Riverbank USA Holdings Corp.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications, 29200-29201 [E9-14454]
Download as PDF
mstockstill on PROD1PC66 with NOTICES
29200
Federal Register / Vol. 74, No. 117 / Friday, June 19, 2009 / Notices
impounded waters are comprised of
West Grand, Junior, Pocumcus, Pug,
Bottle, Norway, and Scraggly lakes.
The approximately 535-foot-long by
15-foot-high Farm Cove Dike is located
approximately 3.5 miles west of the
main outlet dam to West Grand Lake.
The dike comprises a 10-foot-wide by
30-foot-long fishway. The dike has no
gates or other flow controls; the only
flow passing capability is through the
fishway.
No new construction is proposed for
the project.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
VerDate Nov<24>2008
16:25 Jun 18, 2009
Jkt 217001
representative of the applicant specified
in the particular application.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–14455 Filed 6–18–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13358–000]
Riverbank USA Holdings Corp.; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
June 15, 2009.
On January 27, 2009, Riverbank USA
Holdings Corp. filed an application
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Verplanck Pumped
Storage Project No. 13358–000, to be
located in the vicinity of the Verplanck
Quarry within the town of Cortlandt in
West Chester, New York.
The proposed Verplanck Pumped
Storage Project would consist of: (1) The
Verplanck Quarry (upper reservoir); (2)
four 13-foot diameter vertical penstocks
leading to a powerhouse 2,000 feet
underground; (3) a powerhouse
containing four 250-megawatt (MW)
units with a total installed capacity of
1,000 MW; (4) water leaving the
turbines would be temporarily stored in
six underground storage galleries (lower
reservoir); and (5) a new double circuit
345-kilovolt transmission line,
approximately 1.0 mile long. The
estimated average annual energy
production of the project would be
2,190 gigawatt-hours.
Applicant Contact: Mr. John Douglas,
President and CEO, Riverbank Power
Corporation, Royal Bank Plaza, South
Tower, Box 166, 200 Bay Street, Suite
3110, Toronto, Ontario M5J2J4 Canada;
416–861–0092 ext. 156.
FERC Contact: Patrick Murphy, (202)
502–8755.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paper-
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp.
More information about this project
can be viewed or printed on the
‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13358) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–14456 Filed 6–18–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13359–000]
Riverbank USA Holdings Corp.; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions to Intervene, and
Competing Applications
June 15, 2009.
On January 27, 2009, Riverbank USA
Holdings Corp. filed an application
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Tomkins Cove Pumped
Storage Project No. 13359–000, to be
located in the vicinity of Tomkins Cove,
an unincorporated hamlet in the town of
Stony Point, Rockland County, New
York.
The proposed Tomkins Cove Pumped
Storage Project consists of: (1) The
Tilden Tomkins Cove Quarry (upper
reservoir); (2) four 13-foot diameter
vertical penstocks leading to a
powerhouse 2000 feet underground; (3)
a powerhouse containing four 250megawatt (MW) units with a total
installed capacity of 1,000 MW; (4)
water leaving the turbines, would be
temporarily stored in six underground
storage galleries (lower reservoir); and
(5) a new double circuit 345-kilovolt
transmission line, approximately 1.0mile long. The estimated average annual
energy production of the project would
be 2,190 gigawatt-hours.
Applicant Contact: Mr. John Douglas,
President and CEO; c/o Riverbank
Power Corporation; Royal Bank Plaza;
E:\FR\FM\19JNN1.SGM
19JNN1
Federal Register / Vol. 74, No. 117 / Friday, June 19, 2009 / Notices
South Tower, Box 166; 200 Bay Street,
Suite 3110; Toronto, Ontario, M5J2J4
Canada.
FERC Contact: Patrick Murphy, (202)
502–8755.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp.
More information about this project
can be viewed or printed on the
‘‘eLibrary’’ link of Commission’s Web
site at https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13359) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–14454 Filed 6–18–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
mstockstill on PROD1PC66 with NOTICES
June 11, 2009.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER99–2311–010;
ER97–2846–013.
Applicants: Carolina Power & Light
Company; Florida Power Corporation.
Description: Revisions to Updated
Market Power Analysis of Progress
Energy, Inc.
Filed Date: 06/10/2009.
Accession Number: 20090610–5157.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 1, 2009.
Docket Numbers: ER05–6–108; EL02–
111–129; EL03–212–125; EL04–135–112.
Applicants: PJM Interconnection;
Midwest Independent Transmission
System Operator, Inc.
VerDate Nov<24>2008
16:25 Jun 18, 2009
Jkt 217001
Description: PJM Interconnection, LLC
et al. submits joint response to the 5/8/
09 deficiency notice issue by the
Commission.
Filed Date: 06/08/2009.
Accession Number: 20090610–0052.
Comment Date: 5 p.m. Eastern Time
on Monday, June 29, 2009.
Docket Numbers: ER08–1574–005.
Applicants: ORNI 18, LLC.
Description: Notice of Non-Material
Change in Status of ORNI 18, LLC.
Filed Date: 06/10/2009.
Accession Number: 20090610–5144.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 1, 2009.
Docket Numbers: ER09–1013–001.
Applicants: PacifiCorp.
Description: PacfiCorp submits
executed Appendix A, Exhibit 3.
Filed Date: 06/09/2009.
Accession Number: 20090610–0109.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 30, 2009.
Docket Numbers: ER09–1127–001.
Applicants: Wheelabrator South
Broward Inc.
Description: Wheelabrator South
Broward Inc submits substitute tariff
sheet correcting a typo error.
Filed Date: 06/09/2009.
Accession Number: 20090610–0110.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 30, 2009.
Docket Numbers: ER09–1281–000.
Applicants: California Independent
System Operator Corporation.
Description: California Independent
System Operator submits an executed
signature page.
Filed Date: 06/09/2009.
Accession Number: 20090611–0034.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 30, 2009.
Docket Numbers: ER09–1288–000.
Applicants: Saracen Energy LP.
Description: Saracen Energy LP
submits a Notice of Cancellation of Rate
Schedule FERC No. 1.
Filed Date: 06/09/2009.
Accession Number: 20090610–0115.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 30, 2009.
Docket Numbers: ER09–1289–000.
Applicants: Saracen Energy Partners,
LP.
Description: Saracen Energy Partners,
LP submits a Notice of Cancellation of
Rate Schedule FERC No. 1.
Filed Date: 06/09/2009.
Accession Number: 20090610–0116.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 30, 2009.
Docket Numbers: ER09–608–001.
Applicants: Tucson Electric Power
Company.
Description: Tucson Electric Power
Company submits revised tariff sheet to
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
29201
its Open Access Transmission to reflect
that is has received a waiver of North
American Energy Standards Board.
Filed Date: 06/09/2009.
Accession Number: 20090610–0108.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 30, 2009.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR09–5–000.
Applicants: North American Electric
Reliability Corporation.
Description: Petition of the North
American Electric Reliability
Corporation for Approval of Proposed
Revisions to the Standards Development
Process of Texas Regional Entity and
Related Regional Entity Rules.
Filed Date: 06/08/2009.
Accession Number: 20090608–5132.
Comment Date: 5 p.m. Eastern Time
on Monday, June 29, 2009.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
E:\FR\FM\19JNN1.SGM
19JNN1
Agencies
[Federal Register Volume 74, Number 117 (Friday, June 19, 2009)]
[Notices]
[Pages 29200-29201]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-14454]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13359-000]
Riverbank USA Holdings Corp.; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions to
Intervene, and Competing Applications
June 15, 2009.
On January 27, 2009, Riverbank USA Holdings Corp. filed an
application pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Tomkins Cove Pumped Storage
Project No. 13359-000, to be located in the vicinity of Tomkins Cove,
an unincorporated hamlet in the town of Stony Point, Rockland County,
New York.
The proposed Tomkins Cove Pumped Storage Project consists of: (1)
The Tilden Tomkins Cove Quarry (upper reservoir); (2) four 13-foot
diameter vertical penstocks leading to a powerhouse 2000 feet
underground; (3) a powerhouse containing four 250-megawatt (MW) units
with a total installed capacity of 1,000 MW; (4) water leaving the
turbines, would be temporarily stored in six underground storage
galleries (lower reservoir); and (5) a new double circuit 345-kilovolt
transmission line, approximately 1.0-mile long. The estimated average
annual energy production of the project would be 2,190 gigawatt-hours.
Applicant Contact: Mr. John Douglas, President and CEO; c/o
Riverbank Power Corporation; Royal Bank Plaza;
[[Page 29201]]
South Tower, Box 166; 200 Bay Street, Suite 3110; Toronto, Ontario,
M5J2J4 Canada.
FERC Contact: Patrick Murphy, (202) 502-8755.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp.
More information about this project can be viewed or printed on the
``eLibrary'' link of Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13359) in the docket
number field to access the document. For assistance, call toll-free 1-
866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-14454 Filed 6-18-09; 8:45 am]
BILLING CODE 6717-01-P