Department of Energy August 19, 2010 – Federal Register Recent Federal Regulation Documents
Results 1 - 10 of 10
Energy Conservation Program for Consumer Products: Decision and Order Granting a Waiver to GE From the Department of Energy Residential Refrigerator and Refrigerator-Freezer Test Procedure
The U.S. Department of Energy (DOE) gives notice of the decision and order (Case No. RF-015) that grants to the General Electric Company (GE) a waiver from the DOE electric refrigerator and refrigerator-freezer test procedure for certain basic models containing relative humidity sensors and adaptive control anti-sweat heaters. Under today's decision and order, GE shall be required to test and rate its refrigerator-freezers with relative humidity sensors and adaptive control anti-sweat heaters using an alternate test procedure that takes this technology into account when measuring energy consumption.
Blue Ribbon Commission on America's Nuclear Future, Disposal Subcommittee
This notice announces an open meeting of the Disposal Subcommittee. The Disposal Subcommittee is a subcommittee of the Blue Ribbon Commission on America's Nuclear Future (the Commission). The establishment of subcommittees is authorized in the Commission's charter. The Commission was organized pursuant to the Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) (the Act). This notice is provided in accordance with the Act.
State Energy Advisory Board (STEAB)
This notice announces a meeting of the State Energy Advisory Board (STEAB). The Federal Advisory Committee Act (Pub. L. 92-463; 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register.
Record of Decision and Floodplain Statement of Findings; Kemper County IGCC Project, Kemper County, MS
The Department of Energy (DOE) prepared an Environmental Impact Statement (EIS) (DOE/EIS-0409) to assess the environmental impacts associated with a proposed project designed, constructed, operated, and owned by Mississippi Power, a Southern Company subsidiary. The U.S. Army Corps of Engineers (USACE) was a cooperating agency in the preparation of this EIS. The project would demonstrate advanced power generation systems using Integrated Gasification Combined Cycle (IGCC) technology at an undeveloped site in Kemper County, MS. DOE's proposed action has two components: first, to provide cost- shared financial assistance and, second, to issue a loan guarantee. After careful consideration of the potential environmental impacts and other factors such as program goals and objectives, DOE has decided that it will provide, through a cooperative agreement with Southern Company Services (SCS), also a Southern Company subsidiary, $270 million in cost-shared funding under DOE's Clean Coal Power Initiative (CCPI) program for the project. A separate decision would be made regarding the loan guarantee; DOE would announce that decision in a subsequent Record of Decision.
Energy Conservation Program for Consumer Products: Decision and Order Granting a Waiver to LG From the Department of Energy Residential Refrigerator and Refrigerator-Freezer Test Procedure
The U.S. Department of Energy (DOE) gives notice of the decision and order (Case No. RF-016) that grants to LG Electronics, Inc. (LG) a waiver from the DOE electric refrigerator and refrigerator- freezer test procedure for certain basic models containing relative humidity sensors and adaptive control anti-sweat heaters. Under today's decision and order, LG shall be required to test and rate its refrigerator-freezers with relative humidity sensors and adaptive control anti-sweat heaters using an alternate test procedure that takes this technology into account when measuring energy consumption.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.