Department of Energy February 22, 2011 – Federal Register Recent Federal Regulation Documents
Results 1 - 13 of 13
Equipment Price Forecasting in Energy Conservation Standards Analysis
The U.S. Department of Energy (DOE) seeks information related to potential technical improvements its energy conservation standards rulemaking analysis, and requests comment on corresponding revisions to the analysis for energy conservation standards for refrigerators, refrigerator-freezers and freezers.
Nationwide Categorical Waivers Under Section 1605 (Buy American) of the American Recovery and Reinvestment Act of 2009 (Recovery Act)
The U.S. Department of Energy (DOE) is hereby granting a nationwide limited waiver of the Buy American requirements of section 1605 of the Recovery Act under the authority of Section 1605(b)(2) (iron, steel, and the relevant manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality) with respect to (1) two-stage, steam heated absorption chillers rated at 500-1,500 tons; (2) single wall evacuated tube collectors for solar thermal systems (when used in an educational context for the purposes of comparing relative efficiency of solar thermal technologies); (3) 2-ton adsorption chillers (for educational purposes, or where alternative technologies are not serviceable); (4) LED Lamp and controller for studio lights in a television broadcast studio (where a CRI (Color Rendition Index) sufficient to render accurate flesh tones and natural colors and a precise color tuning control to dial in exact color temperature for accurate colors under multiple lighting setups are required); (5) Global Positioning System (GPS) Time Source Modules (to serve as direct communication link between a county or city's Traffic Management System (TMS) and the Caltrans Traffic Signal Management and Surveillance System (CTNET)); and (6) elongated wall-hung rear spud toilets (bowl and hardware) that will be used on eligible EERE Recovery Act-funded projects.
Nationwide Limited Public Interest Waiver Under Section 1605 (Buy American) of the American Recovery and Reinvestment Act of 2009 (Recovery Act)
The U.S. Department of Energy (DOE) is hereby granting a six- month extension of the amended nationwide limited waiver of the Buy American requirements of section 1605 of the Recovery Act under the authority of section 1605(b)(1) (amended public interest waiver), with respect to the following solar photo-voltaic (PV) equipment: (1) Domestically-manufactured modules containing foreign-manufactured cells, (2) Foreign-manufactured modules, when completely comprised of domestically-manufactured cells, and (3) Any ancillary items and equipment (including, but not limited to, charge controllers, combiners and disconnect boxes, breakers and fuses, racks, trackers, lugs, wires, cables and all otherwise incidental equipment with the exception of inverters and batteries) when utilized in a solar installation involving a U.S. manufactured PV module, or a module manufactured abroad but comprised exclusively of domestically-manufactured cells until August 6, 2011. This waiver expires August 6, 2011 (six months from the date of expiration of the original waiver). Recipients of EERE Recovery Act funds who have taken substantial steps to commit funds for the purchase of the items covered in this waiver by August 6, 2011 will not be impacted by the expiration of this waiver.
Advanced Scientific Computing Advisory Committee
This notice announces a meeting of the Advanced Scientific Computing Advisory Committee (ASCAC). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register.
National Coal Council
This notice announces a meeting of the National Coal Council (NCC). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register.
Annual Update of Filing Fees
In accordance with 18 CFR 381.104, the Commission issues this update of its filing fees. This Final Rule provides the yearly update using data in the Commission's Management, Administrative, and Payroll System to calculate the new fees. The purpose of updating is to adjust the fees on the basis of the Commission's costs for Fiscal Year 2010.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.