Department of Energy December 6, 2006 – Federal Register Recent Federal Regulation Documents
Results 1 - 18 of 18
Windy Point Wind Energy Project; November 2006
This notice announces the availability of the ROD to offer contract terms for interconnection of up to 250 megawatts of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). BPA has considered both the economic and environmental consequences of taking action to integrate power from the Wind Project into the FCRTS. The Wind Project would be interconnected at BPA's Rock Creek Substation (under construction) along BPA's WautomaJohn Day No. 1 500-kilovolt transmission line. The Wind Project would be located between 6 to 15 miles southeast of Goldendale, Washington, north and northwest of the community of Goodnoe Hills. The project would be east of Highway 97 and south of Hoctor Road, and would be constructed on and next to a high ridgeline overlooking the Columbia River. This decision is consistent with and tiered to BPA's Business Plan Final Environment Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 15, 1995).
Repeal of the Public Utility Holding Company Act of 1935 and Enactment of the Public Utility Holding Company Act of 2005; Transaction Subject to FPA Section 203; Supplemental Notice of Technical Conference
The Federal Energy Regulatory Commission (Commission) is holding a technical conference in Commission Docket No. AD07-2-000 on December 7, 2006, to discuss certain issues raised in rulemakings issued in Commission Docket Nos. RM05-32-000 and RM05-34-000. The Commission is providing the agenda for the conference, a list of participants and providing interested parties an opportunity to file written comments following the conference.
Mandatory Reliability Standards for the Bulk-Power System
On October 20, 2006, the Commission issued a Notice of Proposed Rulemaking on mandatory reliability standards for the Bulk- Power System. 71 FR 64770 (November 3, 2006). The Commission is extending the date to file comments on the proposed rule at the request of Edison Electric Institute and the ISO/RTO Council and is establishing a comment period for twenty revised proposed Reliability Standards that were filed in this docket on behalf of the North American Electric Reliability Council (NERC). The Commission is also opening a new rulemaking proceeding for three new proposed Reliability Standards that were filed by NERC.