Department of Energy October 17, 2018 – Federal Register Recent Federal Regulation Documents
Results 1 - 12 of 12
Procedures for Conducting Electric Transmission Congestion Studies
The Department of Energy (Department or DOE) is reopening for 15 days the comment period for its proposed procedures for conducting electric transmission studies. DOE published a notice of procedures for studies and request for written comments on August 23, 2018, with a 45- day comment period. This notice reopens the comment period for an additional 15 days, and any comments received before November 1, 2018 will be deemed timely submitted.
Commission Information Collection Activities (FERC-725G); Comment Request; Extension
In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-725G (Reliability Standards for the Bulk Power System: PRC Reliability Standards, OMB Control No. 1902-0252). As part of this extension request, FERC will transfer the information collection requirements and burden of the FERC-725G1 (OMB Control No. 1902-0284) and FERC-725G4 (OMB Control No. 1902-0282) into FERC-725G. FERC-725G1 and FERC-725G4 information collections will eventually be discontinued.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.