Take notice that the following
hydroelectric applications have been
filed with the Commission and are
available for public inspection.
a. Type of Application: Original Major
License.
b. Project Nos.: 13757–002; 13761–
002; 13768–002.
c. Date Filed: March 14, 2014.
d. Applicant: FFP Missouri 5, LLC;
FFP Missouri 6, LLC; Solia 6
Hydroelectric, LLC. All applicants are
subsidiaries of Free Flow Power
Corporation.
e. Name of Projects: Emsworth Locks
and Dam Hydroelectric Project;
Emsworth Back Channel Dam
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13757–002; Project No. 13761–
002; Project No. 13768–002]
FFP Missouri 5, LLC et al.; Notice of
Application Accepted for Filing and
Soliciting Motions to Intervene and
Protests
FFP Missouri 5, LLC
Project No. 13757–002
Hydroelectric Project; Montgomery
Locks and Dam Hydroelectric Project.
f. Location: The proposed projects
would be located at U.S. Army Corps of
Engineers’ (Corps) dams on the Ohio
River in Allegheny and Beaver counties,
Pennsylvania (see table below for
specific locations).
Project No.
Project
County and state
City/Town
P–13757 .......
P–13761 .......
P–13768 .......
Emsworth Locks and Dam ................................
Emsworth Back Channel Dam ..........................
Montgomery Locks & Dam ................................
Allegheny, PA .......................
Allegheny, PA .......................
Beaver, PA ............................
Emsworth ..............................
Emsworth ..............................
Borough of Industry ..............
rmajette on DSK2TPTVN1PROD with NOTICES
1 The
Federal
land used
by project 1
(acres)
9.5
9.0
5.0
federal lands are managed by the Corps.
g. Filed Pursuant to: Federal Power
Act, 16 USC 791 (a)–825(r).
h. Applicant Contact: Thomas
Feldman, Vice President, Free Flow
Power Corporation, 239 Causeway
Street, Suite 300, Boston, MA 02114; or
at (978) 283–2822.
Ramya Swaminathan, Chief Operating
Officer, Free Flow Power Corporation,
239 Causeway Street, Suite 300, Boston,
MA 02114; or at (978)–283–2822.
Daniel Lissner, General Counsel, Free
Flow Power Corporation, 239 Causeway
Street, Suite 300, Boston, MA 02114; or
at (978) 283–2822.
i. FERC Contact: Brandi Sangunett,
(202) 502–8393 or brandi.sangunett@
ferc.gov.
j. Deadline for filing motions to
intervene and protests and requests for
cooperating agency status: 60 days from
the date of this notice.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include the
applicable project name(s) and docket
VerDate Mar<15>2010
15:02 Jul 28, 2014
Jkt 232001
number(s) (e.g., Emsworth Lock and
Dams P–13757–002).
The Commission’s Rules of Practice
and Procedures require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. These applications have been
accepted for filing, but are not ready for
environmental analysis at this time.
l. The proposed Emsworth Locks and
Dam Hydroelectric Project would be
located at river mile (RM) 6.2 and would
consist of the following new facilities:
(1) A 205-foot-long, 180-foot-wide
intake channel directing flow to a 30foot-long, 63.5-foot-high, 180-foot-wide
intake structure with 5-inch bar spacing
trashracks; (2) a 180-foot-long by 180foot-wide reinforced concrete
powerhouse on the south bank of the
river; (3) four turbine-generator units
with a combined capacity of 24
megawatts (MW); (4) a 380-foot-long,
280-foot-wide tailrace; (5) a 50-foot-long
by 60-foot-wide substation; (6) a 1,893foot-long, 69-kilovolt (kV), overhead
transmission line to connect the project
substation to an existing substation; and
(7) appurtenant facilities. The average
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
annual generation would be 101,300
megawatt-hours (MWh).
The proposed Emsworth Back
Channel Dam Hydroelectric Project
would be located at RM 6.8 and consist
of the following new facilities: (1) A
100-foot-long, 165-foot-wide intake
channel directing flow to 32-foot-long,
63.5-foot-high, 90-foot-wide intake
structure with 5-inch bar spacing
trashracks; (2) a 150-foot-long by 90foot-wide reinforced concrete
powerhouse on the north bank of the
river; (3) two turbine-generator units
with a combined capacity of 12.0 MW;
(4) a 190-foot-long, 105-foot-wide
tailrace; (5) a 50-foot-long by 60-footwide substation; (6) a 3,758-foot-long,
69-kV, overhead transmission line to
connect the project substation to an
existing substation; and (7) appurtenant
facilities. The average annual generation
would be 53,500 MWh.
The proposed Montgomery Locks and
Dam Hydroelectric Project would be
located at RM 31.7 and consist of the
following new facilities: (1) A 340-footlong, 205-foot-wide intake channel
directing flow to a 150-foot-long, 90foot-high, 205-foot-wide intake structure
with 5-inch bar spacing trashracks; (2) a
315-foot-long by 205-foot-wide
reinforced concrete powerhouse on the
north bank of the river; (3) three turbinegenerator units with a combined
capacity of 42 MW; (4) a 280-foot-long,
210-foot-wide tailrace; (5) a 50-foot-long
by 60-foot-wide substation; (6) a 392-
E:\FR\FM\29JYN1.SGM
29JYN1
rmajette on DSK2TPTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 145 / Tuesday, July 29, 2014 / Notices
foot-long, 69-kV, overhead transmission
line to connect the project substation to
an existing distribution line; and (7)
appurtenant facilities. The average
annual generation would be 194,370
MWh.
Free Flow Power proposes to operate
all three projects in a ‘‘run-of-river’’
mode using flows made available by the
Corps. The proposed projects would not
change existing flow releases or water
surface elevations upstream or
downstream of the proposed projects.
m. A copy of each application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. Copies are also
available for inspection and
reproduction at the address in item h
above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
application. Submission of a timely
notice of intent allows an interested
person to file the competing
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
Anyone may submit a protest, or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 85.210, 385.211,
and 385.214. In determining the
appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline for
the particular application.
VerDate Mar<15>2010
15:02 Jul 28, 2014
Jkt 232001
When the applications are ready for
environmental analysis, the
Commission will issue a public notice
requesting comments,
recommendations, terms and
conditions, or prescriptions.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE
OF INTENT TO FILE COMPETING
APPLICATION,’’ or ‘‘COMPETING
APPLICATION;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
§§ 385.2001 through 385.2005. Agencies
may obtain copies of the applications
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
the applicant specified in the particular
application.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–17755 Filed 7–28–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13755–002]
FFP Missouri 12, LLC; Notice of
Application Accepted for Filing and
Soliciting Motions To Intervene and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original Major
License.
b. Project No.: 13755–002.
c. Date Filed: February 3, 2014.
d. Applicant: FFP Missouri 12, LLC.
e. Name of Project: Allegheny Lock
and Dam Number 2.
f. Location: The proposed project
would be located at the U.S. Army
Corps of Engineers’ (Corps) Allegheny
Lock and Dam Number 2 on the
Allegheny River in Allegheny County,
Pennsylvania. The project would
occupy 37.5 acres of federal land
managed by the Corps.
g. Filed Pursuant to: Federal Power
Act, 16 USC 791 (a)–825(r).
h. Applicant Contact: Thomas
Feldman, Vice President, Free Flow
Power Corporation, 239 Causeway
Street, Suite 300, Boston, MA 02114; or
at (978) 283–2822.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
44019
Ramya Swaminathan, Chief Operating
Officer, Free Flow Power Corporation,
239 Causeway Street, Suite 300, Boston,
MA 02114; or at (978) 283–2822.
Daniel Lissner, General Counsel, Free
Flow Power Corporation, 239 Causeway
Street, Suite 300, Boston, MA 02114; or
at (978) 283–2822.
i. FERC Contact: Allyson Conner,
(202) 502–6082 or allyson.conner@
ferc.gov.
j. Deadline for filing motions to
intervene and protests and requests for
cooperating agency status: 60 days from
the date of this notice.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–13755–002.
The Commission’s Rules of Practice
and Procedures require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. This application has been accepted
for filing, but is not ready for
environmental analysis at this time.
l. The proposed project would utilize
the existing Corps’ Allegheny Lock and
Dam Number 2, and would consist of
the following new facilities: (1) A 170foot-wide, 120-foot-long, 70-foot-high
intake structure with two 5-inch clear
bar spacing trash racks; (2) two 45-footwide, 40-foot-high spillway bays; (3) an
1,100-foot-long, 2.5-foot-high adjustable
crest gate on top of the existing dam
crest; (4) a 170-foot-wide by 180-footlong powerhouse along the east side of
the river; (5) three Kaplan turbinegenerator units with a combined
installed capacity of 17,000 kilowatts;
(6) a 50-foot-wide by 60-foot-long
substation; (7) a 1,265-foot-long, single
overhead, 69-kilovolt transmission line
to connect the project substation to an
existing distribution line owned by
Duquesne Light Company; and (8)
appurtenant facilities. The project is
E:\FR\FM\29JYN1.SGM
29JYN1
Agencies
[Federal Register Volume 79, Number 145 (Tuesday, July 29, 2014)]
[Notices]
[Pages 44018-44019]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-17755]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13757-002; Project No. 13761-002; Project No. 13768-002]
FFP Missouri 5, LLC et al.; Notice of Application Accepted for
Filing and Soliciting Motions to Intervene and Protests
FFP Missouri 5, LLC Project No. 13757-002
FFP Missouri 6, LLC Project No. 13761-002
Solia 6 Hydroelectric, LLC Project No. 13768-002
Take notice that the following hydroelectric applications have been
filed with the Commission and are available for public inspection.
a. Type of Application: Original Major License.
b. Project Nos.: 13757-002; 13761-002; 13768-002.
c. Date Filed: March 14, 2014.
d. Applicant: FFP Missouri 5, LLC; FFP Missouri 6, LLC; Solia 6
Hydroelectric, LLC. All applicants are subsidiaries of Free Flow Power
Corporation.
e. Name of Projects: Emsworth Locks and Dam Hydroelectric Project;
Emsworth Back Channel Dam Hydroelectric Project; Montgomery Locks and
Dam Hydroelectric Project.
f. Location: The proposed projects would be located at U.S. Army
Corps of Engineers' (Corps) dams on the Ohio River in Allegheny and
Beaver counties, Pennsylvania (see table below for specific locations).
----------------------------------------------------------------------------------------------------------------
Federal land
used by
Project No. Project County and state City/Town project \1\
(acres)
----------------------------------------------------------------------------------------------------------------
P-13757................ Emsworth Locks and Dam. Allegheny, PA......... Emsworth.............. 9.5
P-13761................ Emsworth Back Channel Allegheny, PA......... Emsworth.............. 9.0
Dam.
P-13768................ Montgomery Locks & Dam. Beaver, PA............ Borough of Industry... 5.0
----------------------------------------------------------------------------------------------------------------
\1\ The federal lands are managed by the Corps.
g. Filed Pursuant to: Federal Power Act, 16 USC 791 (a)-825(r).
h. Applicant Contact: Thomas Feldman, Vice President, Free Flow
Power Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114; or
at (978) 283-2822.
Ramya Swaminathan, Chief Operating Officer, Free Flow Power
Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114; or at
(978)-283-2822.
Daniel Lissner, General Counsel, Free Flow Power Corporation, 239
Causeway Street, Suite 300, Boston, MA 02114; or at (978) 283-2822.
i. FERC Contact: Brandi Sangunett, (202) 502-8393 or
brandi.sangunett@ferc.gov.
j. Deadline for filing motions to intervene and protests and
requests for cooperating agency status: 60 days from the date of this
notice.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
to: Secretary, Federal Energy Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first page of any filing should include
the applicable project name(s) and docket number(s) (e.g., Emsworth
Lock and Dams P-13757-002).
The Commission's Rules of Practice and Procedures require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. These applications have been accepted for filing, but are not
ready for environmental analysis at this time.
l. The proposed Emsworth Locks and Dam Hydroelectric Project would
be located at river mile (RM) 6.2 and would consist of the following
new facilities: (1) A 205-foot-long, 180-foot-wide intake channel
directing flow to a 30-foot-long, 63.5-foot-high, 180-foot-wide intake
structure with 5-inch bar spacing trashracks; (2) a 180-foot-long by
180-foot-wide reinforced concrete powerhouse on the south bank of the
river; (3) four turbine-generator units with a combined capacity of 24
megawatts (MW); (4) a 380-foot-long, 280-foot-wide tailrace; (5) a 50-
foot-long by 60-foot-wide substation; (6) a 1,893-foot-long, 69-
kilovolt (kV), overhead transmission line to connect the project
substation to an existing substation; and (7) appurtenant facilities.
The average annual generation would be 101,300 megawatt-hours (MWh).
The proposed Emsworth Back Channel Dam Hydroelectric Project would
be located at RM 6.8 and consist of the following new facilities: (1) A
100-foot-long, 165-foot-wide intake channel directing flow to 32-foot-
long, 63.5-foot-high, 90-foot-wide intake structure with 5-inch bar
spacing trashracks; (2) a 150-foot-long by 90-foot-wide reinforced
concrete powerhouse on the north bank of the river; (3) two turbine-
generator units with a combined capacity of 12.0 MW; (4) a 190-foot-
long, 105-foot-wide tailrace; (5) a 50-foot-long by 60-foot-wide
substation; (6) a 3,758-foot-long, 69-kV, overhead transmission line to
connect the project substation to an existing substation; and (7)
appurtenant facilities. The average annual generation would be 53,500
MWh.
The proposed Montgomery Locks and Dam Hydroelectric Project would
be located at RM 31.7 and consist of the following new facilities: (1)
A 340-foot-long, 205-foot-wide intake channel directing flow to a 150-
foot-long, 90-foot-high, 205-foot-wide intake structure with 5-inch bar
spacing trashracks; (2) a 315-foot-long by 205-foot-wide reinforced
concrete powerhouse on the north bank of the river; (3) three turbine-
generator units with a combined capacity of 42 MW; (4) a 280-foot-long,
210-foot-wide tailrace; (5) a 50-foot-long by 60-foot-wide substation;
(6) a 392-
[[Page 44019]]
foot-long, 69-kV, overhead transmission line to connect the project
substation to an existing distribution line; and (7) appurtenant
facilities. The average annual generation would be 194,370 MWh.
Free Flow Power proposes to operate all three projects in a ``run-
of-river'' mode using flows made available by the Corps. The proposed
projects would not change existing flow releases or water surface
elevations upstream or downstream of the proposed projects.
m. A copy of each application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. Copies are also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Any qualified applicant desiring to file a competing application
must submit to the Commission, on or before the specified intervention
deadline date, a competing development application, or a notice of
intent to file such an application. Submission of a timely notice of
intent allows an interested person to file the competing development
application no later than 120 days after the specified intervention
deadline date. Applications for preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the exact name, business address,
and telephone number of the prospective applicant, and must include an
unequivocal statement of intent to submit a development application. A
notice of intent must be served on the applicant(s) named in this
public notice.
Anyone may submit a protest, or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
85.210, 385.211, and 385.214. In determining the appropriate action to
take, the Commission will consider all protests filed, but only those
who file a motion to intervene in accordance with the Commission's
Rules may become a party to the proceeding. Any protests or motions to
intervene must be received on or before the specified deadline for the
particular application.
When the applications are ready for environmental analysis, the
Commission will issue a public notice requesting comments,
recommendations, terms and conditions, or prescriptions.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE,'' ``NOTICE OF INTENT TO FILE
COMPETING APPLICATION,'' or ``COMPETING APPLICATION;'' (2) set forth in
the heading the name of the applicant and the project number of the
application to which the filing responds; (3) furnish the name,
address, and telephone number of the person protesting or intervening;
and (4) otherwise comply with the requirements of 18 CFR Sec. Sec.
385.2001 through 385.2005. Agencies may obtain copies of the
applications directly from the applicant. A copy of any protest or
motion to intervene must be served upon each representative of the
applicant specified in the particular application.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-17755 Filed 7-28-14; 8:45 am]
BILLING CODE 6717-01-P