Athens Energy, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 52440-52441 [2018-22627]
Download as PDF
52440
Federal Register / Vol. 83, No. 201 / Wednesday, October 17, 2018 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14634–001]
daltland on DSKBBV9HB2PROD with NOTICES
New England Hydropower Company,
LLC; Notice of Application Tendered
for Filing With the Commission and
Soliciting Additional Study Requests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Exemption
from Licensing.
b. Project No.: 14634–001.
c. Date Filed: October 1, 2018.
d. Applicant: New England
Hydropower Company, LLC (NEHC).
e. Name of Project: Ashton Dam
Hydroelectric Project.
f. Location: On the Blackstone River,
near the Towns of Cumberland and
Lincoln, Providence County, Rhode
Island. No federal or tribal lands would
be occupied by project works or located
within the project boundary.
g. Filed Pursuant to: Public Utility
Regulatory Policies Act of 1978, 16
U.S.C. 2705, 2708 (2012), amended by
the Hydropower Regulatory Efficiency
Act of 2013, Public Law 113–23, 127
Stat. 493 (2013).
h. Applicant Contact: Mr. Michael C.
Kerr, 100 Cummings Center, Suite 451C,
Beverly, MA 01915; phone (978) 360–
2547 or email at Michael@
nehydropower.com.
i. FERC Contact: John Ramer, phone:
(202) 502–8969 or email at john.ramer@
ferc.gov.
j. Cooperating Agencies: Federal,
state, local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item (l) below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See 94
FERC 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of the
Commission’s regulations, if any
resource agency, Indian Tribe, or person
believes that an additional scientific
study should be conducted in order to
form an adequate factual basis for a
complete analysis of the application on
its merit, the resource agency, Indian
Tribe, or person must file a request for
a study with the Commission not later
than 60 days from the date of filing of
VerDate Sep<11>2014
19:46 Oct 16, 2018
Jkt 247001
the application, and serve a copy of the
request on the applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: December 10, 2018.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–14634–001.
m. This application is not ready for
environmental analysis at this time.
n. The proposed Ashton Dam
Hydroelectric Project would consist of:
(1) An existing concrete gravity dam
that includes: (a) An approximately 193foot-long western spillway section; (b)
an approximately 57-foot-long middle
spillway section with a crest gate
proposed to be repaired; and (c) a
proposed new 58-foot-long eastern
section with three proposed 12-footwide, 8.8-foot-high steel sluice gates; (2)
an existing 25-acre impoundment with
a normal storage capacity of 200 acrefeet at an operating elevation of
approximately 73.6 feet North American
Vertical Datum of 1988; (3) a new 58foot-wide intake canal; (4) a 39-footwide, 11-foot-high steel trashrack with
9-inch clear bar spacing; (5) a new 30foot-long, 49-foot-wide, 14-foot-high
concrete penstock; (6) a new 53-footlong, 24-foot-wide, 18-foot-high
concrete powerhouse containing three
new 20.4-foot-long, 13.5-foot-diameter
Archimedes Screw turbine-generator
units, with a total installed capacity of
507 kilowatts, each contained in a new
15-foot-wide steel trough; (7) a new 120foot-long tailrace; (8) a new step-up
transformer and 800-foot-long aboveground transmission line connecting the
project to the distribution system owned
by Narragansett Electric Company; (9) a
new access road; and (10) appurtenant
facilities.
NEHC proposes to operate the project
in a run-of-river mode with an estimated
annual energy production of
approximately 2,130 megawatt-hours.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
PO 00000
Frm 00065
Fmt 4703
Sfmt 4703
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule: The
application will be processed according
to the following preliminary schedule.
Revisions to the schedule will be made
as appropriate (e.g., if there are no
deficiencies and/or scoping is waived,
the schedule would be shortened).
Issue Deficiency/AIR Letter.
Issue Notice of Acceptance/Ready for Environmental Analysis.
Issue Notice of the Availability of Environmental Assessment.
January 2019
April 2019
August 2019
Dated: October 11, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–22606 Filed 10–16–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–81–000]
Athens Energy, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Athens
Energy, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
E:\FR\FM\17OCN1.SGM
17OCN1
Federal Register / Vol. 83, No. 201 / Wednesday, October 17, 2018 / Notices
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is October 31,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: October 11, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–22627 Filed 10–16–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
daltland on DSKBBV9HB2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–116–000.
Applicants: International
Transmission Company.
Description: Response of International
Transmission Company to September
19, 2018 Deficiency Letter.
Filed Date: 10/9/18.
Accession Number: 20181009–5340.
Comments Due: 5 p.m. ET 10/30/18.
Docket Numbers: EC19–8–000.
VerDate Sep<11>2014
19:46 Oct 16, 2018
Jkt 247001
Applicants: American Electric Power
Service Corporation, AEP Ohio
Transmission Company, Inc.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of American Electric
Power Service Corporation, on behalf of
affiliate AEP Ohio Transmission
Company, Inc.
Filed Date: 10/10/18.
Accession Number: 20181010–5136.
Comments Due: 5 p.m. ET 10/31/18.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–10–000.
Applicants: North Rosamond Solar,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status under EG19–10.
Filed Date: 10/11/18.
Accession Number: 20181011–5120.
Comments Due: 5 p.m. ET 11/1/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2414–009.
Applicants: Old Trail Wind Farm,
LLC.
Description: Notice of Non-Material
Change in Status of Old Trail Wind
Farm, LLC.
Filed Date: 10/9/18.
Accession Number: 20181009–5337.
Comments Due: 5 p.m. ET 10/30/18.
Docket Numbers: ER10–2434–007;
ER10–2436–007; ER10–2467–007;
ER17–1666–003.
Applicants: Fenton Power Partners I,
LLC.
Description: Supplement to June 27,
2018 Triennial Market Power Update for
the Central Region of the EDFR Sellers.
Filed Date: 10/11/18.
Accession Number: 20181011–5107.
Comments Due: 5 p.m. ET 11/1/18.
Docket Numbers: ER10–3310–013;
ER18–83 001.
Applicants: New Harquahala
Generating Company, LLC, CXA La
Paloma, LLC.
Description: Notice of Non-Material
Change in Status of the Beal Entities.
Filed Date: 10/9/18.
Accession Number: 20181009–5339.
Comments Due: 5 p.m. ET 10/30/18.
Docket Numbers: ER17–1666–004;
ER17–2258 002.
Applicants: Red Pine Wind Project,
LLC, Rock Falls Wind Farm LLC.
Description: Notice of Non-Material
Change in Status of Red Pine Wind
Project, LLC, et al.
Filed Date: 10/10/18.
Accession Number: 20181010–5145.
Comments Due: 5 p.m. ET 10/31/18.
Docket Numbers: ER19–85–000.
PO 00000
Frm 00066
Fmt 4703
Sfmt 9990
52441
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA SA No. 5124 and CSA SA
No. 5125; Queue No. AB1–006 to be
effective 9/10/2018.
Filed Date: 10/10/18.
Accession Number: 20181010–5120.
Comments Due: 5 p.m. ET 10/31/18.
Docket Numbers: ER19–86–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 217, Exhibit B Revisions
to be effective 12/15/2018.
Filed Date: 10/11/18.
Accession Number: 20181011–5085.
Comments Due: 5 p.m. ET 11/1/18.
Docket Numbers: ER19–87–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
ALLETE, Inc.
Description: § 205(d) Rate Filing:
2018–10–11_SA 3185 MP–GRE T–T
(Deer River) to be effective 10/12/2018.
Filed Date: 10/11/18.
Accession Number: 20181011–5099.
Comments Due: 5 p.m. ET 11/1/18.
Docket Numbers: ER19–88–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
ALLETE, Inc.
Description: § 205(d) Rate Filing:
2018–10–11_SA 3186 MP–GRE T–T
(Zemple) to be effective 10/12/2018.
Filed Date: 10/11/18.
Accession Number: 20181011–5103.
Comments Due: 5 p.m. ET 11/1/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 11, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–22624 Filed 10–16–18; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\17OCN1.SGM
17OCN1
Agencies
[Federal Register Volume 83, Number 201 (Wednesday, October 17, 2018)]
[Notices]
[Pages 52440-52441]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-22627]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER19-81-000]
Athens Energy, LLC; Supplemental Notice That Initial Market-Based
Rate Filing Includes Request for Blanket Section 204 Authorization
This is a supplemental notice in the above-referenced proceeding of
Athens Energy, LLC's application for market-based rate authority, with
an accompanying rate tariff, noting that such application includes a
request for blanket authorization, under 18 CFR part 34, of future
issuances of securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard
[[Page 52441]]
to the applicant's request for blanket authorization, under 18 CFR part
34, of future issuances of securities and assumptions of liability, is
October 31, 2018.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the website that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
[email protected] or call (866) 208-3676 (toll free). For TTY,
call (202) 502-8659.
Dated: October 11, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-22627 Filed 10-16-18; 8:45 am]
BILLING CODE 6717-01-P