Department of Energy December 30, 2008 – Federal Register Recent Federal Regulation Documents
Results 1 - 15 of 15
Energy Conservation Standards for Small Electric Motors: Public Meeting and Availability of the Preliminary Technical Support Document
The Department of Energy (DOE) will hold an informal public meeting to discuss and receive comments on the equipment classes that DOE plans to analyze for purposes of establishing energy conservation standards for small electric motors; the analytical framework, models, and tools that DOE is using to evaluate standards for these products; the results of preliminary analyses performed by DOE for these products; and potential energy conservation standard levels derived from these analyses that DOE could consider for these products. Also, DOE encourages written comments on these subjects. To inform stakeholders and facilitate this process, DOE has prepared an agenda, a preliminary Technical Support Document (preliminary TSD), and briefing materials, which are available at: https://www1.eere.energy.gov/ buildings/appliancestandards/commercial/smallelectricmotors.h tml.
Building Energy Standards Program: Determination Regarding Energy Efficiency Improvements in the Energy Standard for Buildings, Except Low-Rise Residential Buildings, ANSI/ASHRAE/IESNA Standard 90.1-2004
The Department of Energy (DOE) today determines that the 2004 edition of the Energy Standard for Buildings, Except Low-Rise Residential Buildings, American National Standards Institute (ANSI)/ American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) Illuminating Engineering Society of North America (IESNA) Standard 90.1-2004, (Standard 90.1-2004) would achieve greater energy efficiency in buildings subject to the code, than the 1999 edition (Standard 90.1-1999 or the 1999 edition). The quantitative analysis of the energy consumption of buildings built to Standard 90.1- 2004, as compared with buildings built to Standard 90.1-1999, indicates national source energy savings of approximately 13.9 percent of commercial building energy consumption. Site energy savings are estimated to be approximately 11.9 percent. As a result of this positive determination regarding Standard 90.1-2004, each State is required to certify that it has reviewed the provisions of its commercial building code regarding energy efficiency, and updated, as necessary, its code to meet or exceed Standard 90.1-2004. This Notice provides guidance to States on Certifications, and Requests for Extensions of Deadlines for Certification Statements.
Office of Science; Fusion Energy Sciences Advisory Committee
This notice announces a meeting of the Fusion Energy Sciences Advisory Committee. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register.
Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation
This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak Ridge Reservation. The Federal Advisory Committee Act (Pub. L. No. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.
2015 Resource Pool
The Western Area Power Administration (Western), a Federal power marketing agency of the U.S. Department of Energy (DOE), published its 2004 Power Marketing Plan (Marketing Plan) for Western's Sierra Nevada Customer Service Region (SNR) in the Federal Register on June 25, 1999 (64 FR 34417). The Marketing Plan specifies the terms and conditions under which Western will market power from the Central Valley Project (CVP) and the Washoe Project beginning January 1, 2005, and continuing through December 31, 2024. The Marketing Plan provides for a 2015 Resource Pool of up to 2 percent of SNR's marketable power resources. The 2015 Resource Pool will be available for power allocations to preference entities that meet the Eligibility Criteria. Western published its Proposed 2015 Resource Pool Size and Revised Eligibility Criteria in the Federal Register on May 5, 2008 (73 FR 24592). This notice responds to the comments received on the Proposed 2015 Resource Pool Size and Revised Eligibility Criteria and sets forth the Final 2015 Resource Pool Size and Revised Eligibility Criteria. This Federal Register notice is not a call for applications for Federal power allocations. Preference entities who wish to apply for an allocation of power from SNR must submit formal applications in response to Western's Call for 2015 Resource Pool Applications to be published under a separate notice. Application procedures will be set forth in the Call for 2015 Resource Pool Applications.
Sam Rayburn Dam Power Rate Schedule
Pursuant to Delegation Order Nos. 00-037.00, effective December 6, 2001, and 00-001.00C, effective January 31, 2007, the Deputy Secretary has approved and placed into effect on an interim basis Rate Order No. SWPA-60, which increases the power rate for the Sam Rayburn Dam (Rayburn) pursuant to the following Sam Rayburn Dam Rate Schedule:
Promotion of a More Efficient Capacity Release Market
The Federal Regulatory Commission (FERC) is correcting a final rule that appeared in the Federal Register of December 1, 2008 (73 FR 72692). The document revised regulations governing interstate natural gas pipelines to reflect changes in the market for short-term transportation services on pipelines and to improve the efficiency of the Commission's capacity release program.
Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities
The Federal Energy Regulatory Commission affirms its basic determinations in Order No. 697-A, granting rehearing and clarification regarding certain revisions to its regulations and to the standards for obtaining and retaining market-based rate authority for sales of energy, capacity and ancillary services to ensure that such sales are just and reasonable.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.