Department of Energy April 25, 2012 – Federal Register Recent Federal Regulation Documents

Combined Notice of Filings #1
Document Number: 2012-9957
Type: Notice
Date: 2012-04-25
Agency: Department of Energy, Federal Energy Regulatory Commission
Environmental Management Site-Specific Advisory Board, Savannah River Site
Document Number: 2012-9942
Type: Notice
Date: 2012-04-25
Agency: Department of Energy
This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. . 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.
Environmental Management Site-Specific Advisory Board, Nevada
Document Number: 2012-9941
Type: Notice
Date: 2012-04-25
Agency: Department of Energy
This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Nevada. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.
Version 4 Critical Infrastructure Protection Reliability Standards
Document Number: 2012-9893
Type: Rule
Date: 2012-04-25
Agency: Department of Energy, Federal Energy Regulatory Commission
Under section 215 of the Federal Power Act, the Federal Energy Regulatory Commission (Commission) approves eight modified Critical Infrastructure Protection (CIP) Reliability Standards, CIP-002-4 through CIP-009-4, developed and submitted to the Commission for approval by the North American Electric Reliability Corporation (NERC), the Electric Reliability Organization certified by the Commission. The CIP Reliability Standards provide a cybersecurity framework for the identification and protection of ``Critical Cyber Assets'' to support the reliable operation of the Bulk-Power System. Reliability Standard CIP-002-4 requires the identification and documentation of Critical Cyber Assets associated with ``Critical Assets'' that support the reliable operation of the Bulk-Power System and introduces ``bright line'' criteria for the identification of Critical Assets. The Commission approves the related Violation Risk Factors, Violation Severity Levels with modifications, implementation plan, and effective date proposed by NERC.
Open Access and Priority Rights on Interconnection Facilities
Document Number: 2012-9848
Type: Proposed Rule
Date: 2012-04-25
Agency: Department of Energy, Federal Energy Regulatory Commission
In this Notice of Inquiry, the Commission seeks comment on open access and priority rights for capacity on interconnection facilities.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.