCP) beyond September 30, 2017, when Western's current electric service contracts expire. Additional power marketing criteria for new allocations will be established by Western through a subsequent public process. This Federal Register notice (FRN) is not a call for applications. A call for applications from those interested in an allocation of BCP power will be provided for in a future notice.
Pacific Northwest-Pacific Southwest Intertie Project-Rate Order No. WAPA-157
Western Area Power Administration (Western), a power marketing administration within the Department of Energy (DOE), is proposing an adjustment to the Pacific Northwest-Pacific Southwest Intertie Project (Intertie) transmission service rates. The current rates, under Rate Schedules INT-FT4 and INT-NFT3, expire September 30, 2012. The existing rates are being adjusted to provide sufficient revenue to cover all annual costs, including interest expense, and to repay capital investment obligations within the required period. Western will prepare and provide a brochure detailing information on the proposed rates. The proposed rates, under Rate Schedules INT-FT5 and INT-NFT4, are scheduled to become effective on October 1, 2012, and remain in effect through September 30, 2017. Publication of this Federal Register notice initiates the formal process for the proposed rate adjustment.
Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO
Western Area Power Administration currently owns and operates two 115-kilovolt transmission lines on two separate rights-of-way (ROW) located between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Each transmission line is approximately 16 miles long. Western is proposing to remove one transmission line and abandon the ROW. The remaining transmission line would be rebuilt along the existing ROW with taller steel monopoles and would be double- circuited (i.e., six conductors per pole). Western determined that an environmental impact statement (EIS) is the appropriate level of NEPA review. Therefore, Western will prepare an EIS on its proposal to upgrade and co-locate two existing separate transmission lines on a double-circuit transmission line on one ROW in accordance with NEPA, the DOE NEPA Implementing Procedures, and the Council on Environmental Quality (CEQ) regulations for implementing NEPA. Portions of Western's proposal may affect floodplains and wetlands, so this Notice of Intent (NOI) also serves as a notice of proposed floodplain or wetland action in accordance with DOE floodplain and wetland environmental review requirements.
Interconnection of the Grande Prairie Wind Farm, Holt County, NE
The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), intends to prepare an environmental impact statement (EIS) on the proposed interconnection of the Grande Prairie Wind Farm (Project) in Holt County, near the city of O'Neill, Nebraska. Grande Prairie Wind, LLC (Grande Prairie Wind), a majority- owned subsidiary of Midwest Wind Energy, LLC, has applied to Western to interconnect their proposed wind energy generation project to Western's power transmission system. Western's Federal action would be to execute an interconnection agreement with Grande Prairie Wind and make any necessary modifications to the transmission system to accommodate the interconnection at Grande Prairie Wind's expense. Western is issuing this notice to inform the public and interested parties about Western's intent to prepare an EIS, conduct a public scoping process, and invite the public to comment on the scope, proposed action, alternatives, and other issues to be addressed in the EIS. Construction activities proposed by Grande Prairie Wind may affect floodplains and wetlands, so this Notice of Intent (NOI) also serves as a notice of proposed floodplain or wetland action in accordance with DOE floodplain and wetland environmental review requirements.
Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Southline Transmission Line Project in New Mexico and Arizona (DOE/EIS-0474) and Possible Land Use Plan Amendments
In compliance with the National Environmental Policy Act of 1969 (NEPA), as amended, and the Federal Land Policy and Management Act of 1976 (FLPMA), as amended, the Bureau of Land Management (BLM) Las Cruces District Office, Las Cruces, New Mexico, intends to prepare an Environmental Impact Statement (EIS) analyzing the impacts of the proposed Southline Transmission Line Project (Project), a 345-kilovolt (kV) and 230-kV transmission line, and addressing associated potential land use plan amendments. This notice announces the beginning of the scoping process to solicit public comments and identify issues. Western Area Power Administration (Western) is a joint lead agency with BLM for preparing the EIS. Western is a power-marketing agency within the Department of Energy (DOE) and is proposing to participate in the Project with the applicant, Southline Transmission, LLC (Southline).
Boulder Canyon Project
The Western Area Power Administration (Western), a power marketing administration within the Department of Energy (DOE), is proposing an adjustment to the Boulder Canyon Project (BCP) electric service base charge and rates. The current base charge and rates expire September 30, 2012, under Rate Schedule BCP-F8. The existing base charge is being adjusted to ensure it includes all annual costs including operation, maintenance, replacements, interest expense, and to repay investment obligations within the required period. The proposed base charge will provide sufficient revenue to cover all annual costs and to repay investment obligations within the allowable period. A detailed rate package that identifies the reasons for the base charge and rates adjustment will be available in March 2012. The proposed base charge and rates are scheduled to become effective October 1, 2012, and will remain in effect through September 30, 2013. This Federal Register notice initiates the formal process for the proposed base charge and rates.