Notice of Intent To Prepare an Environmental Impact Statement/Environmental Impact Report for Natomas Levee Improvement Program Phase 4a Landside Improvements Project, Sacramento, CA
The action being taken is preparation of an environmental impact statement/environmental impact report (EIS/EIR) for the Natomas Levee Improvement Program (NLIP) Phase 4a Landside Improvements Project (Phase 4a Project). The Corps is considering a request to issue both 408 permission to the Central Valley Flood Protection Board and 404 permit to Sacramento Area Flood Control Agency (SAFCA) for work on the NLIP. Under 33 U.S.C. 408, the Chief of Engineers may grant permission to alter an existing Federal project if it is not injurious to the public interest and does not impair the usefulness of the project. Under Section 404 of the Clean Water Act, the District Engineer permits the discharge of dredged or fill material into waters of the United States if the discharge meets the requirements of the Environmental Protection Agency's 404(b)(1) guidelines and is not contrary to the public interest. The NLIP is located in Sacramento and Sutter Counties, CA. The 408 permission is required for structural improvements to the Sacramento River east levee and the Natomas Cross Canal south levee. A 404 permit is needed for dredge and discharge of fill materials into waters of the United States resulting from levee improvements, relocation of the Riverside Canal, and development of associated habitat.
Intent To Prepare a Draft Environmental Impact Statement for the Morehead City Harbor Project, Dredged Material Management Plan, Carteret County, NC
The Wilmington District, U.S. Army Corps of Engineers (USACE) is conducting a study to evaluate the long-term (20-year) dredged material placement needs and opportunities for Morehead City Harbor, NC. The study area encompasses Morehead City Harbor and the Ocean Bar approach channels extending seaward to deep water through Beaufort Inlet in Carteret County, near Morehead City, NC. The study will include the preparation of an integrated (combined) Dredged Material Management Plan (DMMP) and Draft Environmental Impact Statement (DEIS) and will identify, evaluate, screen, prioritize, and ultimately optimize placement alternatives resulting in the recommendation of a plan for the placement of dredged materials for at least the next 20 years.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.