Engineers Corps July 10, 2007 – Federal Register Recent Federal Regulation Documents

Availability of Draft Supplemental Environmental Impact Statement for Atlantic Coast of Maryland Shoreline Protection Project-General Reevaluation Study: Borrow Sources for 2010-2044, Worcester County, MD
Document Number: 07-3287
Type: Notice
Date: 2007-07-10
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with the requirements of the National Environmental Policy Act (NEPA), the Baltimore District, U.S. Army Corps of Engineers (USACE), has prepared a Draft Supplemental Environmental Impact Statement (SEIS) for the Atlantic Coast of Maryland Shoreline Protection Project (Atlantic Coast Project) evaluating new borrow sources to provide sand for routine periodic beach nourishment of Ocean City, MD for the years 2010-2044. Existing borrow sources in state waters are anticipated to be exhausted in about 2010. Between 6,800,000 and 15,000,000 cubic yards of sand would be needed through 2044, depending on future storm frequency and intensity. Three offshore shoals in Federal waters are proposed as sand sources: Weaver, Isle of Wight, and ``A.'' Sand may also be dredged from Shoal ``B,'' also known as Bass Grounds or First Lump, in the future, but only if its value as a fishing ground declines substantially. Guidelines to minimize long-term impacts to the offshore shoals were formulated in coordination with resource agency personnel and academic experts. Dredging would be conducted in accordance with these guidelines. Specific dredging plans would be developed in coordination with resource agencies prior to each beach nourishment cycle. We are making the Draft SEIS available to the public for a 45-day review and comment period.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.