Energy Conservation Program for Consumer Products: Energy Conservation Standards for Residential Furnaces; Energy Conservation Standards for Residential Direct Heating Equipment
The U.S. Department of Energy (DOE) is issuing a final rule technical amendment to implement two orders issued by the U.S. Court of Appeals for the District of Columbia Circuit in separate litigation. Specifically, DOE is amending the relevant portions of its regulations to reflect the Court's order vacating the amended energy conservation standards for non-weatherized gas furnaces (including mobile home furnaces), which were adopted in the June 27, 2011 direct final rule for residential furnaces and residential central air conditioners and heat pumps. Similarly, DOE is also amending the relevant portions of its regulation to reflect the Court's decision to vacate the regulatory definition of ``vented hearth heater'' (and by implication, the associated energy conservation standards), which were developed in the April 27, 2010 and November 18, 2011 final rules for residential direct heating equipment.
Natural Gas Act Pipeline Maps
The Federal Energy Regulatory Commission (Commission or FERC) is proposing to amend the filing requirements for natural gas pipeline system maps. Under current regulations, natural gas pipelines must include a system map as part of their tariff on file with the Commission, and file an updated map by the following April for any year that there is a major change in the pipeline's system. Additionally, this map must be posted on the pipeline's own Web site. In order to reduce regulatory burden on these pipelines, the Commission proposes to eliminate the requirement to file a map as part of the tariff, leaving only the requirement to maintain a map on the pipeline's own Web site. Furthermore, in order to promote transparency, the Commission proposes to change the deadline for updating system maps. Currently, if a pipeline experiences a major change that renders its existing map obsolete, it must make a tariff filing no later than April 30 of the subsequent calendar year. The Commission proposes a quarterly deadline for updating pipeline maps.
Protection System Maintenance Reliability Standard
Pursuant to the section regarding Electric Reliability of the Federal Power Act, the Commission proposes to approve a revised Reliability Standard, PRC-005-3 (Protection System and Automatic Reclosing Maintenance). In addition, the Commission proposes to approve one new definition and six revised definitions referenced in the proposed Reliability Standard, the assigned violation risk factors and violation severity levels, and NERC's proposed implementation plan. Consistent with Order No. 758, the proposed Reliability Standard requires applicable entities to test and maintain certain autoreclosing relays as part of a protection system maintenance program. The Commission also proposes to direct NERC to submit a report based on actual performance data, and simulated system conditions from planning assessments, two years after the effective date of the proposed standard, which addresses whether the proposed Reliability Standard applies to an appropriate set of autoreclosing relays that can affect Bulk-Power System reliability. Further, the Commission proposes to direct NERC to modify the proposed Reliability Standard to include maintenance and testing of supervisory relays, as discussed below.