National Fuel Gas Supply Corporation; Notice of Availability of the Environmental Assessment for the Proposed Line N 2012 Expansion Project, 81926-81927 [2011-33312]
Download as PDF
81926
Federal Register / Vol. 76, No. 250 / Thursday, December 29, 2011 / Notices
385.214 or 385.211) and the Regulations
under the NGA (18 CFR 157.10). A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies of all documents
filed by the applicant and by all other
parties. A party must submit original
and 7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
Motions to intervene, protests and
comments may be filed electronically
via the Internet in lieu of paper, see, 18
CFR 385.2001 (a)(1)(iii) and the
instructions on the Commission’s web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Comment Date: 5 p.m. Eastern Time
on January 11, 2011.
Dated: December 21, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–33313 Filed 12–28–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator Status
Docket Nos.
Alliant Energy Corporate Services, Inc ...........................................................................................................................................
Full Circle Renewables, LLC ...........................................................................................................................................................
Invenergy Illinois Solar I LLC ..........................................................................................................................................................
Record Hill Wind LLC ......................................................................................................................................................................
Vasco Winds, LLC ...........................................................................................................................................................................
NexEra Energy Montezuma II Wind, LLC .......................................................................................................................................
Richard-Stryker Generation LLC .....................................................................................................................................................
Pioneer Trail Wind Farm, LLC .........................................................................................................................................................
GSG 6, LLC .....................................................................................................................................................................................
Take notice that during the month of
November 2011, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a).
Dated: December 21, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–33316 Filed 12–28–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–512–000]
wreier-aviles on DSK3TPTVN1PROD with NOTICES
National Fuel Gas Supply Corporation;
Notice of Availability of the
Environmental Assessment for the
Proposed Line N 2012 Expansion
Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) for the
Line N 2012 Expansion Project (Project),
proposed by National Fuel Gas Supply
Corporation (National Fuel) in the above
referenced docket. National Fuel
proposes to construct and operate the
Project in Washington County,
Pennsylvania to create new
transportation capacity on the existing
Line N for emerging Marcellus Shale gas
production, as well as to generate
adequate pressure to redeliver this gas
to Texas Eastern Transmission
VerDate Mar<15>2010
15:12 Dec 28, 2011
Jkt 226001
Corporation. The Project would increase
available capacity by approximately
150,000 dekatherms per day.
The EA assesses the potential
environmental effects of the
construction and operation of the
Project in accordance with the
requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the proposed Project, with appropriate
mitigating measures, would not
constitute a major Federal action
significantly affecting the quality of the
human environment.
The proposed Line N 2012 Expansion
Project includes the following facilities:
• Replacement of 4.85 miles of 24inch-diameter natural gas pipeline;
• Installation of two 10,280
horsepower gas-fired turbine-driven
compressors at the existing Buffalo
Compressor Station;
• The construction of a pig launcher/
receiver 1 at milepost 4.85; and
• The replacement of 20-inchdiameter pipeline at four road crossings
south of the Buffalo Compressor Station.
The FERC staff mailed copies of the
EA to Federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
newspapers and libraries in the project
area; and parties to this proceeding. In
1 A ‘‘pig’’ is a tool that is inserted into and moves
through the pipeline, and is used for cleaning the
pipeline, internal inspections, or other purposes.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
EG11–125–000
EG11–126–000
EG11–127–000
EG11–128–000
EG11–129–000
EG11–130–000
EG11–131–000
EG11–132–000
EG11–133–000
addition, the EA is available for public
viewing on the FERC’s Web site
(www.ferc.gov) using the eLibrary link.
A limited number of copies of the EA
are available for distribution and public
inspection at: Federal Energy Regulatory
Commission, Public Reference Room,
888 First Street NE., Room 2A,
Washington, DC 20426, (202) 502–8371.
Any person wishing to comment on
the EA may do so. Your comments
should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that the
Commission has the opportunity to
consider your comments prior to
making its decision on this project, it is
important that we receive your
comments in Washington, DC on or
before January 25, 2012.
For your convenience, there are three
methods you can use to file your
comments to the Commission. In all
instances, please reference the project
docket number (CP11–512–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
efiling@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can also file your comments
electronically using the eFiling feature
E:\FR\FM\29DEN1.SGM
29DEN1
wreier-aviles on DSK3TPTVN1PROD with NOTICES
Federal Register / Vol. 76, No. 250 / Thursday, December 29, 2011 / Notices
on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room
1A, Washington, DC 20426.
Any person seeking to become a party
to the proceeding must file a motion to
intervene pursuant to Rule 214 of the
Commission’s Rules of Practice and
Procedures (18 CFR 385.214).2 Only
intervenors have the right to seek
rehearing of the Commission’s decision.
The Commission grants affected
landowners and others with
environmental concerns intervenor
status upon showing good cause by
stating that they have a clear and direct
interest in this proceeding which no
other party can adequately represent.
Simply filing environmental comments
will not give you intervenor status, but
you do not need intervenor status to
have your comments considered.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search,’’ and enter the docket
number excluding the last three digits in
the Docket Number field (i.e., CP11–
512). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/
esubscribenow.htm.
2 See
the previous discussion on the methods for
filing comments.
VerDate Mar<15>2010
15:12 Dec 28, 2011
Jkt 226001
Dated: December 21, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–33312 Filed 12–28–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR10–30–002]
EasTrans, LLC; Notice of Motion for
Extension of Rate Case Filing Deadline
Take notice that on December 16,
2011, EasTrans, LLC (EasTrans) filed a
request for an extension consistent with
the Commission’s revised policy of
periodic review from a triennial to a five
year period. The Commission in Order
No. 735 modified its policy concerning
periodic reviews of rates charges by
section 311 and Hinshaw pipelines to
extend the cycle for such reviews from
three to five years.1 Therefore, EasTrans
requests that the date for its next rate
filing be extended to March 31, 2014,
which is five years from the date of
EasTrans’ most recent rate filing with
this Commission.
Any person desiring to participate in
this rate proceeding must file a motion
to intervene or to protest this filing must
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Protests will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Any person wishing to become a party
must file a notice of intervention or
motion to intervene, as appropriate.
Such notices, motions, or protests must
be filed on or before the date as
indicated below. Anyone filing an
intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
1 Contract Reporting Requirements of Intrastate
Natural Gas Companies, Order No. 735, 131 FERC
¶ 61,150 (May 20, 2010).
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
81927
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 3, 2012.
Dated: December 21, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–33309 Filed 12–28–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL12–15–000]
Shiloh III Wind Project, LLC; Notice of
Petition for Declaratory Order
Take notice that on December 15,
2011, pursuant to section 201 of the
Federal Power Act, 16 U.S.C. 824,
Shiloh III Wind Project, LLC filed a
Petition for Declaratory Order,
requesting that the Federal Energy
Regulatory Commission (Commission)
disclaim jurisdiction over the OwnerLessor in a structure lease financing
transaction for wind powered
generation and related interconnection
facilities located in Solano County,
California, as set forth in the abovereferenced proceeding.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
E:\FR\FM\29DEN1.SGM
29DEN1
Agencies
[Federal Register Volume 76, Number 250 (Thursday, December 29, 2011)]
[Notices]
[Pages 81926-81927]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-33312]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP11-512-000]
National Fuel Gas Supply Corporation; Notice of Availability of
the Environmental Assessment for the Proposed Line N 2012 Expansion
Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared an environmental assessment (EA) for the Line
N 2012 Expansion Project (Project), proposed by National Fuel Gas
Supply Corporation (National Fuel) in the above referenced docket.
National Fuel proposes to construct and operate the Project in
Washington County, Pennsylvania to create new transportation capacity
on the existing Line N for emerging Marcellus Shale gas production, as
well as to generate adequate pressure to redeliver this gas to Texas
Eastern Transmission Corporation. The Project would increase available
capacity by approximately 150,000 dekatherms per day.
The EA assesses the potential environmental effects of the
construction and operation of the Project in accordance with the
requirements of the National Environmental Policy Act (NEPA). The FERC
staff concludes that approval of the proposed Project, with appropriate
mitigating measures, would not constitute a major Federal action
significantly affecting the quality of the human environment.
The proposed Line N 2012 Expansion Project includes the following
facilities:
Replacement of 4.85 miles of 24-inch-diameter natural gas
pipeline;
Installation of two 10,280 horsepower gas-fired turbine-
driven compressors at the existing Buffalo Compressor Station;
The construction of a pig launcher/receiver \1\ at
milepost 4.85; and
---------------------------------------------------------------------------
\1\ A ``pig'' is a tool that is inserted into and moves through
the pipeline, and is used for cleaning the pipeline, internal
inspections, or other purposes.
---------------------------------------------------------------------------
The replacement of 20-inch-diameter pipeline at four road
crossings south of the Buffalo Compressor Station.
The FERC staff mailed copies of the EA to Federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American tribes;
potentially affected landowners and other interested individuals and
groups; newspapers and libraries in the project area; and parties to
this proceeding. In addition, the EA is available for public viewing on
the FERC's Web site (www.ferc.gov) using the eLibrary link. A limited
number of copies of the EA are available for distribution and public
inspection at: Federal Energy Regulatory Commission, Public Reference
Room, 888 First Street NE., Room 2A, Washington, DC 20426, (202) 502-
8371.
Any person wishing to comment on the EA may do so. Your comments
should focus on the potential environmental effects, reasonable
alternatives, and measures to avoid or lessen environmental impacts.
The more specific your comments, the more useful they will be. To
ensure that the Commission has the opportunity to consider your
comments prior to making its decision on this project, it is important
that we receive your comments in Washington, DC on or before January
25, 2012.
For your convenience, there are three methods you can use to file
your comments to the Commission. In all instances, please reference the
project docket number (CP11-512-000) with your submission. The
Commission encourages electronic filing of comments and has expert
staff available to assist you at (202) 502-8258 or efiling@ferc.gov.
(1) You can file your comments electronically using the eComment
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for submitting brief,
text-only comments on a project;
(2) You can also file your comments electronically using the
eFiling feature
[[Page 81927]]
on the Commission's Web site (www.ferc.gov) under the link to Documents
and Filings. With eFiling, you can provide comments in a variety of
formats by attaching them as a file with your submission. New eFiling
users must first create an account by clicking on ``eRegister.'' You
must select the type of filing you are making. If you are filing a
comment on a particular project, please select ``Comment on a Filing'';
or
(3) You can file a paper copy of your comments by mailing them to
the following address: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC
20426.
Any person seeking to become a party to the proceeding must file a
motion to intervene pursuant to Rule 214 of the Commission's Rules of
Practice and Procedures (18 CFR 385.214).\2\ Only intervenors have the
right to seek rehearing of the Commission's decision. The Commission
grants affected landowners and others with environmental concerns
intervenor status upon showing good cause by stating that they have a
clear and direct interest in this proceeding which no other party can
adequately represent. Simply filing environmental comments will not
give you intervenor status, but you do not need intervenor status to
have your comments considered.
---------------------------------------------------------------------------
\2\ See the previous discussion on the methods for filing
comments.
---------------------------------------------------------------------------
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the
eLibrary link, click on ``General Search,'' and enter the docket number
excluding the last three digits in the Docket Number field (i.e., CP11-
512). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/esubscribenow.htm.
Dated: December 21, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-33312 Filed 12-28-11; 8:45 am]
BILLING CODE 6717-01-P