Department of Energy June 19, 2009 – Federal Register Recent Federal Regulation Documents

Combined Notice of Filings #1
Document Number: E9-14467
Type: Notice
Date: 2009-06-19
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: E9-14466
Type: Notice
Date: 2009-06-19
Agency: Department of Energy, Federal Energy Regulatory Commission
North American Electric Reliability Corporation; Notice of Filing
Document Number: E9-14450
Type: Notice
Date: 2009-06-19
Agency: Department of Energy, Federal Energy Regulatory Commission
Central Ferry-Lower Monumental Transmission Line Project
Document Number: E9-14448
Type: Notice
Date: 2009-06-19
Agency: Bonneville Power Administration, Department of Energy
BPA intends to prepare an EIS in accordance with the National Environmental Policy Act (NEPA) on the construction, operation, and maintenance of a proposed 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from a new BPA 500-kV Central Ferry Substation (separately proposed to be built in northwestern Garfield County, Washington to interconnect proposed wind projects in that area), to BPA's existing 500-kV Lower Monumental Substation in Walla Walla County, Washington. BPA is considering two routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of both routes would parallel existing BPA lines in the area. One routing alternative for the transmission line is about 38 miles long, and the other is about 40 miles long. The proposed transmission line is needed to increase transmission capacity to respond to requests for transmission service in this area.
Application To Amend Presidential Permit; Bangor Hydro-Electric Company
Document Number: E9-14447
Type: Notice
Date: 2009-06-19
Agency: Department of Energy
Bangor Hydro-Electric Company (BHE) has applied to amend the Presidential permit issued in Order No. PP-89-1.
Application to Export Electric Energy; Hunt Electric Power Marketing, L.L.C.
Document Number: E9-14446
Type: Notice
Date: 2009-06-19
Agency: Department of Energy
Hunt Electric Power Marketing, L.L.C. (HEPM) has applied for authority to transmit electric energy from the United States to Mexico pursuant to section 202(e) of the Federal Power Act.
Office Electricity Delivery and Energy Reliability; Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act
Document Number: E9-14445
Type: Notice
Date: 2009-06-19
Agency: Department of Energy
On February 6, 2009, the Florida Municipal Power Agency, as owner of a new base load electric powerplant, submitted a coal capability self-certification to the Department of Energy (DOE) pursuant to section 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations in 10 CFR 501.60, 61. Section 201(d) of FUA requires DOE to publish a notice of receipt of self-certifications in the Federal Register.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.