Department of Energy December 29, 2011 – Federal Register Recent Federal Regulation Documents
Results 1 - 15 of 15
Nationwide Categorical Waivers Under Section 1605 (Buy American) of the American Recovery and Reinvestment Act of 2009 (Recovery Act)
The U.S. Department of Energy (DOE) is hereby granting a nationwide limited waiver of the Buy American requirements of section 1605 of the Recovery Act under the authority of Section 1605(b)(2), (iron, steel, and the relevant manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality), with respect to Recovery Act projects funded by EERE for (1) Multi-colored Full Wave Rectified strands of 5mm, conical shaped LED mini bulbs in molded sockets with 4'' spacing between bulbs, UL listed with a minimum 50,000 hour lamp life; (2) Ancillary items needed for a T-12 to T-8 retrofit, including the ballast disconnects, ancillary wiring and welding materials where needed, and the spacing clip to accommodate T-8 bulbs into a T-12 fixture; and (3) Roof integrated flat plate collectors producing 1250 btu/square foot, where the installation requires a roof integrated solar collector to meet local historic preservation or local building standards.
Nationwide Categorical Waivers Under Section 1605 (Buy American) of the American Recovery and Reinvestment Act of 2009 (Recovery Act)
The U.S. Department of Energy (DOE) is hereby granting a nationwide limited waiver of the Buy American requirements of section 1605 of the Recovery Act under the authority of Section 1605(b)(2), (iron, steel, and the relevant manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality), with respect to Recovery Act projects funded by EERE for (1) Absorption chillers rated at 205 and 250 tons; (2) Thermostatic Regulator Valves that regulate the flow of hot water or low pressure steam through free-standing radiators, baseboards, or convectors in hot water and two-pipe steam systems; (3) 28 and 30 W 180 degree LED replacement bulbs for HID street lights; (4) 100% Oil free rotary screw variable speed drive water cooled air compressor with a factory installed dryer capable of supplying air at
Limited Public Interest Waiver Under Section 1605 (Buy American) of the American Recovery and Reinvestment Act of 2009 (Recovery Act)
The U.S. Department of Energy (DOE) is hereby granting a determination of inapplicability (unreasonable cost waiver) of section 1605 of the American Reinvestment and Recovery Act of 2009 (Recovery Act Buy American provisions) to the Commonwealth Utilities Corporation's (CUC) located in the Commonwealth of the Northern Mariana Islands (CNMI), recipient of the EECBG grant DE-EE0000762, for 5 diesel engine radiators to be installed at the CUC's main power plant located in Saipan, CNMI. This waiver applies only to this project.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.