Notice of Effectiveness of Exempt Wholesale Generator Status, 9771 [2011-3810]
Download as PDF
Federal Register / Vol. 76, No. 35 / Tuesday, February 22, 2011 / Notices
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site
at https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–12966–002) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: February 15, 2011.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
Take notice that during the month of
January 2011, the status of the abovecaptioned entities as Exempt Wholesale
Generators or Foreign Utility Companies
became effective by operation of the
Commission’s regulations. 18 CFR
366.7(a).
Dated: February 14, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–3808 Filed 2–18–11; 8:45 am]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
[Docket No. EF11–5–000]
Notice of Effectiveness of Exempt
Wholesale Generator Status
Docket No.
EG11–8–000
EG11–9–000
EG11–10–000
EG11–11–000
EG11–12–000
EG11–13–000
EG11–14–000
EG11–15–000
EG11–16–000
EG11–17–000
EG11–18–000
EG11–19–000
EG11–20–000
EG11–21–000
EG11–22–000
EG11–23–000
EG11–24–000
EG11–25–000
EG11–26–000
EG11–27–000
EG11–28–000
EG11–29–000
EG11–30–000
Jkt 223001
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
[EG11–8–000, EG11–9–000, EG11–10–000,
et al.]
mstockstill on DSKH9S0YB1PROD with NOTICES
FC11–1–000
FC11–2–000
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
16:51 Feb 18, 2011
EG11–31–000
EG11–32–000
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on February 22, 2011.
[FR Doc. 2011–3810 Filed 2–18–11; 8:45 am]
DEPARTMENT OF ENERGY
VerDate Mar<15>2010
Paradise Solar Urban Renewal, LLC ......................
Red Mesa Wind, LLC .........
Covanta Burnaby Renewable Energy, Inc ..............
Starwood Solar V, LLC .......
Dated: February 14, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–3884 Filed 2–18–11; 8:45 am]
Cedar Creek II, LLC ...........
PSEG New Haven LLC ......
AES Laurel Mountain, LLC
Community Wind North,
LLC ..................................
Community Wind North 1
LLC ..................................
Community Wind North 2
LLC ..................................
Community Wind North 3
LLC ..................................
Community Wind North 5
LLC ..................................
Community Wind North 6
LLC ..................................
Community Wind North 7
LLC ..................................
Community Wind North 8
LLC ..................................
Community Wind North 9
LLC ..................................
Community Wind North 10
LLC ..................................
Community Wind North 11
LLC ..................................
Community Wind North 13
LLC ..................................
Community Wind North 15
LLC ..................................
Duke Energy Fayette II,
LLC ..................................
Duke Energy Hanging Rock
II, LLC .............................
Duke Energy Lee II, LLC ....
Duke Energy Vermillion II,
LLC ..................................
Duke Energy Washington II,
LLC ..................................
Snowflake Power, LLC .......
Evergreen Wind Power III,
LLC ..................................
Docket No.
9771
[Docket Nos. OR96–2–018; IS98–1–006;
Docket Nos. OR92–8–033; OR93–5–020;
OR94–4–021; Docket No. IS06–215–003;
Docket No. IS06–220–002]
Western Area Power Administration;
Notice of Filing
SFPP, L.P.; SFPP, L.P.; SFPP, L.P.;
SFPP, L.P.; Notice of Filing
Take notice that on February 7, 2011,
the Western Area Power Administration
submitted a notice of complete
cancellation of its baseline tariff filed on
September 30, 2010, to be effective
February 4, 2011.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
Take notice that on February 10, 2011,
the SFPP, L.P. filed with the
Commission a proposal to provide
refunds to shippers who were not
litigants in the captioned dockets, Such
shippers may be entitled to refunds
pursuant to the Commission’s orders
dated December 8, 2006 (SFPP, L.P., 117
FERC ¶ 61, 285 (2007)), December 26,
2007 (SFPP, L.P., 121 FERC ¶ 61,240
(2007)), and February 5, 2008 (SFPP,
L.P., 122 FERC ¶ 61,133 (2008)). SFPP
states that the cited orders may have
modified the refund amounts due
shippers under prior orders in the
captioned dockets, and that those
shippers may in fact owe SFPP sums
that it is entitled to recoup from those
shippers. To assure that it recovers the
sums due it, SFPP proposes to set aside
as a reserve 29.74 percent of the total
additional refunds it had determined are
due certain shippers that did not
participate in the litigation in the cited
dockets. Thus the total amount refunds
remaining due could be reduced by
sums still due SFPP, but which it fails
to collect within 180 days after a
Commission order issues. Because the
proposal it a part of an uncontested
settlement, the Commission will shorten
the comment period to 10 calendar
days, or Friday, February 25, 2011.
Portions of the filing are confidential
and shippers concerned with potential
impact on their refunds should contact
SFPP directly by calling Charles
Federal Energy Regulatory
Commission
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
E:\FR\FM\22FEN1.SGM
22FEN1
Agencies
[Federal Register Volume 76, Number 35 (Tuesday, February 22, 2011)]
[Notices]
[Page 9771]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-3810]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[EG11-8-000, EG11-9-000, EG11-10-000, et al.]
Notice of Effectiveness of Exempt Wholesale Generator Status
------------------------------------------------------------------------
Docket No.
------------------------------------------------------------------------
Cedar Creek II, LLC.................................... EG11-8-000
PSEG New Haven LLC..................................... EG11-9-000
AES Laurel Mountain, LLC............................... EG11-10-000
Community Wind North, LLC.............................. EG11-11-000
Community Wind North 1 LLC............................. EG11-12-000
Community Wind North 2 LLC............................. EG11-13-000
Community Wind North 3 LLC............................. EG11-14-000
Community Wind North 5 LLC............................. EG11-15-000
Community Wind North 6 LLC............................. EG11-16-000
Community Wind North 7 LLC............................. EG11-17-000
Community Wind North 8 LLC............................. EG11-18-000
Community Wind North 9 LLC............................. EG11-19-000
Community Wind North 10 LLC............................ EG11-20-000
Community Wind North 11 LLC............................ EG11-21-000
Community Wind North 13 LLC............................ EG11-22-000
Community Wind North 15 LLC............................ EG11-23-000
Duke Energy Fayette II, LLC............................ EG11-24-000
Duke Energy Hanging Rock II, LLC....................... EG11-25-000
Duke Energy Lee II, LLC................................ EG11-26-000
Duke Energy Vermillion II, LLC......................... EG11-27-000
Duke Energy Washington II, LLC......................... EG11-28-000
Snowflake Power, LLC................................... EG11-29-000
Evergreen Wind Power III, LLC.......................... EG11-30-000
Paradise Solar Urban Renewal, LLC...................... EG11-31-000
Red Mesa Wind, LLC..................................... EG11-32-000
Covanta Burnaby Renewable Energy, Inc.................. FC11-1-000
Starwood Solar V, LLC.................................. FC11-2-000
------------------------------------------------------------------------
Take notice that during the month of January 2011, the status of
the above-captioned entities as Exempt Wholesale Generators or Foreign
Utility Companies became effective by operation of the Commission's
regulations. 18 CFR 366.7(a).
Dated: February 14, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-3810 Filed 2-18-11; 8:45 am]
BILLING CODE 6717-01-P