Department of Energy February 22, 2007 – Federal Register Recent Federal Regulation Documents

Record of Decision and Floodplain Statement of Findings: Site Selection for the Expansion of the Strategic Petroleum Reserve
Document Number: E7-3022
Type: Notice
Date: 2007-02-22
Agency: Department of Energy
DOE has prepared an environmental impact statement (EIS) (DOE/ EIS-0385), pursuant to the National Environmental Policy Act of 1969 (NEPA), to assess the environmental impacts associated with a proposal to expand the crude oil storage capacity of the Strategic Petroleum Reserve (SPR) from 727 million barrels (MMB) to 1 billion barrels, and to fill the Reserve to the full authorized volume of 1 billion barrels. The proposal was to develop one new storage facility and expand the capacity of two or three existing SPR storage facilities. After careful consideration of the environmental impacts of the alternatives, along with an evaluation of SPR distribution capabilities, geological technical assessments, projected costs, and operational impacts associated with existing commercial operations, DOE has decided to develop a new 160 MMB SPR storage facility at Richton (Mississippi), expand the storage capacity at the existing Bayou Choctaw (Louisiana) SPR facility by 33 MMB, expand the storage capacity at the existing Big Hill (Texas) SPR facility by 80 MMB, and fill the Reserve to 1 billion barrels of oil as authorized by Congress. This ROD has been prepared in accordance with the regulations of the Council on Environmental Quality (40 CFR Parts 1500-1508) for implementing NEPA and DOE's NEPA Implementing Procedures (10 CFR Part 1021). The accompanying Floodplain Statement of Findings has been prepared in accordance with DOE's regulations ``Compliance with Floodplain and Wetland Environmental Review Requirements'' (10 CFR Part 1022). Because the decision differs somewhat from the alternatives evaluated in the EIS, DOE has prepared a Supplement Analysis (SA) (DOE/ EIS-0385-SA-1) to determine whether a supplement to the final EIS is required. DOE has determined that the minor modification to the Bayou Choctaw expansion site, i.e., an increase in capacity of 33 MMB compared to 20 MMB as described in the final EIS, is not a substantial change to the proposed action that is relevant to environmental concerns, and there are no significant new circumstances or information relevant to environmental concerns and bearing on the proposed action or its impacts, within the meaning of 40 CFR 1502.9(c)(1) and 10 CFR 1021.314(c). Therefore, a supplement to the SPR final EIS is not needed.
FY 2007-2009 Fish and Wildlife Project Implementation Decision
Document Number: E7-2998
Type: Notice
Date: 2007-02-22
Agency: Bonneville Power Administration, Department of Energy
This notice announces the availability of the ROD for BPA's 2007-2009 Fish and Wildlife Project Implementation Decision. BPA has decided to implement certain new and ongoing fish and wildlife mitigation projects for Fiscal Years 2007 through 2009 that help meet the agency's responsibilities to protect, mitigate and enhance fish and wildlife affected by the development and operation of the Columbia River basin hydroelectric dams from which BPA markets power. This decision is consistent with and tiered to BPA's Fish and Wildlife Implementation Plan Environmental Impact Statement (DOE/EIS-0312, April 2003) and the Fish and Wildlife Implementation Plan ROD (October 31, 2003).