Engineers Corps November 2006 – Federal Register Recent Federal Regulation Documents
Results 1 - 8 of 8
Chief of Engineers Environmental Advisory Board
In accordance with Section 10(d)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Chief of Engineers Environmental Advisory Board (EAB). Topic: The EAB will discuss national considerations related to ecosystem restoration through integrated water resources management including the recently announced Twelve Points of Action. The meeting will not focus on issues specific to Louisiana. Date of Meeting: December 6, 2006. Place: Wyndham New Orleans at Canal Place, 100 Rue Iberville, New Orleans, LA. Time: 9 a.m. to 12 p.m. Thirty minutes will be set side for public comment. Members of the public who wish to speak must register prior to the start of the meeting. Registration will begin at 8:30. Statements are limited to 3 minutes.
Public Hearing To Receive Comments for the San Luis Rey River Flood Control Project, From College Blvd. to the Pacific Ocean, San Diego County, CA, Operation and Maintenance for Vegetation and Sediment Management, Draft Supplemental Environmental Impact Statement
The U.S. Army Corps of Engineers, Los Angeles District (Corps) will hold a public hearing to receive comments on the proposed project action as described and evaluated in Draft Supplemental Environmental Impact Statement (SEIS) for the operation and maintenance, related to vegetation and sediment management, of the San Luis Rey River Flood Control Project.
Notice of Availability for the Draft Environmental Impact Statement/Environmental Impact Report for the Burlington Northern Santa Fe (BNSF) Cajon Third Main Track Summit to Keenbrook, San Bernardino County, CA
Pursuant to section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969 (as amended), the U.S. Army Corps of Engineers, Los Angeles District (Corps) Regulatory Branch, in coordination with the County of San Bernardino and in cooperation with U.S. Forest Service, has completed a Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Burlington Northern Santa Fe (BNSF) Third Main Track Summit to Keenbrook Project. The proposed BNSF project requires authorization pursuant to section 404 of the Clean Water Act for approximately 2.95 acres of fill placement in jurisdictional waters of the United States, including wetlands, to construct 15.9 miles of a new main track through the Cajon Pass in San Bernardino County, California. A public hearing will be held at the Norman F. Feldheym Central LibraryBing Wong Auditorium, located at 555 West 6th Street, San Bernardino, CA 92401 on December 5, 2006 from 6 p.m. to 8 p.m.
Public Hearing and Notice of Availability for the Draft Environmental Impact Statement for Widening of the Freeport Ship Channel in Freeport, Brazoria County, TX
The U.S. Army Corps of Engineers, Galveston District announces the release of the Draft Environmental Impact Statement (DEIS), the Draft General Conformity Determination, the public comment period, and the date and location of the Public Hearing, for the Brazos River Harbor Navigation District's (Port Freeport) proposed widening of the Freeport Harbor Ship Channel.
Withdrawal of Notice of Intent to Prepare a Draft Environmental Impact Statement (DEIS) for the Baltimore Metropolitan Water Resources Study-Gwynns Falls in Baltimore County, Maryland
The Baltimore District of the U.S. Army Corps of Engineers (Corps) is withdrawing its intent to prepare a DEIS for the Baltimore Metropolitan Water Resources StudyGwynns Falls in Baltimore County, Maryland. The Notice of Intent for the DEIS was published in the Federal Register on July 9, 1996 (Volume 61, Number 132, Page 36038). Negative environmental impacts of the recommended plan are not significant and the Corps has determined that a DEIS is not appropriate.
Intergovernmental Agreement between the United States Department of the Army and the State of Florida Establishing Interim Targets for the Comprehensive Everglades Restoration Plan
The Army Corps of Engineers and the State of Florida are proposing to establish interim targets for the Comprehensive Everglades Restoration Plan as required by Section 385.39(c) of the Programmatic Regulations for the Comprehensive Everglades Restoration Plan. The purpose of the interim targets is to evaluate progress towards other water related needs of the region provided for in the Comprehensive Everglades Restoration Plan throughout the implementation process. The parties have chosen to memorialize the proposed interim targets in an Interim Targets Agreement. The public is invited to review and comment on the final draft of this Agreement.
Intergovernmental Agreement Among the United States Department of the Army, the United States Department of the Interior, and the State of Florida Establishing Interim Restoration Goals for the Comprehensive Everglades Restoration Plan
The Army Corps of Engineers, the Department of the Interior and the State of Florida are proposing to establish the interim goals for the Comprehensive Everglades Restoration Plan through the Interim Goals Agreement as required by Section 385.38(d) of the Programmatic Regulations for the Comprehensive Everglades Restoration Plan. Interim goals are a mean by which restoration success of the Comprehensive Everglades Restoration Plan may be evaluated at specific points by agency managers, the State of Florida, and Congress throughout the overall planning and implementation process. The public is invited to review and comment on the final draft of this Agreement.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.