Department of Energy July 24, 2013 – Federal Register Recent Federal Regulation Documents
Results 1 - 12 of 12
Protection System Maintenance Reliability Standard
Pursuant to section 215 of the Federal Power Act, the Commission proposes to approve a revised Reliability Standard, PRC-005- 2Protection System Maintenance, to supersede four existing Reliability Standards, PRC-005-1.1b (Transmission and Generation Protection System Maintenance and Testing), PRC-008-0 (Underfrequency Load Shedding Equipment Maintenance), PRC-011-0 (Undervoltage Load Shedding Equipment Maintenance) and PRC-017-0 (Special Protection System Maintenance and Testing). In addition, the Commission seeks clarification and comment on three aspects of the proposed Reliability Standard and proposes to modify one violation severity level.
Revisions to Page 700 of FERC Form No. 6
The Federal Energy Regulatory Commission (Commission) is modifying Page 700 of FERC Form No. 6 (Form 6) to facilitate the calculation of an oil pipeline's actual return on equity for preliminary screening purposes. The Commission will expand the information provided regarding Rate Base (line 5), Rate of Return (line 6), Return on Rate Base (line 7), and Income Tax Allowance (line 8).
Effective Date of Revised Company Registration Requirements
This document establishes the effective date of the Revised Company Registration Requirements. The Commission issued a Notice in the Federal Register, 78 FR 10,614 (February 14, 2013), requesting public comments by April 15, 2013.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.