Boott Hydropower, Inc.; Eldred L Field Hydroelectric Facility Trust; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 51258 [2010-20503]
Download as PDF
51258
Federal Register / Vol. 75, No. 160 / Thursday, August 19, 2010 / Notices
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2010–20502 Filed 8–18–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2790–055]
Boott Hydropower, Inc.; Eldred L Field
Hydroelectric Facility Trust; Notice of
Application for Amendment of License
and Soliciting Comments, Motions To
Intervene, and Protests
emcdonald on DSK2BSOYB1PROD with NOTICES
August 10, 2010.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Amendment
of License.
b. Project No.: 2790–055.
c. Date Filed: July 6, 2010.
d. Applicant: Boott Hydropower, Inc.
and Eldred L Field Hydroelectric
Facility Trust.
e. Name of Project: Lowell
Hydroelectric Project.
f. Location: The project is located on
the Merrimack River in Middlesex
County, Massachusetts.
g. Pursuant to: Federal Power Act, 16
U.S.C. 791a–825r.
h. Applicant Contact: Kevin Webb,
Vice Regulatory Affairs Coordinator,
Boott Hydropower, Inc., One Tech
Drive, Suite 220, Andover, MA 01810.
Tel: (978) 681–1900 Ext 809.
i. FERC Contact: Any questions on
this notice should be addressed to
Vedula Sarma at (202) 502–6190 or
vedula.sarma@ferc.gov.
j. Deadline for filing comments and or
motions: September 10, 2010.
Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov/docs-filing/
efiling.asp). Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system (https://www.ferc.gov/
docs-filing/ecomment.asp) and must
include name and contact information
at the end of comments. The
Commission strongly encourages
electronic filings.
All documents (original and seven
copies) filed by paper should be sent to:
VerDate Mar<15>2010
17:05 Aug 18, 2010
Jkt 220001
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. Please include
the project number (P–2790–055) on any
comments or motions filed.
The Commission’s Rules of Practice
and Procedure require all interveners
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervener files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Application: The
licensees request authorization to
replace the existing 5-foot-high wooden
flashboard system on the Pawtucket
Dam with an identical height pneumatic
crest gate system. The licensed normal
pool elevation of 92.2 feet msl (NGVD
1929) will not change. Additionally,
during the interim period of approval of
the amendment request and completion
of construction of the pneumatic crest
gate system, the licensees request a
temporary modification to the height of
the existing wooden flashboard’s
support pins from 5 feet exposed to 4.5
feet exposed; the top of the wooden
flashboards will be six inches higher
than the top of the support pins.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE, Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site
using the ‘‘eLibrary’’ link at https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp . Enter the docket
number excluding the last three digits
(P–2790) in the docket number field to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via e-mail of new filings and
issuances related to this or other
pending projects. For assistance, call
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2010–20503 Filed 8–18–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
August 11, 2010.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1403–001.
Applicants: Stephentown Regulation
Services LLC.
Description: Stephentown Regulation
Services LLC submits redlined and
clean versions of their market-based rate
tariff.
Filed Date: 08/10/2010.
Accession Number: 20100811–0201.
Comment Date: 5 p.m. Eastern Time
on Tuesday, August 31, 2010.
Docket Numbers: ER10–2189–000.
Applicants: NASDAQ OMX
Commodities Clearing-Delivery, LLC.
Description: NASDAQ OMX
Commodities Clearing-Delivery LLC
submits tariff filing per 35.12: Market-
E:\FR\FM\19AUN1.SGM
19AUN1
Agencies
[Federal Register Volume 75, Number 160 (Thursday, August 19, 2010)]
[Notices]
[Page 51258]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-20503]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2790-055]
Boott Hydropower, Inc.; Eldred L Field Hydroelectric Facility
Trust; Notice of Application for Amendment of License and Soliciting
Comments, Motions To Intervene, and Protests
August 10, 2010.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Amendment of License.
b. Project No.: 2790-055.
c. Date Filed: July 6, 2010.
d. Applicant: Boott Hydropower, Inc. and Eldred L Field
Hydroelectric Facility Trust.
e. Name of Project: Lowell Hydroelectric Project.
f. Location: The project is located on the Merrimack River in
Middlesex County, Massachusetts.
g. Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Kevin Webb, Vice Regulatory Affairs
Coordinator, Boott Hydropower, Inc., One Tech Drive, Suite 220,
Andover, MA 01810. Tel: (978) 681-1900 Ext 809.
i. FERC Contact: Any questions on this notice should be addressed
to Vedula Sarma at (202) 502-6190 or vedula.sarma@ferc.gov.
j. Deadline for filing comments and or motions: September 10, 2010.
Comments, protests, and interventions may be filed electronically
via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site (https://www.ferc.gov/docs-filing/efiling.asp). Commenters can submit brief comments up to
6,000 characters, without prior registration, using the eComment system
(https://www.ferc.gov/docs-filing/ecomment.asp) and must include name
and contact information at the end of comments. The Commission strongly
encourages electronic filings.
All documents (original and seven copies) filed by paper should be
sent to: Secretary, Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. Please include the project number
(P-2790-055) on any comments or motions filed.
The Commission's Rules of Practice and Procedure require all
interveners filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervener files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency. A copy
of any motion to intervene must also be served upon each representative
of the Applicant specified in the particular application.
k. Description of Application: The licensees request authorization
to replace the existing 5-foot-high wooden flashboard system on the
Pawtucket Dam with an identical height pneumatic crest gate system. The
licensed normal pool elevation of 92.2 feet msl (NGVD 1929) will not
change. Additionally, during the interim period of approval of the
amendment request and completion of construction of the pneumatic crest
gate system, the licensees request a temporary modification to the
height of the existing wooden flashboard's support pins from 5 feet
exposed to 4.5 feet exposed; the top of the wooden flashboards will be
six inches higher than the top of the support pins.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE, Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site using the ``eLibrary'' link at https://elibrary.ferc.gov/idmws/search/fercgensearch.asp . Enter the docket
number excluding the last three digits (P-2790) in the docket number
field to access the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of
new filings and issuances related to this or other pending projects.
For assistance, call 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Any filings must bear in all capital letters the title
``COMMENTS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as applicable,
and the Project Number of the particular application to which the
filing refers.
p. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2010-20503 Filed 8-18-10; 8:45 am]
BILLING CODE 6717-01-P